📞 +91 98200 30685 ✉️
RERA: A51800043517

PENTAGON ENCLAVE

by DAMJI HARI INFRASTRUCTURE PVT LTD Company
Certificate Signed P51700010181
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700010181
Registration No.
REA51700015270
Registration Date
2017-08-24
Developer
DAMJI HARI INFRASTRUCTURE PVT LTD Company
Architect
Mr. Alim A.K. Fouzi
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2024-12-30
Units Sold
0
Buildings
3
Project Area
7816.00 sq.m
Total FSI
8268.40
Approved FSI
8268.40
MahaRERA QR
PENTAGON ENCLAVE
MahaRERA — P51700010181
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors3
Sanctioned3
⬇️Basements1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
📅Completion2019-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Rk 19.5 0 0 0
0%
1Bhk 26.200000762939453 0 0 0
0%
1Bhk 26.65999984741211 0 0 0
0%
1Bhk 26.850000381469727 0 0 0
0%
1Bhk 27.600000381469727 0 0 0
0%
1Bhk 27.799999237060547 0 0 0
0%
1Bhk 27.950000762939453 0 0 0
0%
1Rk 13.470000267028809 0 0 0
0%
1Rk 13.550000190734863 0 0 0
0%
1Rk 13.65999984741211 0 0 0
0%
1Rk 13.75 0 0 0
0%
1Rk 13.899999618530273 0 0 0
0%
1Rk 14.960000038146973 0 0 0
0%
1Rk 16.149999618530273 0 0 0
0%
1Rk 16.260000228881836 0 0 0
0%
1Rk 16.450000762939453 0 0 0
0%
1Rk 18.209999084472656 0 0 0
0%
1Rk 19.5 0 0 0
0%
2Bhk 31.540000915527344 0 0 0
0%
2Bhk 36.790000915527344 0 0 0
0%
2Bhk 39.400001525878906 0 0 0
0%
Commercial 188.5 0 0 0
0%
Commercial 210.1999969482422 0 0 0
0%
Commercial 223.89999389648438 0 0 0
0%
Commercial 250.9499969482422 0 0 0
0%
Commercial 270.6499938964844 0 0 0
0%

Commercial Complex - Type 1

Type Carpet (sq.ft) Total Booked Available Status
COMMERCIAL 188.5 3 0 3
0%
COMMERCIAL 210.2 1 0 1
0%
COMMERCIAL 223.9 1 0 1
0%
COMMERCIAL 250.95 1 0 1
0%
COMMERCIAL 270.65 2 0 2
0%

Penta 1 - Type 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.199 1 1 0
100%
1 BHK 26.663 1 1 0
100%
1 BHK 26.849 6 6 0
100%
1 BHK 27.6 13 7 6
54%
1 BHK 27.8 22 16 6
73%
1 BHK 27.95 6 3 3
50%
1 RK 19.5 6 5 1
83%
1RK 13.471 2 2 0
100%
1RK 13.55 5 3 2
60%
1RK 13.657 5 5 0
100%
1RK 13.75 16 9 7
56%
1RK 13.9 7 5 2
71%
1RK 14.957 2 2 0
100%
1RK 16.15 5 5 0
100%
1RK 16.258 3 3 0
100%
1RK 16.45 4 3 1
75%
1RK 18.209 1 1 0
100%
2 BHK 31.54 1 0 1
0%
2 BHK 36.79 1 1 0
100%
2 BHK 39.4 12 6 6
50%

Penta 2 - Type 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.85 5 5 0
100%
1 BHK 27.6 14 9 5
64%
1 BHK 27.8 23 14 9
61%
1 BHK 27.95 7 4 3
57%
1RK 13.55 7 3 4
43%
1RK 13.657 1 1 0
100%
1RK 13.75 20 12 8
60%
1RK 13.9 7 4 3
57%
1RK 14.957 3 3 0
100%
1RK 16.15 4 4 0
100%
1RK 16.45 7 4 3
57%
1RK 18.21 2 2 0
100%
1RK 19.5 5 4 1
80%
2 BHK 31.541 1 0 1
0%
2 BHK 36.79 1 1 0
100%
2 BHK 39.4 12 8 4
67%

Construction Progress

COMMERCIAL COMPLEX - TYPE 1

Basement (if any)100%

Commercial Complex - Type 1

Excavation100%

COMMERCIAL COMPLEX - TYPE 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Commercial Complex - Type 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

COMMERCIAL COMPLEX - TYPE 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Commercial Complex - Type 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing29%

COMMERCIAL COMPLEX - TYPE 1

Plinth100%
Podiums (if any) 0%

Commercial Complex - Type 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

COMMERCIAL COMPLEX - TYPE 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Commercial Complex - Type 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

COMMERCIAL COMPLEX - TYPE 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Commercial Complex - Type 1

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

PENTA 1 - TYPE 2

Basement (if any)100%

Penta 1 - Type 2

Excavation100%

PENTA 1 - TYPE 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%

Penta 1 - Type 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

PENTA 1 - TYPE 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Penta 1 - Type 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

PENTA 1 - TYPE 2

Plinth100%
Podiums (if any) 0%

Penta 1 - Type 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

PENTA 1 - TYPE 2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Penta 1 - Type 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PENTA 1 - TYPE 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Penta 1 - Type 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing91%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

PENTA 2 - TYPE 3

Basement (if any)100%

Penta 2 - Type 3

Excavation100%

PENTA 2 - TYPE 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Penta 2 - Type 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

PENTA 2 - TYPE 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Penta 2 - Type 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

PENTA 2 - TYPE 3

Plinth100%
Podiums (if any) 0%

Penta 2 - Type 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

PENTA 2 - TYPE 3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Penta 2 - Type 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%

PENTA 2 - TYPE 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%

Penta 2 - Type 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.