📞 +91 98200 30685 ✉️
RERA: A51800043517

REDEVELOPMENT OF SILVERENE CHSL

by PRANAV CONSTRUCTIONS LIMITED Company
Certificate Signed P51800031840
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800031840
Registration No.
REA51800096934
Registration Date
2021-11-22
Developer
PRANAV CONSTRUCTIONS LIMITED Company
Architect
Rasik P Hingoo And Associates
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2024-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
565.70 sq.m
Total FSI
1626.60
Approved FSI
1301.28
MahaRERA QR
REDEVELOPMENT OF SILVERENE CHSL
MahaRERA — P51800031840
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
Sanctioned12
🚗Open Parking3
🅿️Closed Parking10
📅Completion2024-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 40.099998474121094 0 0 0
0%
2Bhk 49.849998474121094 0 0 0
0%
2Bhk 58.599998474121094 0 0 0
0%

Silverene Chsl

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.1 10 0 10
0%
2 BHK 49.85 10 0 10
0%
2 BHK 58.6 10 0 10
0%

Construction Progress

SILVERENE CHSL

Basement (if any)100%

Silverene Chsl

Excavation100%

SILVERENE CHSL

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Silverene Chsl

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SILVERENE CHSL

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Silverene Chsl

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

SILVERENE CHSL

Plinth100%
Podiums (if any) 0%

Silverene Chsl

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SILVERENE CHSL

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Silverene Chsl

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SILVERENE CHSL

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Silverene Chsl

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.