SONU AAI COMPLEX

by ARVIND GOPAL PATIL AOP Others
Certificate Signed P51700012035
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700012035
Registration No.
REA51700016731
Registration Date
2021-09-09
Developer
ARVIND GOPAL PATIL AOP Others
Architect
Jitesh P Pawar
Project Bank
G P PARSIK BANK
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
1970.00 sq.m
Total FSI
2118.57
Approved FSI
2118.57
MahaRERA QR
SONU AAI COMPLEX
MahaRERA — P51700012035
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
📅Completion2021-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2021-12-31
🏗️Proposed Floors9
Sanctioned9
📅Completion2021-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 29.34000015258789 0 0 0
0%
1Bhk 29.399999618530273 0 0 0
0%
1Bhk 41.4900016784668 0 0 0
0%
1Rk 44.41999816894531 0 0 0
0%
2Bhk 44.189998626708984 0 0 0
0%
2Bhk 44.20000076293945 0 0 0
0%
2Bhk 44.2400016784668 0 0 0
0%
2Bhk 50.15999984741211 0 0 0
0%
2Bhk 66.72000122070312 0 0 0
0%
3 Bhk 86.91999816894531 0 0 0
0%
Office 12.760000228881836 0 0 0
0%
Office 13.149999618530273 0 0 0
0%
Office 13.609999656677246 0 0 0
0%
Office 14.579999923706055 0 0 0
0%
Office 14.59000015258789 0 0 0
0%
Office 16.399999618530273 0 0 0
0%
Office 16.40999984741211 0 0 0
0%
Office 17.31999969482422 0 0 0
0%
Shop 11.289999961853027 0 0 0
0%
Shop 15.949999809265137 0 0 0
0%
Shop 15.989999771118164 0 0 0
0%
Shop 16.399999618530273 0 0 0
0%
Shop 18.229999542236328 0 0 0
0%

Gopal Niwas

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 66.72 4 0 4
0%

Parvati Niwas

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 41.49 1 0 1
0%
1RK 44.42 1 0 1
0%
3 BHK 86.92 3 0 3
0%

Sonu Aai Arcade

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.34 6 2 4
33%
1 BHK 29.4 1 0 1
0%
2 BHK 44.19 6 2 4
33%
2 BHK 44.2 6 4 2
67%
2 BHK 44.24 1 1 0
100%
2 BHK 50.16 6 1 5
17%
OFFICE 12.76 1 0 1
0%
OFFICE 13.15 2 0 2
0%
OFFICE 13.61 2 0 2
0%
OFFICE 14.58 1 0 1
0%
OFFICE 14.59 1 0 1
0%
OFFICE 16.4 1 1 0
100%
OFFICE 16.41 1 0 1
0%
OFFICE 17.32 1 0 1
0%
SHOP 11.29 1 0 1
0%
SHOP 15.95 3 1 2
33%
SHOP 15.99 1 1 0
100%
SHOP 16.4 1 0 1
0%
SHOP 18.23 3 0 3
0%

Construction Progress

GOPAL NIWAS

Basement (if any)100%

Gopal Niwas

Excavation100%

GOPAL NIWAS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Gopal Niwas

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

GOPAL NIWAS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Gopal Niwas

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Overall Percentage of Completion of the work done For the entire Building /Wing77%

GOPAL NIWAS

Plinth100%
Podiums (if any) 0%

Gopal Niwas

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

GOPAL NIWAS

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Gopal Niwas

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

GOPAL NIWAS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Gopal Niwas

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

PARVATI NIWAS

Basement (if any)100%

Parvati Niwas

Excavation100%

PARVATI NIWAS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Parvati Niwas

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

PARVATI NIWAS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Parvati Niwas

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%

PARVATI NIWAS

Plinth100%
Podiums (if any) 0%

Parvati Niwas

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%

PARVATI NIWAS

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Parvati Niwas

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

PARVATI NIWAS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Parvati Niwas

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

SONU AAI ARCADE

Basement (if any)100%

Sonu Aai Arcade

Excavation100%

SONU AAI ARCADE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Sonu Aai Arcade

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate85%

SONU AAI ARCADE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Sonu Aai Arcade

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Overall Percentage of Completion of the work done For the entire Building /Wing91%

SONU AAI ARCADE

Plinth100%
Podiums (if any) 80%

Sonu Aai Arcade

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

SONU AAI ARCADE

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Sonu Aai Arcade

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.85%

SONU AAI ARCADE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%

Sonu Aai Arcade

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums80%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 80%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.