📞 +91 98200 30685 ✉️
RERA: A51800043517

TRISHUL GOLDEN VILLE

by A PLUS LIFE SPACE Partnership
Certificate Signed P51700015246
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700015246
Registration No.
REA51700031918
Registration Date
2021-09-10
Developer
A PLUS LIFE SPACE Partnership
Architect
Destination Architecture Interior Designs
Proposed Possession
2022-12-26
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
9570.00 sq.m
Total FSI
15789.00
Approved FSI
15789.00
MahaRERA QR
TRISHUL GOLDEN VILLE
MahaRERA — P51700015246
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
Sanctioned13
🚗Open Parking15
🅿️Closed Parking18
📅Completion2021-12-26
🏗️Proposed Floors13
Sanctioned13
🚗Open Parking20
🅿️Closed Parking34
📅Completion2021-12-26

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 23.09000015258789 0 0 0
0%
1 Bhk 23.739999771118164 0 0 0
0%
1 Bhk 23.850000381469727 0 0 0
0%
1 Bhk 24.40999984741211 0 0 0
0%
1 Bhk 24.700000762939453 0 0 0
0%
1 Bhk 24.790000915527344 0 0 0
0%
1 Bhk 25.510000228881836 0 0 0
0%
1 Bhk 27.030000686645508 0 0 0
0%
1 Bhk 29.6299991607666 0 0 0
0%
1 Bhk 29.729999542236328 0 0 0
0%
1 Rk 22.079999923706055 0 0 0
0%
1 Rk 22.1200008392334 0 0 0
0%
1 Rk 22.799999237060547 0 0 0
0%
1 Rk 25.1299991607666 0 0 0
0%
2 Bhk 36.72999954223633 0 0 0
0%
2 Bhk 36.790000915527344 0 0 0
0%
2 Bhk 37.040000915527344 0 0 0
0%
2 Bhk 37.869998931884766 0 0 0
0%
Shop 10.920000076293945 0 0 0
0%
Shop 14.039999961853027 0 0 0
0%
Shop 17.68000030517578 0 0 0
0%
Shop 18.979999542236328 0 0 0
0%
Shop 28.290000915527344 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 23.85 48 41 7
85%
1 BHK 24.7 24 19 5
79%
1 BHK 24.79 24 22 2
92%
1 BHK 25.51 24 24 0
100%
1 BHK 27.03 24 22 2
92%
1 BHK 29.73 2 1 1
50%
1 RK 22.08 48 48 0
100%
2 BHK 36.79 10 6 4
60%
2 BHK 37.04 12 4 8
33%
2 BHK 37.87 12 7 5
58%
SHOP 10.92 4 0 4
0%
SHOP 14.04 2 0 2
0%
SHOP 17.68 2 1 1
50%
SHOP 18.98 2 0 2
0%
SHOP 28.29 3 3 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 23.09 12 11 1
92%
1 BHK 23.74 12 11 1
92%
1 BHK 24.41 24 23 1
96%
1 BHK 24.7 12 11 1
92%
1 BHK 27.03 24 22 2
92%
1 BHK 29.63 2 2 0
100%
1 RK 22.12 24 22 2
92%
1 RK 22.8 48 46 2
96%
1 RK 25.13 24 23 1
96%
2 BHK 36.73 10 6 4
60%
2 BHK 37.04 12 8 4
67%
2 BHK 37.87 12 7 5
58%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING B

Plinth100%
Podiums (if any) 0%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.