📞 +91 98200 30685 ✉️
RERA: A51800043517

Mirador Prangan Phase 1

by Mirador Dewellers Pvt Ltd
Kept in Abeyance P51700013154
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700013154
Registration No.
REA51700023076
Developer
Mirador Dewellers Pvt Ltd
Project Bank
HDFC
Proposed Possession
2022-08-31
Revised Possession
2023-08-28
Extended Possession
1900-01-01
Buildings
4
Project Area
12900.00 sq.m
Total FSI
15527.59
MahaRERA QR
Mirador Prangan Phase 1
MahaRERA — P51700013154
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking4
📅Completion1900-01-01
🚗Open Parking4
🅿️Closed Parking4
📅Completion1900-01-01
🚗Open Parking4
🅿️Closed Parking4
📅Completion1900-01-01
🚗Open Parking4
📅Completion1900-01-01

Apartment Configurations

A1 A And B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.61 8 0 8
0%
1 BHK WITH TERRACE 30.61 8 0 8
0%
1 RK 25.11 28 0 28
0%
1.5 BHK RESIDENTIAL 39.47 44 0 44
0%
OFFICE 10 15.37 1 0 1
0%
OFFICE NO 1 8.99 1 0 1
0%
OFFICE NO 11 7.75 1 0 1
0%
OFFICE NO 12 8.99 1 0 1
0%
OFFICE NO 2 7.75 1 0 1
0%
OFFICE NO 3 15.37 1 0 1
0%
OFFICE NO 4 15.37 1 0 1
0%
OFFICE NO 5 7.75 1 0 1
0%
OFFICE NO 6 8.99 1 0 1
0%
OFFICE NO 7 8.99 1 0 1
0%
OFFICE NO 8 7.75 1 0 1
0%
OFFICE NO 9 15.37 1 0 1
0%

A2 A And B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK RESIDENTIAL 30.61 8 0 8
0%
1 BHK WITH TERRACE 30.61 8 0 8
0%
1 RK RESIDENTIAL 25.11 28 0 28
0%
1.5 BHK RESIDENTIAL 39.47 48 0 48
0%

A3 A And B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK RESIDENTIAL 30.61 8 0 8
0%
1 BHK WITH TERRACE 30.61 8 0 8
0%
1 RK RESIDENTIAL 25.11 28 0 28
0%
1.5 BHK RESIDENTIAL 39.47 48 0 48
0%

B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK RESIDENTIAL 28.61 2 0 2
0%
1 BHK WITH TERRACE 28.61 2 0 2
0%
1 RK RESIDENTIAL 24.45 32 0 32
0%
1.5 BHK RESIDENTIAL 37.47 10 0 10
0%

Construction Progress

A1 A And B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

A2 A And B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

A3 A And B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space 15%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 15%
Open Parking 25%
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting 10%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 10%
Water Supply 15%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.