NATRAJProject photos will appear here when available.
Project Information
RERA Certificate No.
PM1240002502507
Registration No.
PM1240002502507
Registration Date
2026-02-26
Developer
CANOPY INFRA Partnership
Proposed Possession
2028-12-31
Revised Possession
2028-12-31
Total Units
94
Units Sold
0 (0%)
Buildings
1
Project Area
4313.25 sq.m
NATRAJ MahaRERA โ PM1240002502507
Scan to verify on MahaRERA portal
Wing-wise Details
๐๏ธProposed Floors8
โ Sanctioned8
๐ Habitable7
๐ขTotal
Units28
๐กResidential28
๐๏ธProposed Floors8
โ Sanctioned8
๐ Habitable8
๐ขTotal
Units30
๐กResidential30
๐๏ธProposed Floors8
โ Sanctioned8
๐ Habitable8
๐ขTotal
Units36
๐กResidential29
๐ขNon-Residential7
Construction Progress
NATRAJ BUILDING - 1, WING A, B AND C - A-WING
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
NATRAJ BUILDING - 1, WING A, B AND C - B - Wing
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
NATRAJ BUILDING - 1, WING A, B AND C - C - Wing
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
โฌAggregate area of recreational Open Space
โฌCommunity Buildings
โ Electrical meter room, sub-station, receiving station
โฌEnergy managemcnt
โ Fire protection and fire safety requirements
โ Internal Roads & Footpaths
โ Landscaping & Tree Planting
โฌOpen Parking
โ Sewerage (Chamber, Lines, Septic Tank , STP)
โฌSolid Waste Management And Disposal
โ Storm Water Drains
โฌStreet Lighting
โฌTreatment And Disposal Of Sewage And Sullage Water