PARSHVADHARA

by PARSHVANATH DEVELOPERS Partnership
Certificate Signed P51700010323
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700010323
Registration No.
REA51700017205
Registration Date
2017-08-24
Developer
PARSHVANATH DEVELOPERS Partnership
Architect
Raj Associates
Project Bank
AXIS BANK
Proposed Possession
2019-04-30
Revised Possession
2019-04-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
4
Project Area
3867.16 sq.m
Total FSI
5099.55
Approved FSI
5099.55
MahaRERA QR
PARSHVADHARA
MahaRERA — P51700010323
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01
🏗️Proposed Floors8
Sanctioned8
🅿️Closed Parking2
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 26.190000534057617 0 0 0
0%
1Bhk 26.700000762939453 0 0 0
0%
1Bhk 27.040000915527344 0 0 0
0%
1Bhk 27.110000610351562 0 0 0
0%
1Bhk 27.149999618530273 0 0 0
0%
1Bhk 28.309999465942383 0 0 0
0%
1Bhk 28.360000610351562 0 0 0
0%
1Bhk 28.40999984741211 0 0 0
0%
1Bhk 28.610000610351562 0 0 0
0%
1Bhk 29.18000030517578 0 0 0
0%
1Bhk 29.540000915527344 0 0 0
0%
1Bhk 31.5 0 0 0
0%
1Bhk 31.670000076293945 0 0 0
0%
1Bhk 31.690000534057617 0 0 0
0%
1Bhk 31.780000686645508 0 0 0
0%
1Bhk 31.850000381469727 0 0 0
0%
1Bhk 32.040000915527344 0 0 0
0%
1Bhk 32.4900016784668 0 0 0
0%
1Rk 20.860000610351562 0 0 0
0%
2Bhk 46.84000015258789 0 0 0
0%
2Bhk 47.810001373291016 0 0 0
0%
Shop 8.289999961853027 0 0 0
0%
Shop 9.680000305175781 0 0 0
0%
Shop 12.300000190734863 0 0 0
0%
Shop 13.90999984741211 0 0 0
0%

A-Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.7 4 1 3
25%
1 BHK 27.04 5 2 3
40%
1 BHK 28.31 5 2 3
40%
1 BHK 28.41 5 1 4
20%
1 BHK 29.18 4 2 2
50%
SHOP 8.29 1 1 0
100%
SHOP 9.68 1 1 0
100%
SHOP 12.3 1 0 1
0%
SHOP 13.91 1 0 1
0%

B-Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.61 8 7 1
88%
1 BHK 31.67 8 5 3
62%
1 BHK 31.69 8 7 1
88%
1 BHK 31.85 7 7 0
100%
1RK 20.86 1 1 0
100%

C-Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.36 7 6 1
86%
1 BHK 31.78 8 8 0
100%
1 BHK 32.04 8 7 1
88%
1 BHK 32.49 8 7 1
88%
2 BHK 46.84 8 5 3
62%
2 BHK 47.81 8 7 1
88%

D-Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.19 8 5 3
62%
1 BHK 27.11 7 4 3
57%
1 BHK 27.15 7 7 0
100%
1 BHK 29.54 7 4 3
57%
1 BHK 31.5 8 3 5
38%

Construction Progress

A-WING

Basement (if any)100%

A-Wing

Excavation100%

A-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%

A-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%

A-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises65%
Overall Percentage of Completion of the work done For the entire Building /Wing57%

A-WING

Plinth100%
Podiums (if any) 0%

A-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%

A-WING

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

A-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

A-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

A-Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B-WING

Basement (if any)100%

B-Wing

Excavation100%

B-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

B-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

B-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

B-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

B-WING

Plinth100%
Podiums (if any) 0%

B-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

B-WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

B-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

B-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B-Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C-WING

Basement (if any)100%

C-Wing

Excavation100%

C-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

C-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

C-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

C-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

C-WING

Plinth100%
Podiums (if any) 0%

C-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

C-WING

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

C-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C-Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D-WING

Basement (if any)100%

D-Wing

Excavation100%

D-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

D-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

D-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing52%

D-WING

Plinth100%
Podiums (if any) 0%

D-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D-WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

D-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%

D-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%

D-Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 60%
Energy management
Fire Protection And Fire Safety Requirements 30%
Landscaping & Tree Planting
Open Parking 50%
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal
Storm Water Drains 60%
Street Lighting 30%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.