List PropertyWhatsApp
Best DealsNew Projects๐Ÿ—บ๏ธ Projects MapBuy a FlatRent a FlatCommercialBuilders & DevelopersWhy UsRERA SearchLocalitiesTools & CalculatorsNRI HubNews+ List Your Property๐Ÿ’ฌ WhatsApp Us
Mumbai property advisory & dataOperating since 1995โœ“ MahaRERA A51800043517Source-labelled project dataWe reply in minutes on WhatsApp

Rtg Shiv Srishti

by Rtg Infrastructure And Realtors Limited
Certificate SignedP51700012322
Rtg Shiv SrishtiProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700012322
Registration No.
REA51700018503
Developer
Rtg Infrastructure And Realtors Limited
Project Bank
HDFC Bank
Proposed Possession
2028-12-30
Revised Possession
2028-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
5577.00 sq.m
Total FSI
11786.44
Approved FSI
2000.00
MahaRERA QR
Rtg Shiv Srishti
MahaRERA โ€” P51700012322
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors25
โœ…Sanctioned25
๐Ÿ—๏ธProposed Floors12
โœ…Sanctioned12

Apartment Configurations

Type A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
TO A SHOP 28.328.3110
100%
TP A GODOWN 394.37394.37110
100%
TP A GODOWN 519.14519.14110
100%
TP A GODOWN 595.69595.69110
100%
TP A M HALL 316.56316.56110
100%
TP A M HALL 568.56568.56110
100%
TP A M HALL 591.2591.2110
100%
TP A SHOP 20.7420.74110
100%
TP A SHOP 26.5326.53220
100%
TP A SHOP 27.6327.63202
0%
TP A SHOP 29.3729.37101
0%
TP A SHOP 30.0630.06220
100%
TP A SHOP 30.6530.65110
100%
TP A SHOP 32.4232.42220
100%
TP A SHOP 34.2234.22101
0%
TP A SHOP 34.3034.3110
100%
TP A SHOP 35.0235.02110
100%
TP A SHOP 40.4440.44110
100%
TP A SHOP 41.7741.77422
50%
TP A SHOP 43.1043.1202
0%
TP A SHOP 48.4048.4110
100%
TP A SHOP 49.7349.73220
100%
TP A SHOP 50.5250.52440
100%
TP A W A 1 BK 44.1444.1410100
100%
TP A W A 1 BK 44.3644.36440
100%
TP A W A 1 BK 44.5744.57440
100%
TP A W A 1 BK 46.4246.42110
100%
TP A W A 1 BK 47.1647.16110
100%
TP A W A 3 BK 73.4173.41110
100%
TP A W A 3 BK 74.8074.81082
80%
TP A W A 3 BK 75.4175.41440
100%
TP A W A 3 BK 75.8275.82431
75%
TP A W B 2 BK 53.1253.12220
100%
TP A W B 2 BK 53.9453.9418180
100%
TP A W B 2 BK 55.9755.97110
100%
TP A W B 2 BK 56.4756.47110
100%
TP A W B 2BK 54.1954.1918153
83%
TP A WA 3 BK 74.1574.15110
100%

Type D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
TP D GODOWN 189.74189.74101
0%
TP D GODOWN 202.90202.9110
100%
TP D OFF 101.83101.83101
0%
TP D OFF 44.1744.17101
0%
TP D OFF 44.1844.18101
0%
TP D OFF 45.6245.62110
100%
TP D OFF 46.3446.34110
100%
TP D OFF 96.1296.12110
100%
TP D SHOP 19.9219.92110
100%
TP D SHOP 23.1223.12101
0%
TP D SHOP 23.4323.43101
0%
TP D SHOP 23.6823.68110
100%
TP D SHOP 27.2927.29110
100%
TP D SHOP 27.4127.41110
100%
TP D SHOP 27.9027.9101
0%
TP D SHOP 32.1432.14101
0%
TP D SHOP 33.7333.73110
100%
TP D SHOP 33.9733.97101
0%
TP D SHOP 44.0744.07110
100%
TP D W C 1 BK 34.6434.64101
0%
TP D W C 1 BK 38.7938.79330
100%
TP D W C 1 BK 38.838.8431
75%
TP D W C 1 BK 39.0539.05101
0%
TP D W C 1 BK 39.3139.31844
50%
TP D W C 1 BK 39.3739.37431
75%
TP D W C 1 BK 40.9240.92734
43%
TP D W C 1 BK 45.9745.97211
50%
TP D W C 1 BK 46.0946.09321
67%
TP D W C 1 BK 46.6346.63101
0%
TP D W C 2 BK 57.4257.42321
67%
TP D W C 2 BK 57.4357.43110
100%
TP D W C 2 BK 57.5357.53321
67%
TP D W C 2 BK 58.5558.55101
0%

Construction Progress

Type A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor90%

Type D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor90%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station
โฌœEnergy managemcnt
โœ…Fire protection and fire safety requirements
โฌœInternal Roads & Footpaths
โœ…Landscaping & Tree Planting
โœ…Open Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โฌœSolid Waste Management And Disposal
โœ…Storm Water Drains
โฌœStreet Lighting
โฌœTreatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news โ†’
CallWhatsApp
๐Ÿ‘‹ Looking for the right project? Let me help you find it!
๐Ÿ—๏ธ
MPE Project Advisor
โ— Online now