📞 +91 98200 30685 ✉️
RERA: A51800043517

SAI KANISHK PHASE II

by Om Sai Infra & Om Sai Group
Kept in Abeyance P51700012436
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700012436
Registration No.
REA51700014996
Developer
Om Sai Infra & Om Sai Group
Architect
Sameer S Lotke &Amp; Associates
Project Bank
AXIS BANK
Proposed Possession
2016-02-29
Revised Possession
2019-03-31
Extended Possession
2025-06-30
Buildings
3
Project Area
1171.65 sq.m
Total FSI
13347.08
Approved FSI
4301.51
Litigations
⚠️ Yes
MahaRERA QR
SAI KANISHK PHASE II
MahaRERA — P51700012436
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking23
🅿️Closed Parking21
📅Completion2019-03-31
🚗Open Parking15
🅿️Closed Parking16
📅Completion2019-03-31
🚗Open Parking26
🅿️Closed Parking11
📅Completion2019-03-31

Apartment Configurations

B4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 61.32 26 22 4
85%
2 BHK 90.39 33 31 2
94%

B5

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 93.6 19 17 2
89%
One One and half BHK 81.12 14 14 0
100%

B6

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 64.57 34 24 10
71%
2 BHK 57.04 31 23 8
74%
Shop 18.77 1 0 1
0%
Shop 25.46 1 0 1
0%
Shop 26.38 1 0 1
0%
Shop 27.78 1 0 1
0%
Shop 27.87 1 0 1
0%
Shop 30.47 1 0 1
0%
Shop 32.14 1 0 1
0%
Shop 38.0 1 0 1
0%
Shop 45.43 1 0 1
0%
Shop 47.47 2 0 2
0%

Construction Progress

B4

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure83%

B5

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%
Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure95%

B6

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing42%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure80%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.