vedant nakshatra ABC phase 1

by MOHAN HARDASMAL THARWANI Individual
Certificate Signed P51700013039
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700013039
Registration No.
REA51700012134
Registration Date
2017-09-14
Developer
MOHAN HARDASMAL THARWANI Individual
Architect
Satish Oak
Project Bank
PUNJAB NATIONAL BANK
Proposed Possession
2017-12-31
Revised Possession
2017-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
3714.49 sq.m
Total FSI
4292.65
Approved FSI
4292.65
MahaRERA QR
vedant nakshatra ABC phase 1
MahaRERA — P51700013039
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🚗Open Parking6
🅿️Closed Parking6
📅Completion2017-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking6
🅿️Closed Parking14
📅Completion2017-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking7
🅿️Closed Parking16
📅Completion2017-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 30.239999771118164 0 0 0
0%
2 Bhk 43.790000915527344 0 0 0
0%
2 Bhk 44.54999923706055 0 0 0
0%
2Bhk 41.95000076293945 0 0 0
0%
2Bhk 45.439998626708984 0 0 0
0%
3 Bhk 66.69999694824219 0 0 0
0%
3Bhk 58.400001525878906 0 0 0
0%
Commercial 123.7300033569336 0 0 0
0%
Shop 1 25.520000457763672 0 0 0
0%
Shop 2 13.020000457763672 0 0 0
0%
Shop 3 17.59000015258789 0 0 0
0%
Shop 4 17.59000015258789 0 0 0
0%
Shop 5 12.739999771118164 0 0 0
0%
Shop 6 10.380000114440918 0 0 0
0%
Shop 7 27.829999923706055 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 41.95 13 9 4
69%
2 BHK 45.44 7 6 1
86%
3 BHK 58.4 6 2 4
33%
COMMERCIAL 123.73 1 0 1
0%
SHOP 1 25.52 1 0 1
0%
SHOP 2 13.02 1 0 1
0%
SHOP 3 17.59 1 1 0
100%
SHOP 4 17.59 1 1 0
100%
SHOP 5 12.74 1 0 1
0%
SHOP 6 10.38 1 1 0
100%
SHOP 7 27.83 1 0 1
0%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.24 14 13 1
93%
2 BHK 43.79 14 12 2
86%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 44.55 14 13 1
93%
3 BHK 66.7 14 8 6
57%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING B

Plinth100%
Podiums (if any) 0%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING C

Plinth100%
Podiums (if any) 0%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 60%
Community Buildings 80%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.