📞 +91 98200 30685 ✉️
RERA: A51800043517

SANGHVI PARSSSVA CITY

by SANGHVI PREMISES PRIVATE LIMITED
Kept in Abeyance P51700009886
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700009886
Registration No.
REA51700011755
Developer
SANGHVI PREMISES PRIVATE LIMITED
Project Bank
ICICI
Proposed Possession
2019-06-30
Revised Possession
2020-12-29
Extended Possession
2024-03-31
Buildings
2
Project Area
1007.83 sq.m
Total FSI
6835.34
MahaRERA QR
SANGHVI PARSSSVA CITY
MahaRERA — P51700009886
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements1
📅Completion2022-09-30
⬇️Basements1
📅Completion2022-09-30

Apartment Configurations

Building 13

Type Carpet (sq.ft) Total Booked Available Status
Basement 24.71 1 0 1
0%
Basement 29.55 1 0 1
0%
Basement 32.22 1 0 1
0%
Basement 36.79 1 0 1
0%
Basement 39.33 1 0 1
0%
Basement 43.82 1 0 1
0%
Basement 51.96 1 0 1
0%
Basement 52.71 1 0 1
0%
Basement 54.11 1 0 1
0%
Basement 55.24 1 0 1
0%
Basement 57.67 1 0 1
0%
Basement 58.05 1 0 1
0%
Residential 21.18 7 5 2
71%
Residential 30.18 14 11 3
79%
Residential 30.59 14 5 9
36%
Residential 39.66 7 0 7
0%
Residential 41.94 3 3 0
100%
Residential 42.0 4 4 0
100%
Residential 42.23 14 2 12
14%
Residential 43.81 10 1 9
10%
Residential 44.01 4 1 3
25%
Shop 13.01 1 0 1
0%
Shop 16.56 1 0 1
0%
Shop 18.84 1 1 0
100%
Shop 22.84 1 0 1
0%
Shop 24.59 1 0 1
0%
Shop 35.09 1 0 1
0%
Shop 48.69 1 0 1
0%
Shop 49.38 1 0 1
0%
Shop 49.81 1 1 0
100%
Shop 52.68 1 0 1
0%
Shop 60.3 1 0 1
0%
Shop 68.06 1 0 1
0%
Shop 73.02 1 0 1
0%

Building 14

Type Carpet (sq.ft) Total Booked Available Status
Basement 33.98 1 0 1
0%
Basement 40.36 1 0 1
0%
Basement 55.47 1 0 1
0%
Basement 57.09 1 0 1
0%
Basement 66.18 1 0 1
0%
Basement 69.28 1 0 1
0%
Residential 28.72 7 5 2
71%
Residential 29.72 7 6 1
86%
Residential 30.42 1 0 1
0%
Residential 31.43 8 2 6
25%
Residential 33.04 7 5 2
71%
Residential 43.3 14 5 9
36%
Residential 44.05 7 4 3
57%
Shop 16.28 1 0 1
0%
Shop 18.61 1 0 1
0%
Shop 20.18 1 0 1
0%
Shop 27.14 1 0 1
0%
Shop 30.01 1 0 1
0%
Shop 42.46 1 0 1
0%
Shop 78.13 1 0 1
0%

Construction Progress

Building 13

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing22%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure20%

Building 14

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing22%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure20%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.