Project Information

RERA Certificate No.
P51700007690
Registration No.
REA51700018388
Registration Date
2021-09-10
Developer
THALIA INVESTMENT PRIVATE LIMITED Company
Architect
Nirmaan
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2025-07-31
Revised Possession
2025-07-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
19
Project Area
39545.02 sq.m
Total FSI
26858.28
Approved FSI
26858.28
MahaRERA QR
SARVODAY NAGAR SECTOR 1
MahaRERA — P51700007690
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking6
📅Completion2021-03-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-03-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-03-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-03-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-03-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-03-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2021-12-31
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking1
📅Completion2021-12-03
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking1
📅Completion2021-12-03
🏗️Proposed Floors1
Sanctioned1
🚗Open Parking1
📅Completion2021-12-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 35.27000045776367 0 0 0
0%
1.5 Bhk 41.369998931884766 0 0 0
0%
1.5 Bhk 44.2400016784668 0 0 0
0%
1Bhk 32.959999084472656 0 0 0
0%
1Bhk 34.150001525878906 0 0 0
0%
1Bhk 34.540000915527344 0 0 0
0%
1Bhk 34.970001220703125 0 0 0
0%
1Bhk 35.27000045776367 0 0 0
0%
1Bhk 35.93000030517578 0 0 0
0%
2 Bhk 46.34000015258789 0 0 0
0%
2 Bhk 47.0 0 0 0
0%
2 Bhk 49.61000061035156 0 0 0
0%
2Bhk 46.34000015258789 0 0 0
0%
2Bhk 46.56999969482422 0 0 0
0%
2Bhk 47.0 0 0 0
0%
2Bhk 48.95000076293945 0 0 0
0%
2Bhk 49.61000061035156 0 0 0
0%
Row House 59.060001373291016 0 0 0
0%
Row House 59.08000183105469 0 0 0
0%
Row House 85.26000213623047 0 0 0
0%
Shop 8.920000076293945 0 0 0
0%
Shop 11.979999542236328 0 0 0
0%
Shop 12.729999542236328 0 0 0
0%
Shop 14.119999885559082 0 0 0
0%

Building No 17 Kunthu A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.54 7 7 0
100%
1.5 BHK 41.37 7 6 1
86%
2 BHK 46.34 7 6 1
86%
2 BHK 47.0 7 6 1
86%
SHOP 8.92 3 3 0
100%
Shop 11.98 6 6 0
100%
SHOP 12.73 6 5 1
83%

Building No 17 Kunthu B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.54 14 14 0
100%
1 BHK 35.27 7 7 0
100%
1.5 BHK 41.37 7 7 0
100%

Building No 17 Kunthu C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.54 7 7 0
100%
1.5 BHK 41.37 7 7 0
100%
2 BHK 48.95 7 7 0
100%
2 BHK 49.61 7 7 0
100%

Building No 18 Arnath A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.54 7 7 0
100%
1.5 BHK 41.37 7 7 0
100%
2 BHK 48.95 7 7 0
100%
2 BHK 49.61 7 7 0
100%
Shop 8.92 3 3 0
100%
Shop 11.98 6 6 0
100%
Shop 12.73 6 6 0
100%
Shop 14.12 6 6 0
100%

Building No 18 Arnath B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.54 14 14 0
100%
1 BHK 35.27 7 7 0
100%
1.5 BHK 41.37 7 7 0
100%

Building No 18 Arnath C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.54 7 7 0
100%
1.5 BHK 41.37 7 7 0
100%
2 BHK 46.34 7 7 0
100%
2 BHK 47.0 7 7 0
100%

Building No 19 Mallinath A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.96 14 14 0
100%
1 BHK 35.93 7 7 0
100%
1.5 BHK 44.24 7 7 0
100%

Building No 19 Mallinath B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.96 14 14 0
100%
1 BHK 35.93 7 7 0
100%
1.5 BHK 44.24 7 7 0
100%

Building No 20 Munisuvrat A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.15 14 14 0
100%
1 BHK 34.97 14 14 0
100%
2 BHK 46.57 14 14 0
100%

Building No 20 Munisuvrat B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.15 14 14 0
100%
1 BHK 34.97 14 14 0
100%
2 BHK 46.57 14 14 0
100%

Building No 21 Naminath A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.96 14 14 0
100%
1 BHK 35.93 7 7 0
100%
1.5 BHK 44.24 7 7 0
100%

Building No 21 Naminath B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.96 14 14 0
100%
1 BHK 35.93 7 7 0
100%
1.5 BHK 44.24 7 7 0
100%

Building No 22 Neminath A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.96 14 14 0
100%
1 BHK 35.93 7 7 0
100%
1.5 BHK 44.24 7 7 0
100%

Building No 22 Neminath B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.96 14 14 0
100%
1 BHK 35.93 7 7 0
100%
1.5 BHK 44.24 7 7 0
100%

Building No 23 Parshwanath A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.15 14 14 0
100%
1 BHK 34.97 14 14 0
100%
2 BHK 46.57 14 14 0
100%

Building No 23 Parshwanath B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.15 14 14 0
100%
1 BHK 34.97 14 14 0
100%
2 BHK 46.57 14 14 0
100%

R H 15

Type Carpet (sq.ft) Total Booked Available Status
ROW HOUSE 59.08 1 1 0
100%

R H 8

Type Carpet (sq.ft) Total Booked Available Status
ROW HOUSE 59.06 1 1 0
100%

R H 9

Type Carpet (sq.ft) Total Booked Available Status
ROW HOUSE 85.26 1 1 0
100%

Construction Progress

BUILDING NO 17 KUNTHU A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 17 KUNTHU B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 17 KUNTHU C WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 18 ARNATH A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 18 ARNATH B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 18 ARNATH C WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 19 MALLINATH A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Stilt Floor 100%

BUILDING NO 19 MALLINATH B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Stilt Floor 100%

BUILDING NO 20 MUNISUVRAT A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Stilt Floor 100%

BUILDING NO 20 MUNISUVRAT B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Stilt Floor 100%

BUILDING NO 21 NAMINATH A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Stilt Floor 100%

BUILDING NO 21 NAMINATH B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Stilt Floor 100%

BUILDING NO 22 NEMINATH A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 22 NEMINATH B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 23 PARSHWANATH A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

BUILDING NO 23 PARSHWANATH B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

R H 15

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

R H 8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

R H 9

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 90%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 90%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.