📞 +91 98200 30685 ✉️
RERA: A51800043517

SHREE GAJANAN FORTUNE CITY

by ARUN BALU PATIL Individual
Certificate Signed P51700013810
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700013810
Registration No.
REA51700024898
Registration Date
2022-03-14
Developer
ARUN BALU PATIL Individual
Architect
Sachin Dilip Gulve
Proposed Possession
2024-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
8
Project Area
17000.00 sq.m
Total FSI
23421.77
Approved FSI
23421.77
MahaRERA QR
SHREE GAJANAN FORTUNE CITY
MahaRERA — P51700013810
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
🚗Open Parking140
📅Completion2023-12-31
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking140
📅Completion2023-03-31
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking140
📅Completion2023-03-31
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking140
📅Completion2023-12-31
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking140
📅Completion2023-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2023-03-31
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking140
📅Completion2023-03-31
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking137
📅Completion2023-03-31

Apartment Configurations

Building A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK FLAT 33.79 8 6 2
75%
1 BHK FLAT 34.8 4 3 1
75%
2 BHK FLAT 47.35 18 12 6
67%
SHOP 10.0 10 4 6
40%

Building B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK FLAT 30.98 3 1 2
33%
1 BHK FLAT 33.54 20 9 11
45%
1 BHK FLAT 33.62 16 14 2
88%
1 BHK FLAT 33.71 20 15 5
75%

Building C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK FLAT 30.98 3 3 0
100%
1 BHK FLAT 33.54 20 10 10
50%
1 BHK FLAT 33.62 16 13 3
81%
1 BHK FLAT 33.71 20 11 9
55%

Building D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 37.64 7 0 7
0%
1 BHK FLAT 35.21 28 0 28
0%
1 BHK FLAT 37.62 7 0 7
0%
1 BHK FLAT 52.97 14 0 14
0%

Building E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.61 28 0 28
0%
1 BHK 53.69 28 0 28
0%
Shop 9.03 2 1 1
50%
Shop 11.85 2 0 2
0%
Shop 13.77 2 0 2
0%
Shop 14.36 2 0 2
0%
Shop 19.8 2 0 2
0%

Building E1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.61 28 12 16
43%
1 BHK 53.39 28 5 23
18%
Shop 9.03 2 1 1
50%
Shop 11.85 2 1 1
50%
Shop 13.77 2 2 0
100%
Shop 14.36 2 0 2
0%
Shop 19.8 2 0 2
0%

Building F

Type Carpet (sq.ft) Total Booked Available Status
1 BHK FLAT 31.05 45 19 26
42%
1 BHK FLAT 31.9 14 6 8
43%
1 BHK FLAT 33.2 5 5 0
100%

Building G

Type Carpet (sq.ft) Total Booked Available Status
1 BHK FLAT 33.79 12 11 1
92%
1 BHK FLAT 34.8 17 11 6
65%
2 BHK FLAT 47.35 24 18 6
75%

Construction Progress

BUILDING A

Basement (if any)100%

Building A

Excavation100%

BUILDING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING A

Plinth100%
Podiums (if any) 0%

Building A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING B

Basement (if any)100%

Building B

Excavation100%

BUILDING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING B

Plinth100%
Podiums (if any) 0%

Building B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING C

Basement (if any)100%

Building C

Excavation100%

BUILDING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING C

Plinth100%
Podiums (if any) 0%

Building C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING D

Basement (if any)0%

Building D

Excavation0%

BUILDING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

BUILDING D

Plinth0%
Podiums (if any) 0%

Building D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING D

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Building D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building D

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

BUILDING E

Basement (if any)100%

Building E

Excavation100%

BUILDING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

BUILDING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

Building E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%
Overall Percentage of Completion of the work done For the entire Building /Wing45%

BUILDING E

Plinth100%
Podiums (if any) 0%

Building E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%

BUILDING E

Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%

Building E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

BUILDING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%

Building E

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING E1

Basement (if any)100%

Building E1

Excavation100%

BUILDING E1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building E1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80%

BUILDING E1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building E1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing83%

BUILDING E1

Plinth100%
Podiums (if any) 0%

Building E1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING E1

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building E1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

BUILDING E1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building E1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING F

Basement (if any)100%

Building F

Excavation100%

BUILDING F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING F

Plinth100%
Podiums (if any) 0%

Building F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING G

Basement (if any)100%

Building G

Excavation100%

BUILDING G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Building G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

BUILDING G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

BUILDING G

Plinth100%
Podiums (if any) 0%

Building G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

BUILDING G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Building G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building G

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 20%
Community Buildings 70%
Electrical Meter Room, Sub-Station, Receiving Station 20%
Energy management 5%
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 50%
Open Parking 20%
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains 5%
Street Lighting 40%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 25%
Water Supply 40%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.