Project Information

RERA Certificate No.
P51700011345
Registration No.
REA51700015767
Registration Date
2020-06-17
Developer
METRO CONSTRUCTION Partnership
Architect
Architects Inc
Project Bank
ABHYUDAYA COOPERATIVE BANK LIMITED
Proposed Possession
2020-12-30
Revised Possession
2020-12-30
Extended Possession
2021-12-30
Units Sold
0
Buildings
1
Project Area
6600.00 sq.m
Total FSI
2232.00
Approved FSI
2232.00
MahaRERA QR
METRO RESIDENCY G WING
MahaRERA — P51700011345
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking20
📅Completion2020-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 25.90999984741211 0 0 0
0%
1Bhk 29.75 0 0 0
0%
1Bhk 30.170000076293945 0 0 0
0%
1Bhk 31.989999771118164 0 0 0
0%
1Bhk 32.779998779296875 0 0 0
0%
2Bhk 40.06999969482422 0 0 0
0%
2Bhk 40.09000015258789 0 0 0
0%

G Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.91 14 6 8
43%
1 BHK 29.75 7 1 6
14%
1 BHK 30.17 7 1 6
14%
1 BHK 31.99 7 1 6
14%
1 BHK 32.78 7 2 5
29%
2 BHK 40.07 7 3 4
43%
2 BHK 40.09 7 2 5
29%

Construction Progress

G WING

Basement (if any)100%

G Wing

Excavation100%

G WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

G Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

G WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

G Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

G WING

Plinth100%
Podiums (if any) 0%

G Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

G WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

G Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

G WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

G Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.