📞 +91 98200 30685 ✉️
RERA: A51800043517

Seven Eleven Residency

by Seven Eleven Construction Private Limited Company
Certificate Signed P51700011597
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700011597
Registration No.
REA51700016219
Registration Date
2017-08-31
Developer
Seven Eleven Construction Private Limited Company
Architect
Bac Planners & Engineers Private Limited
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
4580.00 sq.m
Total FSI
13700.78
Approved FSI
6851.71
MahaRERA QR
Seven Eleven Residency
MahaRERA — P51700011597
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🚗Open Parking29
🅿️Closed Parking36
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🚗Open Parking2
🅿️Closed Parking6
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 190.27999877929688 0 0 0
0%
1 Bhk 193.24000549316406 0 0 0
0%
1 Bhk 309.5400085449219 0 0 0
0%
1 Bhk 332.989990234375 0 0 0
0%
1 Bhk 460.79998779296875 0 0 0
0%
1 Bhk 482.3500061035156 0 0 0
0%
1 Bhk 1625.75 0 0 0
0%
2 Bhk 270.5199890136719 0 0 0
0%
2 Bhk 437.010009765625 0 0 0
0%
2 Bhk 457.79998779296875 0 0 0
0%
2 Bhk 486.42999267578125 0 0 0
0%
2 Bhk 2809.3798828125 0 0 0
0%
Shop 7.800000190734863 0 0 0
0%
Shop 8.550000190734863 0 0 0
0%
Shop 14.489999771118164 0 0 0
0%
Shop 14.859999656677246 0 0 0
0%
Shop 17.09000015258789 0 0 0
0%
Shop 17.469999313354492 0 0 0
0%
Shop 19.700000762939453 0 0 0
0%
Shop 21.920000076293945 0 0 0
0%
Shop 22.299999237060547 0 0 0
0%
Shop 31.219999313354492 0 0 0
0%
Shop 31.59000015258789 0 0 0
0%
Shops 32.70000076293945 0 0 0
0%
Shops 36.41999816894531 0 0 0
0%
Shops 37.900001525878906 0 0 0
0%
Shops 43.11000061035156 0 0 0
0%

Seven Eleven Residency A,B,C,D Wings

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 309.54 7 7 0
100%
1 BHK 332.99 7 7 0
100%
1 BHK 460.8 10 10 0
100%
1 BHK 482.35 11 11 0
100%
1 BHK 1625.75 35 35 0
100%
2 BHK 437.01 7 7 0
100%
2 BHK 457.8 7 7 0
100%
2 BHK 486.43 7 7 0
100%
2 BHk 2809.38 42 39 3
93%
Shop 7.8 1 1 0
100%
Shop 8.55 1 1 0
100%
Shop 14.49 1 1 0
100%
Shop 14.86 1 1 0
100%
Shop 17.09 1 1 0
100%
Shop 17.47 1 1 0
100%
Shop 19.7 1 1 0
100%
Shop 21.92 1 1 0
100%
Shop 22.3 1 1 0
100%
Shop 31.22 2 2 0
100%
Shop 31.59 1 1 0
100%
Shops 32.7 2 2 0
100%
Shops 36.42 2 2 0
100%
Shops 37.9 2 2 0
100%
Shops 43.11 2 2 0
100%

Seven Eleven Residency E Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 190.28 4 3 1
75%
1 BHK 193.24 4 3 1
75%
2 BHK 270.52 4 2 2
50%

Construction Progress

Seven Eleven Residency A,B,C,D Wings

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Seven Eleven Residency E Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.