Sai Sansar Residency

by Arun Patil
Kept in Abeyance P51700008197
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700008197
Registration No.
REA51700010407
Developer
Arun Patil
Architect
Kedar Vijay Kale
Project Bank
STATE BANK OF INDIA
Proposed Possession
2020-12-31
Revised Possession
2021-06-30
Extended Possession
2022-12-30
Buildings
2
Project Area
7210.00 sq.m
Total FSI
7676.22
MahaRERA QR
Sai Sansar Residency
MahaRERA — P51700008197
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking13
📅Completion2020-12-31
🅿️Closed Parking26
📅Completion2020-12-31

Apartment Configurations

Building No 4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.36 14 14 0
100%
2 BHK 50.78 7 7 0
100%
2 BHK 52.58 7 7 0
100%

Building No 6

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.88 21 20 1
95%
1 BHK 31.97 14 14 0
100%
1 BHK 32.41 14 13 1
93%
2 BHK 46.48 14 12 2
86%

Construction Progress

Building No 4

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 6

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 80%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 90%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 90%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting 90%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.