Project Information

RERA Certificate No.
P51700013375
Registration No.
REA51700023735
Registration Date
2021-09-09
Developer
VARDHAMAN AND VASTU ASSOCIATES Partnership
Architect
Architect Inc
Project Bank
HDFC BANK
Proposed Possession
2021-12-20
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
7
Project Area
5700.00 sq.m
Total FSI
5725.98
MahaRERA QR
SHUBH NISARG
MahaRERA — P51700013375
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking8
📅Completion2020-12-20
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking8
📅Completion2020-12-20
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking6
📅Completion2020-12-20
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking1
📅Completion2020-12-20
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking1
📅Completion2020-12-20
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking1
📅Completion2020-12-20
🏗️Proposed Floors5
Sanctioned5
🅿️Closed Parking1
📅Completion2020-12-20

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 21.719999313354492 0 0 0
0%
1 Bhk 23.979999542236328 0 0 0
0%
1 Bhk 25.31999969482422 0 0 0
0%
1 Bhk 25.350000381469727 0 0 0
0%
1 Bhk 25.389999389648438 0 0 0
0%
1 Bhk 26.010000228881836 0 0 0
0%
1 Bhk 26.079999923706055 0 0 0
0%
1 Bhk 26.8799991607666 0 0 0
0%
1 Bhk 27.1299991607666 0 0 0
0%
1 Bhk 27.450000762939453 0 0 0
0%
1 Bhk 27.489999771118164 0 0 0
0%
1 Bhk 27.600000381469727 0 0 0
0%
1 Bhk 27.729999542236328 0 0 0
0%
1 Bhk 27.75 0 0 0
0%
1 Bhk 27.799999237060547 0 0 0
0%
1 Bhk 27.8700008392334 0 0 0
0%
1 Bhk 28.030000686645508 0 0 0
0%
1 Bhk 28.049999237060547 0 0 0
0%
1 Bhk 28.1299991607666 0 0 0
0%
1 Bhk 28.170000076293945 0 0 0
0%
1 Bhk 28.440000534057617 0 0 0
0%
1 Bhk 28.81999969482422 0 0 0
0%
1 Bhk 29.31999969482422 0 0 0
0%
1 Bhk 29.739999771118164 0 0 0
0%
1 Bhk 29.860000610351562 0 0 0
0%
1 Bhk 31.209999084472656 0 0 0
0%
1 Bhk 31.489999771118164 0 0 0
0%
1 Rk 17.540000915527344 0 0 0
0%
2 Bhk 31.549999237060547 0 0 0
0%
2 Bhk 34.9900016784668 0 0 0
0%
2 Bhk 36.06999969482422 0 0 0
0%
2 Bhk 36.52000045776367 0 0 0
0%
2 Bhk 36.81999969482422 0 0 0
0%
2 Bhk 37.33000183105469 0 0 0
0%
2 Bhk 37.529998779296875 0 0 0
0%
2 Bhk 37.970001220703125 0 0 0
0%
2 Bhk 38.130001068115234 0 0 0
0%
2 Bhk 39.900001525878906 0 0 0
0%
2 Bhk 44.439998626708984 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.32 7 7 0
100%
2 BHK 38.13 7 7 0
100%
2 BHK 44.44 14 14 0
100%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.74 7 7 0
100%
1 BHK 29.86 7 7 0
100%
1 BHK 31.21 7 7 0
100%
1 BHK 31.49 7 7 0
100%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.35 4 4 0
100%
1 BHK 26.88 8 8 0
100%
1 BHK 27.73 4 4 0
100%

D Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 23.98 4 4 0
100%
1 BHK 27.45 4 4 0
100%
1 BHK 27.75 1 1 0
100%
1 BHK 27.8 4 4 0
100%
1 BHK 28.03 4 4 0
100%
1 RK 17.54 1 1 0
100%

E Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 21.72 1 1 0
100%
1 BHK 27.13 1 1 0
100%
1 BHK 28.13 4 4 0
100%
2 BHK 34.99 4 4 0
100%
2 BHK 36.07 2 2 0
100%
2 BHK 36.52 1 1 0
100%
2 BHK 37.33 8 8 0
100%
2 BHK 37.53 8 8 0
100%

F Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.32 1 1 0
100%
1 BHK 25.39 1 1 0
100%
1 BHK 26.01 4 4 0
100%
1 BHK 26.08 4 4 0
100%
1 BHK 27.6 1 1 0
100%
1 BHK 27.87 4 4 0
100%
1 BHK 28.44 4 4 0
100%
1 BHK 28.82 1 1 0
100%
2 BHK 36.82 4 4 0
100%
2 BHK 37.97 1 1 0
100%
2 BHK 39.9 4 4 0
100%

G Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.49 3 3 0
100%
1 BHK 28.05 8 8 0
100%
1 BHK 28.17 4 4 0
100%
2 BHK 31.55 4 4 0
100%

Construction Progress

A WING

Basement (if any)0%

A Wing

Excavation0%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

A WING

Plinth0%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

B WING

Basement (if any)0%

B Wing

Excavation0%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

B WING

Plinth0%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

C WING

Basement (if any)0%

C Wing

Excavation0%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

C WING

Plinth0%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

C Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

D WING

Basement (if any)0%

D Wing

Excavation0%

D WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

D Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

D WING

Plinth0%
Podiums (if any) 0%

D Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

D Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

D WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

D Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

E WING

Basement (if any)100%

E Wing

Excavation100%

E WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

E Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

E WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

E Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing30%

E WING

Plinth100%
Podiums (if any) 0%

E Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

E WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

E Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

E WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

E Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

F WING

Basement (if any)100%

F Wing

Excavation100%

F WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

F Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

F WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

F Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing30%

F WING

Plinth100%
Podiums (if any) 0%

F Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

F WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

F Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

F WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

F Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

G WING

Basement (if any)100%

G Wing

Excavation100%

G WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

G Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

G WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

G Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing30%

G WING

Plinth100%
Podiums (if any) 0%

G Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

G WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

G Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

G WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

G Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.