📞 +91 98200 30685 ✉️
RERA: A51800043517

Sai Prasad Plaza

by Sainath Shete
Kept in Abeyance P51700008112
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700008112
Registration No.
REA51700016588
Developer
Sainath Shete
Project Bank
THE FEDRAL BANK LTD
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2023-06-30
Buildings
3
Project Area
5780.00 sq.m
Total FSI
6880.44
Litigations
⚠️ Yes
MahaRERA QR
Sai Prasad Plaza
MahaRERA — P51700008112
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01

Apartment Configurations

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.75 2 0 2
0%
2 BHK 40.87 4 1 3
25%
2 BHK 41.02 1 1 0
100%
2 BHK 42.9 10 2 8
20%
2 BHK 47.12 2 0 2
0%
2 BHK 47.26 2 0 2
0%
2 BHK 47.34 1 1 0
100%
OFFICE 7.01 1 0 1
0%
OFFICE 9.44 2 1 1
50%
OFFICE 16.13 1 0 1
0%
OFFICE 25.32 1 0 1
0%
OFFICE 43.7 1 1 0
100%
OFFICE 48.56 1 1 0
100%
SHOP 5.44 4 4 0
100%
SHOP 5.6 1 0 1
0%
SHOP 6.36 1 1 0
100%
SHOP 6.91 2 2 0
100%
SHOP 7.19 1 1 0
100%
SHOP 7.28 2 0 2
0%
SHOP 8.58 2 2 0
100%
SHOP 9.61 1 0 1
0%
SHOP 12.01 1 1 0
100%
SHOP 12.6 1 0 1
0%
SHOP 12.77 1 0 1
0%

D Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.53 6 1 5
17%
1 BHK 32.59 6 2 4
33%
2 BHK 40.81 6 0 6
0%
2 BHK 41.4 6 0 6
0%
2 BHK 42.77 12 2 10
17%
COMMERCIAL 86.21 1 1 0
100%
OFFICE 7.01 1 0 1
0%
OFFICE 8.13 1 0 1
0%
OFFICE 8.16 1 0 1
0%
OFFICE 8.49 1 0 1
0%
OFFICE 9.44 2 0 2
0%
OFFICE 9.61 1 0 1
0%
OFFICE 13.83 1 0 1
0%
OFFICE 16.13 1 0 1
0%
OFFICE 18.35 1 0 1
0%
OFFICE 25.58 1 0 1
0%
OFFICE 32.47 1 0 1
0%
SHOP 5.44 2 0 2
0%
SHOP 6.72 1 1 0
100%
SHOP 7.04 2 2 0
100%
SHOP 7.28 2 0 2
0%
SHOP 7.3 1 0 1
0%
SHOP 7.94 1 0 1
0%
SHOP 9.01 2 2 0
100%
SHOP 9.16 1 1 0
100%
SHOP 9.83 1 0 1
0%
SHOP 10.98 2 0 2
0%
SHOP 15.02 1 0 1
0%
SHOP 15.3 1 0 1
0%
SHOP 17.41 1 0 1
0%
SHOP 23.86 1 0 1
0%
SHOP 31.46 1 0 1
0%

E Wing

Type Carpet (sq.ft) Total Booked Available Status
OFFICE 18.11 2 0 2
0%
OFFICE 22.91 1 0 1
0%
OFFICE 43.7 1 0 1
0%
SHOP 14.55 1 0 1
0%
SHOP 23.04 4 0 4
0%

Construction Progress

C Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing46%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing46%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

E Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing35%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.