RERA: A51800043517

Raheja Solaris-2

by Raheja Universal (Pvt.) Ltd. Company
Certificate SignedP51700046184

Project Information

RERA Certificate No.
P51700046184
Registration No.
REA51700113946
Registration Date
2024-07-03
Developer
Raheja Universal (Pvt.) Ltd. Company
Architect
Kamal Khemani
Project Bank
HDFC BANK
Proposed Possession
2027-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
276
Units Sold
274 (99%)
Buildings
2
Project Area
1818.64 sq.m
Total FSI
23200.01
Approved FSI
22852.75
MahaRERA QR
Raheja Solaris-2
MahaRERA — P51700046184
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors30
Sanctioned30
🏠Habitable24
🔢Total Units133
🏡Residential133
🅿️Closed Parking187
📅Completion2027-12-31
🏗️Proposed Floors30
Sanctioned30
🏠Habitable24
🔢Total Units143
🏡Residential133
🏢Non-Residential10
🅿️Closed Parking197
📅Completion2027-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2Bhk59.13999938964844000
0%
2Bhk R61.27000045776367000
0%
3Bhk94.04000091552734000
0%
4Bhk Skyplex125.72000122070312000
0%
Shop 237.16999816894531000
0%
Shops 159.59000015258789000
0%

Raheja Solaris -2B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK59.14786810
87%
2 BHK R61.27110
100%
3 BHK94.04483711
77%
4 BHK Skyplex125.72660
100%

Raheja Solaris-2A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK59.14786711
86%
2 BHK R61.27110
100%
3 BHK94.0448453
94%
4 BHK Skyplex125.72660
100%
Shop 237.17330
100%
Shops 159.59770
100%

Construction Progress

Raheja Solaris -2B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 15%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure12%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.2%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks4%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums15%
X number of Slabs of Super Structure7%

Raheja Solaris-2A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 20%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure21%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks7%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums20%
X number of Slabs of Super Structure14%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.