Project Information

RERA Certificate No.
P99000007769
Registration No.
REA99000011395
Registration Date
2017-08-18
Developer
NIKUNJ DEVELOPERS Partnership
Architect
Krutika Enterprises
Project Bank
RBL Bank Limited
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
11
Project Area
8130.00 sq.m
Total FSI
16041.61
Approved FSI
16041.61
MahaRERA QR
VEENA DYNASTY PH II
MahaRERA — P99000007769
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🚗Open Parking6
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking13
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking14
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking16
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking15
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking12
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking9
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking8
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking15
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking15
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking14
🅿️Closed Parking1
📅Completion2019-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 31.450000762939453 0 0 0
0%
1 Bhk 33.7400016784668 0 0 0
0%
1 Bhk 33.88999938964844 0 0 0
0%
1 Bhk 33.9900016784668 0 0 0
0%
1 Bhk 34.13999938964844 0 0 0
0%
1 Bhk 34.18000030517578 0 0 0
0%
1 Bhk 34.20000076293945 0 0 0
0%
1 Bhk 34.209999084472656 0 0 0
0%
1 Bhk 34.40999984741211 0 0 0
0%
1 Bhk 34.66999816894531 0 0 0
0%
1 Bhk 40.08000183105469 0 0 0
0%
1Bhk 33.88999938964844 0 0 0
0%
1Bhk 34.189998626708984 0 0 0
0%
1Bhk 34.40999984741211 0 0 0
0%
1Bhk 34.68000030517578 0 0 0
0%
2 Bhk 47.41999816894531 0 0 0
0%
2 Bhk 49.0 0 0 0
0%
2 Bhk 50.16999816894531 0 0 0
0%
2 Bhk 50.470001220703125 0 0 0
0%
2 Bhk 50.529998779296875 0 0 0
0%
2 Bhk 51.599998474121094 0 0 0
0%
2Bhk 46.869998931884766 0 0 0
0%
2Bhk 47.41999816894531 0 0 0
0%
Shop 9.890000343322754 0 0 0
0%
Shop 9.899999618530273 0 0 0
0%
Shop 10.029999732971191 0 0 0
0%
Shop 11.520000457763672 0 0 0
0%
Shop 12.520000457763672 0 0 0
0%
Shop 12.720000267028809 0 0 0
0%
Shop 13.350000381469727 0 0 0
0%
Shop 13.359999656677246 0 0 0
0%
Shop 13.680000305175781 0 0 0
0%
Shop 13.920000076293945 0 0 0
0%
Shop 15.899999618530273 0 0 0
0%
Shop 33.34000015258789 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.89 14 14 0
100%
1 BHK 34.2 14 14 0
100%
SHOP 9.89 1 1 0
100%
SHOP 9.9 1 1 0
100%
SHOP 13.35 1 1 0
100%
SHOP 13.36 3 3 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 31.45 7 6 1
86%
1 BHK 34.18 7 7 0
100%
1 BHK 34.19 7 7 0
100%
1 BHK 34.21 6 6 0
100%
SHOP 9.9 2 2 0
100%
SHOP 10.03 1 1 0
100%
SHOP 13.36 3 3 0
100%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.14 7 7 0
100%
1 BHK 34.67 14 14 0
100%
1 BHK 34.68 1 1 0
100%
1 BHK 40.08 1 1 0
100%
2 BHK 47.42 8 6 2
75%
2 BHK 49.0 7 7 0
100%
2 BHK 50.47 6 5 1
83%
2 BHK 50.53 1 1 0
100%
SHOP 11.52 1 1 0
100%
SHOP 12.52 1 1 0
100%
SHOP 12.72 1 1 0
100%
SHOP 13.68 1 1 0
100%
SHOP 13.92 2 2 0
100%
SHOP 15.9 1 1 0
100%
SHOP 33.34 1 1 0
100%

Wing D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.89 3 3 0
100%
1 BHK 34.41 27 27 0
100%

Wing E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.41 29 29 0
100%

Wing F

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.42 31 31 0
100%

Wing G

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.42 31 31 0
100%

Wing H

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.41 29 29 0
100%

Wing I

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.89 30 30 0
100%

Wing J

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.74 15 15 0
100%
1 BHK 33.99 8 8 0
100%
2 BHK 46.87 16 15 1
94%
2 BHK 51.6 8 8 0
100%

Wing K

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.42 23 23 0
100%
2 BHK 50.17 8 8 0
100%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING B

Plinth100%
Podiums (if any) 0%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING C

Plinth100%
Podiums (if any) 0%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING D

Basement (if any)100%

Wing D

Excavation100%

WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING D

Plinth100%
Podiums (if any) 0%

Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING E

Basement (if any)100%

Wing E

Excavation100%

WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING E

Plinth100%
Podiums (if any) 0%

Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING F

Basement (if any)100%

Wing F

Excavation100%

WING F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING F

Plinth100%
Podiums (if any) 0%

Wing F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING G

Basement (if any)100%

Wing G

Excavation100%

WING G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING G

Plinth100%
Podiums (if any) 0%

Wing G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing G

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING H

Basement (if any)100%

Wing H

Excavation100%

WING H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING H

Plinth100%
Podiums (if any) 0%

Wing H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing H

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING I

Basement (if any)100%

Wing I

Excavation100%

WING I

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing I

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING I

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing I

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING I

Plinth100%
Podiums (if any) 0%

Wing I

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING I

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing I

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING I

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing I

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING J

Basement (if any)100%

Wing J

Excavation100%

WING J

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing J

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING J

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing J

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING J

Plinth100%
Podiums (if any) 0%

Wing J

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING J

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing J

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING J

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing J

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING K

Basement (if any)100%

Wing K

Excavation100%

WING K

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing K

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING K

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing K

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING K

Plinth100%
Podiums (if any) 0%

Wing K

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING K

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing K

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING K

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing K

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 50%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 50%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 40%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.