📞 +91 98200 30685 ✉️
RERA: A51800043517

NEW MODEL TOWN COMPLEX

by QAVI CONSTRUCTION PVT. LTD. Company
Certificate Signed P51700015557
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700015557
Registration No.
REA51700033356
Registration Date
2021-09-10
Developer
QAVI CONSTRUCTION PVT. LTD. Company
Architect
Archilogic Consultants
Project Bank
HDFC BANK
Proposed Possession
2023-01-16
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
5
Project Area
6310.80 sq.m
Total FSI
6813.06
Approved FSI
6813.06
MahaRERA QR
NEW MODEL TOWN COMPLEX
MahaRERA — P51700015557
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2022-01-16
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking7
📅Completion2022-01-16
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking6
📅Completion2022-01-16
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking8
📅Completion2022-01-16
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking4
📅Completion2022-01-16

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 40.11000061035156 0 0 0
0%
1 Bhk 40.25 0 0 0
0%
1 Bhk 41.15999984741211 0 0 0
0%
1 Bhk 41.400001525878906 0 0 0
0%
1 Bhk 42.27000045776367 0 0 0
0%
1Bhk 40.11000061035156 0 0 0
0%
1Bhk 40.25 0 0 0
0%
1Bhk 41.400001525878906 0 0 0
0%
1Bhk 42.900001525878906 0 0 0
0%
1Bhk 43.150001525878906 0 0 0
0%
1Bhk 43.529998779296875 0 0 0
0%
1Bhk 43.75 0 0 0
0%
1Bhk 43.93000030517578 0 0 0
0%
1Bhk 45.65999984741211 0 0 0
0%

A Type Unit 01

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.11 4 4 0
100%
1 BHK 40.25 16 15 1
94%
1 BHK 41.4 16 14 2
88%

A Type Unit 02

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.11 4 0 4
0%
1 BHK 40.25 16 0 16
0%
1 BHK 41.16 16 0 16
0%

B Type

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.11 4 4 0
100%
1 BHK 41.4 8 8 0
100%
1 BHK 43.93 4 4 0
100%
1 BHK 45.66 8 8 0
100%

C Type

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 42.9 4 4 0
100%
1 BHK 43.15 12 12 0
100%
1 BHK 43.53 4 4 0
100%
1 BHK 43.75 12 8 4
67%

D Type

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.11 8 0 8
0%
1 BHK 41.4 8 0 8
0%
1 BHK 42.27 8 0 8
0%

Construction Progress

A TYPE UNIT 01

Basement (if any)100%

A Type Unit 01

Excavation100%

A TYPE UNIT 01

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

A Type Unit 01

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

A TYPE UNIT 01

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

A Type Unit 01

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

A TYPE UNIT 01

Plinth100%
Podiums (if any) 0%

A Type Unit 01

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

A TYPE UNIT 01

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

A Type Unit 01

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

A TYPE UNIT 01

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A Type Unit 01

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

A TYPE UNIT 02

Basement (if any)100%

A Type Unit 02

Excavation100%

A TYPE UNIT 02

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

A Type Unit 02

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

A TYPE UNIT 02

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

A Type Unit 02

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

A TYPE UNIT 02

Plinth100%
Podiums (if any) 0%

A Type Unit 02

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

A TYPE UNIT 02

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

A Type Unit 02

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

A TYPE UNIT 02

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A Type Unit 02

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B TYPE

Basement (if any)100%

B Type

Excavation100%

B TYPE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

B Type

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

B TYPE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

B Type

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

B TYPE

Plinth100%
Podiums (if any) 0%

B Type

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

B TYPE

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

B Type

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

B TYPE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B Type

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C TYPE

Basement (if any)100%

C Type

Excavation100%

C TYPE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

C Type

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

C TYPE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

C Type

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

C TYPE

Plinth100%
Podiums (if any) 0%

C Type

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

C TYPE

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

C Type

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C TYPE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Type

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D TYPE

Basement (if any)0%

D Type

Excavation0%

D TYPE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D Type

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D TYPE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

D Type

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

D TYPE

Plinth0%
Podiums (if any) 0%

D Type

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D TYPE

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

D Type

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

D TYPE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

D Type

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.