📞 +91 98200 30685 ✉️
RERA: A51800043517

Mohan Suburbia IIB

by MOHAN LIFESPACES LLP Partnership
Certificate Signed P51700010658
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700010658
Registration No.
REA51700012859
Registration Date
2017-08-31
Developer
MOHAN LIFESPACES LLP Partnership
Architect
Thorat & Mathew Associates
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
2019-03-31
Units Sold
0
Buildings
10
Project Area
5917.85 sq.m
Total FSI
12241.75
Approved FSI
12241.75
MahaRERA QR
Mohan Suburbia IIB
MahaRERA — P51700010658
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking10
📅Completion2016-04-30
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking10
📅Completion2016-04-30
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking10
📅Completion2016-04-30
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking19
📅Completion2016-04-30
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking14
📅Completion2016-04-30
🏗️Proposed Floors10
Sanctioned10
⬇️Basements1
🅿️Closed Parking9
📅Completion2016-04-30
🏗️Proposed Floors10
Sanctioned10
⬇️Basements1
🅿️Closed Parking9
📅Completion2016-04-30
🏗️Proposed Floors10
Sanctioned10
⬇️Basements1
🅿️Closed Parking9
📅Completion2019-03-31
🏗️Proposed Floors10
Sanctioned10
⬇️Basements1
🅿️Closed Parking9
📅Completion2016-04-30
🏗️Proposed Floors10
Sanctioned10
⬇️Basements1
🅿️Closed Parking9
📅Completion2016-04-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 29.920000076293945 0 0 0
0%
1Bhk 30.540000915527344 0 0 0
0%
1Bhk 31.610000610351562 0 0 0
0%
1Bhk 31.639999389648438 0 0 0
0%
1Bhk 31.739999771118164 0 0 0
0%
1Bhk 31.899999618530273 0 0 0
0%
1Bhk 32.040000915527344 0 0 0
0%
1Bhk 32.11000061035156 0 0 0
0%
1Bhk 32.4900016784668 0 0 0
0%
1Bhk 32.63999938964844 0 0 0
0%
1Bhk 33.06999969482422 0 0 0
0%
1Bhk 33.18000030517578 0 0 0
0%
2Bhk 35.34000015258789 0 0 0
0%
2Bhk 38.040000915527344 0 0 0
0%
2Bhk 39.15999984741211 0 0 0
0%
2Bhk 40.34000015258789 0 0 0
0%
2Bhk 40.4900016784668 0 0 0
0%
2Bhk 40.560001373291016 0 0 0
0%
2Bhk 40.83000183105469 0 0 0
0%
2Bhk 41.38999938964844 0 0 0
0%
2Bhk 42.66999816894531 0 0 0
0%
2Bhk 42.9900016784668 0 0 0
0%
2Bhk 43.15999984741211 0 0 0
0%
2Bhk 43.45000076293945 0 0 0
0%
3Bhk 52.20000076293945 0 0 0
0%
3Bhk 53.779998779296875 0 0 0
0%
3Bhk 54.7400016784668 0 0 0
0%
3Bhk 54.970001220703125 0 0 0
0%
3Bhk 55.34000015258789 0 0 0
0%
3Bhk 56.25 0 0 0
0%
3Bhk 57.9900016784668 0 0 0
0%
3Bhk 63.02000045776367 0 0 0
0%
3Bhk 63.209999084472656 0 0 0
0%

K2 Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 40.34 4 4 0
100%
2 BHK 40.49 3 3 0
100%
2 BHK 40.56 4 4 0
100%
2 BHK 40.83 3 3 0
100%
2 BHK 42.67 3 3 0
100%
2 BHK 42.99 3 3 0
100%
2 BHK 43.16 4 4 0
100%
2 BHK 43.45 4 4 0
100%

L2 Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 40.34 4 4 0
100%
2 BHK 40.49 3 3 0
100%
2 BHK 40.56 4 4 0
100%
2 BHK 40.83 3 3 0
100%
2 BHK 42.67 3 3 0
100%
2 BHK 42.99 3 3 0
100%
2 BHK 43.16 4 4 0
100%
2 BHK 43.45 4 4 0
100%

M2 Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 40.34 4 4 0
100%
2 BHK 40.49 3 3 0
100%
2 BHK 40.56 4 4 0
100%
2 BHK 40.83 3 3 0
100%
2 BHK 42.67 3 3 0
100%
2 BHK 42.99 3 3 0
100%
2 BHK 43.16 4 4 0
100%
2 BHK 43.45 4 4 0
100%

N2 Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.9 8 8 0
100%
1 BHK 32.11 8 8 0
100%
1 BHK 33.07 6 6 0
100%
1 BHK 33.18 6 6 0
100%
2 BHK 39.16 3 3 0
100%
2 BHK 41.39 4 4 0
100%
3 BHK 53.78 3 3 0
100%
3 BHK 55.34 4 4 0
100%

O2 Wing

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 52.2 4 4 0
100%
3 BHK 54.74 3 3 0
100%
3 BHK 54.97 3 3 0
100%
3 BHK 56.25 4 4 0
100%
3 BHK 57.99 3 3 0
100%
3 BHK 63.02 8 8 0
100%
3 BHK 63.21 3 3 0
100%

P2 Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.92 3 3 0
100%
1 BHK 30.54 1 1 0
100%
1 BHK 31.61 4 4 0
100%
1 BHK 31.64 3 3 0
100%
1 BHK 31.74 4 4 0
100%
1 BHK 32.04 4 4 0
100%
1 BHK 32.49 3 3 0
100%
1 BHK 32.64 1 1 0
100%
2 BHK 35.34 4 4 0
100%
2 BHK 38.04 3 3 0
100%

S2 Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.92 3 3 0
100%
1 BHK 30.54 1 1 0
100%
1 BHK 31.61 4 4 0
100%
1 BHK 31.64 3 3 0
100%
1 BHK 31.74 4 4 0
100%
1 BHK 32.04 4 4 0
100%
1 BHK 32.49 3 3 0
100%
1 BHK 32.64 1 1 0
100%
2 BHK 35.34 4 4 0
100%
2 BHK 38.04 3 3 0
100%

T2 Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.92 3 3 0
100%
1 BHK 30.54 1 1 0
100%
1 BHK 31.61 4 4 0
100%
1 BHK 31.64 3 3 0
100%
1 BHK 31.74 4 4 0
100%
1 BHK 32.04 4 4 0
100%
1 BHK 32.49 3 3 0
100%
1 BHK 32.64 1 1 0
100%
2 BHK 35.34 4 4 0
100%
2 BHK 38.04 3 3 0
100%

Construction Progress

K2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

L2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

M2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

N2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

O2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

P2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Q2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

R2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

S2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

T2 Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

AC Library 100%
Acupressure Track 100%
Aerobics / Meditation Room 100%
Aggregate area of recreational Open Space 100%
Amphitheatre 100%
Badminton Court 100%
Banquet Hall 100%
Basketball Court 100%
Bus facility 100%
Children???s Play Area 100%
Club House 100%
Community Buildings 100%
Creche Room 100%
Cricket Pitch 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Gazebo 100%
Gymnasium 100%
Indoor Games 100%
Jacuzzi, Steam & Sauna 100%
Jogging Track 100%
Landscape Garden 100%
Landscaping & Tree Planting 100%
Mini Theater 100%
MultiCuisine Cafe 100%
Music Room 100%
Net Café 100%
Open Parking 100%
Painting Room 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Skating Ring 100%
Solar Power 100%
Solid Waste Management And Disposal 100%
Squash Court 100%
Storm Water Drains 100%
Street Lighting 100%
Swimming Pool 100%
Table Tennis 100%
Tennis Court 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.