Goregaon West · Mumbai
Vivan
Ram Mandir Road, Goregaon West · by Amal Group (Goregaon Electrical Industries LLP)
Updated Sep 2026
Goregaon WestPhotos from the project record · tap to enlarge
A first look at Vivan
Vivan is a residential project by Amal Group on Ram Mandir Road, Goregaon West, Mumbai 400104. It is registered with MahaRERA under P51800035019 (registered 2023-11-22). The project has 405 units across 5 buildings of up to 26 floors. It offers 1 & 2 BHK homes with carpet areas of 361–598 sq ft, priced ₹94.73 Lac–₹1.57 Cr as on 09 Jul 2026 (indicative). The quoted rate is about ₹26,200 per sq ft. MahaRERA proposed possession: Apr 2029.
Ask an advisor to verify current developer inventory and price.
Availability & Pricing
Prices as on 09 Jul 2026. Approximate pricing as on that date. Prices are indicative, subject to change and to reconfirmation with the developer.
💬 Request latest price on WhatsAppProperty listings in Vivan
Vivan floor plans
2Floor plans are indicative, as shared by the developer, and subject to change.
About Vivan
Location
Vivan is located on Ram Mandir Road, Goregaon West (Mumbai 400104), in the Mumbai Suburban district. Across 71 recent resale listings on MPE, homes in Goregaon West have a median asking rate of ₹32,183 per sq ft, and a 2 BHK typically rents for about ₹70,000 a month.
MahaRERA record
The MahaRERA registration number is P51800035019, issued on 22 November 2023. The registered promoter is Goregaon Electrical Industries LLP. The filing lists 5 wings: SALE COMPONENT IN REHAB BUILDING with 5 units over 25 floors; WING A with 122 units over 26 floors; WING B with 78 units over 26 floors; WING C with 78 units over 26 floors; WING D with 122 units over 26 floors. Per the registration, the project escrow account is with HDFC Bank.
Homes and prices
Configurations recorded are 1 BHK of 361–383 sq ft at ₹94.73 Lac–₹1 Cr; 2 BHK of 575–598 sq ft at ₹1.51 Cr–₹1.57 Cr (carpet area), as on 09 Jul 2026. That works out to about ₹26,100–₹26,300 per sq ft of carpet, 19% below the locality's resale median. Prices are indicative and should be reconfirmed with the developer before booking.
Construction and possession
The latest MahaRERA progress report shows foundation at 96%, structure at 100%, finishing at 58%, services at 66%. Proposed possession is Apr 2029.
Developer track record
Amal Group has 59 projects tracked on Mumbai Property Exchange, 51 of them delivered (ready or sold out).
Buyer demand in Goregaon West
In the last 90 days, buyers and tenants registered 37 requirements for Goregaon West with Mumbai Property Exchange, 13 of them to buy and 19 specifically for 1 & 2 BHK homes.
Price vs Locality
Upcoming projects & infrastructure in Goregaon West
take an informed decision42 MahaRERA projects are due to hand over in Goregaon West between 2027 and 2031; the nearest upcoming infrastructure to Vivan is the Goregaon-Mulund Link Road (GMLR), 1.1 km away (under construction · due 2028).
Supply is not evenly spread — one year carries almost half of it.
- 🚇Goregaon-Mulund Link Road (GMLR)Under construction · due 20281.1 km
- 🚇Line 6 PinkUnder construction · due 20272.3 km
- 🚇Line 3 AquaOpened 20253.0 km
- 🚇Line 2B YellowOpened 20263.5 km
🔒 Units handing over each year · price by BHK · years to absorb supply · competing projects · infra impact on prices
Prices and timelines are indicative and subject to change. See the disclaimer at the foot of this page.
Goregaon West — resale, rent & yield
This project is quoted around ₹26,212/sqft — 19% below resale here.
From MPE live listings, last 18 months · Mumbai price index ›
Unit Configurations (per MahaRERA)
RERA record & possession
Buildings · 5 wings
405 unitsLocation
Construction progress
per MahaRERASee all 14 stages ▾
Amenities
13+5 more ▾
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventoryGoregaon West market context
Property Rates in Goregaon West
Resale Flats for Sale in Goregaon West
4Flats for Rent in Goregaon West
4Commercial for Sale in Goregaon West
2Commercial for Lease in Goregaon West
4Commercial Projects in Goregaon West
Compare Vivan with similarly priced projects nearby
MahaRERA projects nearby in Goregaon West
Next steps — clarity before you step out
Buying a home is not a quick decision. In association with developers, Mumbai Property Exchange sets up the video briefings, the site visits and the paperwork questions — so your homework is done before you commit an afternoon.
Frequently Asked Questions
Where is Vivan located?
Vivan is on Ram Mandir Road, Goregaon West, Mumbai 400104.
What is the price of Vivan?
1 & 2 BHK homes are priced ₹94.73 Lac–₹1.57 Cr as on 09 Jul 2026, about ₹26,200 per sq ft. Prices are indicative and subject to reconfirmation with the developer.
What configurations and carpet areas does Vivan offer?
1 BHK – 361 sq ft carpet at ₹94.73 Lac; 1 BHK – 380 sq ft carpet at ₹99.55 Lac; 1 BHK – 383 sq ft carpet at ₹1 Cr; 2 BHK – 575 sq ft carpet at ₹1.51 Cr; 2 BHK – 598 sq ft carpet at ₹1.57 Cr.
When is possession of Vivan?
As per MahaRERA, proposed possession is Apr 2029.
Is Vivan RERA-registered?
Yes — MahaRERA registration P51800035019, registered 2023-11-22.
How many units does Vivan have?
MahaRERA records 405 units across 19 buildings, up to 26 floors.
Who is the developer of Vivan?
Amal Group (Goregaon Electrical Industries LLP) — 59 projects tracked on Mumbai Property Exchange. View their track record ▸
How many new projects are coming up in Goregaon West?
42 MahaRERA-registered projects in Goregaon West are due for possession between 2027 and 2031, as per MahaRERA registrations. Timelines can change.
What metro and infrastructure is near Vivan?
Goregaon-Mulund Link Road (GMLR) — under construction · due 2028, 1.1 km away; Line 6 Pink — under construction · due 2027, 2.3 km away; Line 3 Aqua — opened 2025, 3.0 km away; Line 2B Yellow — opened 2026, 3.5 km away. Timelines are as announced and can change.
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.


