📞 +91 98200 30685 ✉️
RERA: A51800043517

SATIS CHS

by PACIFIC IMPRESSION Partnership
Certificate Signed P51700010705
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700010705
Registration No.
REA51700019808
Registration Date
2020-06-17
Developer
PACIFIC IMPRESSION Partnership
Architect
Ankur Shetye
Project Bank
IDBI BANK
Proposed Possession
2021-01-31
Revised Possession
2021-01-31
Extended Possession
2023-03-31
Units Sold
0
Buildings
1
Project Area
2299.00 sq.m
Total FSI
2728.16
MahaRERA QR
SATIS CHS
MahaRERA — P51700010705
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
Sanctioned16
🚗Open Parking24
🅿️Closed Parking28
📅Completion2021-01-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Residential 55.560001373291016 0 0 0
0%
Residential 55.63999938964844 0 0 0
0%
Residential 56.81999969482422 0 0 0
0%
Residential 56.880001068115234 0 0 0
0%
Residential 60.34000015258789 0 0 0
0%
Residential 60.4900016784668 0 0 0
0%
Residential 77.36000061035156 0 0 0
0%
Residential 77.5 0 0 0
0%

Flora

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 55.56 6 4 2
67%
RESIDENTIAL 55.64 6 6 0
100%
RESIDENTIAL 56.82 7 4 3
57%
RESIDENTIAL 56.88 4 2 2
50%
RESIDENTIAL 60.34 5 2 3
40%
RESIDENTIAL 60.49 5 2 3
40%
RESIDENTIAL 77.36 6 3 3
50%
RESIDENTIAL 77.5 6 5 1
83%

Construction Progress

Flora

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%
Sanitary Fittings within the flats / premises70%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 20%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.