Renaissance Industrial Smart City - Ph IiProject photos will appear here when available.
Project Information
RERA Certificate No.
P51700013956
Registration No.
REA51700025819
Registration Date
2021-09-09
Developer
Renaissance Indus Infra Private Limited Company
Architect
Faiyaz Thokan
Project Bank
HDFC BANK
Proposed Possession
2039-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
73
Project Area
1086622.90 sq.m
Total FSI
1086622.92
Approved FSI
526827.82
Renaissance Industrial Smart City - Ph Ii MahaRERA โ P51700013956
Scan to verify on MahaRERA portal
Wing-wise Details
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors2
โ Sanctioned2
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors3
โ Sanctioned3
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
๐๏ธProposed Floors1
โ Sanctioned1
Apartment Configurations
1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
116
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
118
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
119
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.3
1
0
1
0%
121
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.53
1
0
1
0%
123
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
40
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
41
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
42
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
48
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
49
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
50
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
51
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
52
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
86
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.3
1
0
1
0%
89
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.3
1
0
1
0%
91
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.3
1
0
1
0%
95
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.3
1
0
1
0%
96
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.3
1
0
1
0%
97
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
441.92
1
0
1
0%
98
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
421.32
1
0
1
0%
FB-1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-25
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-26
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-27
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-28
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-30
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-32
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-53
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-56
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-57
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-58
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
FB-59
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Factory Bldg
1350.23
1
0
1
0%
MN GB - 01
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
13.14
1
0
1
0%
Gala or Unit
15.88
8
0
8
0%
Gala or Unit
16.37
4
0
4
0%
Gala or Unit
19.32
6
0
6
0%
Gala or Unit
20.55
6
0
6
0%
Gala or Unit
36.49
1
0
1
0%
Gala or Unit
38.97
3
0
3
0%
Gala or Unit
39.39
3
0
3
0%
Gala or Unit
41.4
24
0
24
0%
Gala or Unit
41.46
1
0
1
0%
Gala or Unit
45.35
24
0
24
0%
Gala or Unit
87.22
72
0
72
0%
MN GB - 02
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
13.14
1
0
1
0%
Gala or Unit
15.88
3
0
3
0%
Gala or Unit
16.37
7
0
7
0%
Gala or Unit
36.49
1
0
1
0%
Gala or Unit
38.97
6
0
6
0%
Gala or Unit
41.41
16
0
16
0%
Gala or Unit
45.33
16
0
16
0%
Gala or Unit
62.57
4
0
4
0%
Gala or Unit
73.09
4
0
4
0%
Gala or Unit
87.22
48
0
48
0%
Gala or Unit
136.14
8
0
8
0%
Gala or Unit
136.29
4
0
4
0%
MN GB - 03
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
11
0
11
0%
Gala or Unit
22.18
8
0
8
0%
Gala or Unit
24.4
7
0
7
0%
Gala or Unit
36.85
36
0
36
0%
Gala or Unit
38.41
36
0
36
0%
Gala or Unit
38.53
3
0
3
0%
Gala or Unit
42.83
1
0
1
0%
Gala or Unit
44.69
3
0
3
0%
Gala or Unit
75.69
108
0
108
0%
Gala or Unit
95.53
4
0
4
0%
Gala or Unit
98.02
4
0
4
0%
Gala or Unit
194.03
8
0
8
0%
Gala or Unit
194.18
4
0
4
0%
MN GB - 04
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
13.14
1
0
1
0%
Gala or Unit
15.88
11
0
11
0%
Gala or Unit
16.37
1
0
1
0%
Gala or Unit
19.32
6
0
6
0%
Gala or Unit
20.55
6
0
6
0%
Gala or Unit
36.49
1
0
1
0%
Gala or Unit
38.97
6
0
6
0%
Gala or Unit
41.17
28
0
28
0%
Gala or Unit
41.46
1
0
1
0%
Gala or Unit
45.12
28
0
28
0%
Gala or Unit
87.22
84
0
84
0%
Gala or Unit
122.7
4
0
4
0%
Gala or Unit
133.29
4
0
4
0%
Gala or Unit
257.81
8
0
8
0%
Gala or Unit
257.96
4
0
4
0%
MN GB - 05
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.66
11
0
11
0%
Gala or Unit
22.18
8
0
8
0%
Gala or Unit
24.4
7
0
7
0%
Gala or Unit
36.85
36
0
36
0%
Gala or Unit
38.4
36
0
36
0%
Gala or Unit
38.53
3
0
3
0%
Gala or Unit
42.83
1
0
1
0%
Gala or Unit
44.69
3
0
3
0%
Gala or Unit
75.69
108
0
108
0%
Gala or Unit
117.76
4
0
4
0%
Gala or Unit
122.84
4
0
4
0%
Gala or Unit
241.09
8
0
8
0%
Gala or Unit
241.24
4
0
4
0%
MN GB - 09
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
3
0
3
0%
Gala or Unit
22.18
4
0
4
0%
Gala or Unit
24.4
3
0
3
0%
Gala or Unit
36.85
20
0
20
0%
Gala or Unit
38.41
20
0
20
0%
Gala or Unit
75.69
60
0
60
0%
Gala or Unit
95.53
4
0
4
0%
Gala or Unit
98.02
4
0
4
0%
Gala or Unit
194.03
8
0
8
0%
Gala or Unit
194.18
4
0
4
0%
MN GB - 10
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
13.14
1
0
1
0%
Gala or Unit
15.88
8
0
8
0%
Gala or Unit
16.37
4
0
4
0%
Gala or Unit
19.32
6
0
6
0%
Gala or Unit
20.55
6
0
6
0%
Gala or Unit
36.49
1
0
1
0%
Gala or Unit
38.97
3
0
3
0%
Gala or Unit
39.39
3
0
3
0%
Gala or Unit
41.4
28
0
28
0%
Gala or Unit
41.46
1
0
1
0%
Gala or Unit
45.35
28
0
28
0%
Gala or Unit
87.22
84
0
84
0%
Gala or Unit
101.32
4
0
4
0%
Gala or Unit
111.91
4
0
4
0%
Gala or Unit
213.73
8
0
8
0%
Gala or Unit
213.87
4
0
4
0%
MN GB - 11
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
11
0
11
0%
Gala or Unit
22.18
8
0
8
0%
Gala or Unit
24.4
7
0
7
0%
Gala or Unit
36.85
36
0
36
0%
Gala or Unit
38.41
36
0
36
0%
Gala or Unit
38.53
3
0
3
0%
Gala or Unit
42.83
1
0
1
0%
Gala or Unit
44.58
3
0
3
0%
Gala or Unit
75.69
108
0
108
0%
Gala or Unit
95.53
4
0
4
0%
Gala or Unit
98.02
4
0
4
0%
Gala or Unit
194.03
8
0
8
0%
Gala or Unit
194.18
4
0
4
0%
MN GB - 12
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
13.14
1
0
1
0%
Gala or Unit
15.88
8
0
8
0%
Gala or Unit
16.37
4
0
4
0%
Gala or Unit
19.32
6
0
6
0%
Gala or Unit
20.55
6
0
6
0%
Gala or Unit
36.49
1
0
1
0%
Gala or Unit
38.97
3
0
3
0%
Gala or Unit
39.39
3
0
3
0%
Gala or Unit
41.4
28
0
28
0%
Gala or Unit
41.46
1
0
1
0%
Gala or Unit
45.35
28
0
28
0%
Gala or Unit
87.22
84
0
84
0%
Gala or Unit
101.32
4
0
4
0%
Gala or Unit
111.91
4
0
4
0%
Gala or Unit
213.73
8
0
8
0%
Gala or Unit
213.87
4
0
4
0%
MN GB - 13
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
13.14
1
0
1
0%
Gala or Unit
15.88
8
0
8
0%
Gala or Unit
16.37
4
0
4
0%
Gala or Unit
19.32
6
0
6
0%
Gala or Unit
20.55
6
0
6
0%
Gala or Unit
36.49
1
0
1
0%
Gala or Unit
38.97
3
0
3
0%
Gala or Unit
39.39
3
0
3
0%
Gala or Unit
41.4
26
0
26
0%
Gala or Unit
41.46
1
0
1
0%
Gala or Unit
45.35
26
0
26
0%
Gala or Unit
87.22
78
0
78
0%
Gala or Unit
101.32
2
0
2
0%
Gala or Unit
111.91
2
0
2
0%
Gala or Unit
213.73
4
0
4
0%
Gala or Unit
213.87
2
0
2
0%
MN GB - 14
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
11
0
11
0%
Gala or Unit
22.18
8
0
8
0%
Gala or Unit
24.4
7
0
7
0%
Gala or Unit
36.85
30
0
30
0%
Gala or Unit
38.41
30
0
30
0%
Gala or Unit
38.53
3
0
3
0%
Gala or Unit
42.83
1
0
1
0%
Gala or Unit
44.69
3
0
3
0%
Gala or Unit
75.69
90
0
90
0%
Gala or Unit
95.53
2
0
2
0%
Gala or Unit
98.02
2
0
2
0%
Gala or Unit
194.03
4
0
4
0%
Gala or Unit
194.18
2
0
2
0%
MN GB - 15
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
13.14
1
0
1
0%
Gala or Unit
15.88
8
0
8
0%
Gala or Unit
16.37
4
0
4
0%
Gala or Unit
19.32
6
0
6
0%
Gala or Unit
20.55
6
0
6
0%
Gala or Unit
36.49
1
0
1
0%
Gala or Unit
38.97
3
0
3
0%
Gala or Unit
39.39
3
0
3
0%
Gala or Unit
41.4
26
0
26
0%
Gala or Unit
41.46
1
0
1
0%
Gala or Unit
45.35
26
0
26
0%
Gala or Unit
87.22
78
0
78
0%
Gala or Unit
101.32
2
0
2
0%
Gala or Unit
111.91
2
0
2
0%
Gala or Unit
213.73
4
0
4
0%
Gala or Unit
213.87
2
0
2
0%
MN GB - 16
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
11
0
11
0%
Gala or Unit
22.18
8
0
8
0%
Gala or Unit
24.4
7
0
7
0%
Gala or Unit
36.85
36
0
36
0%
Gala or Unit
38.53
3
0
3
0%
Gala or Unit
42.83
1
0
1
0%
Gala or Unit
44.69
3
0
3
0%
Gala or Unit
75.69
108
0
108
0%
Gala or Unit
95.53
4
0
4
0%
Gala or Unit
98.02
4
0
4
0%
Gala or Unit
194.03
8
0
8
0%
Gala or Unit
194.18
4
0
4
0%
Gala orUnit
38.41
36
0
36
0%
MN IFB - 01
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
16.37
3
0
3
0%
Gala or Unit
22.21
2
0
2
0%
Gala or Unit
27.47
2
0
2
0%
Gala or Unit
32.79
3
0
3
0%
Gala or Unit
39.06
1
0
1
0%
Gala or Unit
41.67
1
0
1
0%
Gala or Unit
47.93
2
0
2
0%
Gala or Unit
50.14
1
0
1
0%
Gala or Unit
260.75
24
0
24
0%
Gala or Unit
408.6
4
0
4
0%
Gala or Unit
487.0
4
0
4
0%
MN IFB - 02
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
8
0
8
0%
Gala or Unit
24.13
4
0
4
0%
Gala or Unit
24.4
5
0
5
0%
Gala or Unit
26.48
2
0
2
0%
Gala or Unit
35.25
2
0
2
0%
Gala or Unit
37.76
6
0
6
0%
Gala or Unit
54.4
1
0
1
0%
Gala or Unit
56.73
2
0
2
0%
Gala or Unit
226.13
40
0
40
0%
Gala or Unit
472.36
4
0
4
0%
MN IFB - 03
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
15.55
3
0
3
0%
Gala or Unit
22.22
2
0
2
0%
Gala or Unit
22.86
2
0
2
0%
Gala or Unit
27.6
2
0
2
0%
Gala or Unit
32.79
6
0
6
0%
Gala or Unit
41.67
5
0
5
0%
Gala or Unit
47.86
1
0
1
0%
Gala or Unit
50.39
2
0
2
0%
Gala or Unit
260.75
32
0
32
0%
Gala or Unit
488.71
4
0
4
0%
MN IFB - 04
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
8
0
8
0%
Gala or Unit
24.13
4
0
4
0%
Gala or Unit
24.4
5
0
5
0%
Gala or Unit
26.48
2
0
2
0%
Gala or Unit
37.76
6
0
6
0%
Gala or Unit
54.4
1
0
1
0%
Gala or Unit
56.73
2
0
2
0%
Gala or Unit
226.13
40
0
40
0%
Gala or Unit
472.36
4
0
4
0%
MN IFB - 05
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
15.55
3
0
3
0%
Gala or Unit
22.22
2
0
2
0%
Gala or Unit
22.86
2
0
2
0%
Gala or Unit
27.6
2
0
2
0%
Gala or Unit
32.79
6
0
6
0%
Gala or Unit
41.67
5
0
5
0%
Gala or Unit
47.86
1
0
1
0%
Gala or Unit
50.39
2
0
2
0%
Gala or Unit
260.75
32
0
32
0%
Gala or Unit
488.71
4
0
4
0%
MN IFB - 06
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
20.64
8
0
8
0%
Gala or Unit
24.13
4
0
4
0%
Gala or Unit
24.4
5
0
5
0%
Gala or Unit
26.48
2
0
2
0%
Gala or Unit
37.76
6
0
6
0%
Gala or Unit
54.4
1
0
1
0%
Gala or Unit
56.73
2
0
2
0%
Gala or Unit
226.13
40
0
40
0%
Gala or Unit
472.36
4
0
4
0%
MN IFB - 07
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
15.55
3
0
3
0%
Gala or Unit
22.22
2
0
2
0%
Gala or Unit
22.86
2
0
2
0%
Gala or Unit
27.6
2
0
2
0%
Gala or Unit
32.79
6
0
6
0%
Gala or Unit
41.67
1
0
1
0%
Gala or Unit
41.67
4
0
4
0%
Gala or Unit
47.86
1
0
1
0%
Gala or Unit
50.39
2
0
2
0%
Gala or Unit
260.75
24
0
24
0%
Gala or Unit
488.71
2
0
2
0%
MN IFB - 08
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
24.12
2
0
2
0%
Gala or Unit
37.77
3
0
3
0%
Gala or Unit
43.79
2
0
2
0%
Gala or Unit
226.13
8
0
8
0%
Gala or Unit
602.59
4
0
4
0%
P1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
9.8
7
0
7
0%
Gala or Unit
11.81
3
0
3
0%
Gala or Unit
36.75
4
0
4
0%
Gala or Unit
88.31
48
0
48
0%
Gala or Unit
187.82
8
0
8
0%
Gala or Unit
358.1
12
0
12
0%
Gala or Unit
375.92
4
0
4
0%
P2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
9.8
7
0
7
0%
Gala or Unit
11.81
3
0
3
0%
Gala or Unit
36.75
4
0
4
0%
Gala or Unit
88.31
48
0
48
0%
Gala or Unit
187.82
8
0
8
0%
Gala or Unit
358.1
12
0
12
0%
Gala or Unit
375.92
4
0
4
0%
P3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
9.8
7
0
7
0%
Gala or Unit
11.81
3
0
3
0%
Gala or Unit
36.75
4
0
4
0%
Gala or Unit
88.31
48
0
48
0%
Gala or Unit
187.82
8
0
8
0%
Gala or Unit
358.1
12
0
12
0%
Gala or Unit
375.92
4
0
4
0%
P4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Gala or Unit
756.66
3
0
3
0%
Gala or Unit
806.35
3
0
3
0%
Gala or Unit
1251.22
3
0
3
0%
WA-IX
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
5946.48
1
0
1
0%
WA-VIII
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
3772.2
1
0
1
0%
WA-X
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
8911.35
1
0
1
0%
WA-XI
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
8911.35
1
0
1
0%
WB-V
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
6209.08
1
0
1
0%
WD -II
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
16191.72
1
0
1
0%
WD-I
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
9381.2
1
0
1
0%
WD-III
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
9724.94
1
0
1
0%
WD-IV
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
9724.94
1
0
1
0%
WD-V
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
10805.03
1
0
1
0%
WE-I
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
48105.94
1
0
1
0%
WE-II
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Warehouse
39982.94
1
0
1
0%
Construction Progress
1
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
116
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
118
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
119
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
121
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
123
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
40
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
41
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
42
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
48
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
49
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
50
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
51
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
52
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
86
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
89
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
91
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
95
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
96
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
97
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
98
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-1
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-2
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-25
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-26
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-27
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-28
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-3
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-30
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-32
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-4
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-53
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-56
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-57
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-58
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
FB-59
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 01
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 02
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 03
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 04
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 05
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 09
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 10
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 11
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 12
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 13
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 14
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 15
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN GB - 16
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 01
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 02
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 03
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 04
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 05
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 06
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 07
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MN IFB - 08
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
P1
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
P2
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
P3
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
P4
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WA-IX
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WA-VIII
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WA-X
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WA-XI
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WB-V
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WD -II
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WD-I
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WD-III
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WD-IV
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WD-V
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WE-I
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WE-II
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
โฌAggregate area of recreational Open Space
โฌCommunity Buildings
โ Electrical meter room, sub-station, receiving station
โ Energy managemcnt
โ Fire protection and fire safety requirements
โ Internal Roads & Footpaths
โ Landscaping & Tree Planting
โ Open Parking
โ Sewerage (Chamber, Lines, Septic Tank , STP)
โ Solid Waste Management And Disposal
โ Storm Water Drains
โ Street Lighting
โ Treatment And Disposal Of Sewage And Sullage Water