W
✓ MahaRERA P52000053540RERA: no litigation reported253
Units
2029
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2029
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
1 BHK389–435 ft²On request
2 BHK639–645 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P52000053540
Registered
2023-11-10
Litigation
No reported in source
Escrow Bank
ICICI BANK LIMITED
Architect
—
Total FSI
13051
04
Buildings · 1 Wing(s)
Wise City Rz8 Building No-1 Wing-A2 Type-C26 floors · 253 units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Wadhwa Wise City
18.9655573,73.1946573
18.9655573,73.1946573
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
Manohar Moolchand ChhabriaDirector
Navin Amarlal MakhijaDirector
09
Construction Progress
0% avgBasement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%
10
Amenities
Community BuildingsElectrical Meter Room, Sub-Station, Receiving StationEnergy managementFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Solid Waste Management And DisposalStorm Water DrainsStreet LightingTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Wadhwa Wise City
Residential · Sale
₹10,000–15,000/sqft
Commercial · Sale
₹6,000–10,000/sqft
2 BHK · Rent
₹15,000–35,000/mo
Full rates
14
More by Wadhwa Construction And Infrastructure
15
MahaRERA projects nearby in Wadhwa Wise City
wise city, south Block, Phase I, Plot RZ8 Building 1 wing A3253 unitsWise City RZ-01 Plotted Development - Phase 1149 unitsWise City RZ-01 Plotted Development - Phase 3104 unitsWise City Rz8 Wing D5103 unitsWise City RZ-01 Plotted Development - Phase 288 unitsWise City CZ-05 Retail Building85 unitsWise City RZ8 Wing B1Wise City, South Block Phase I, Plot Rz8 Building 3 Wing C1Wise City RZ8 Wing E2Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1Wise City, South Block Phase I, Plot RZ8 Building 5 Wing D3Wise City,South Block Phase I, Plot RZ8 Building 6 Wing A4
?
Frequently Asked Questions
When is possession of Wise City Rz8 Wing A2?
As per MahaRERA, proposed possession is Dec 2029.
Is Wise City Rz8 Wing A2 RERA-registered?
Yes — MahaRERA registration P52000053540, registered 2023-11-10. The current MahaRERA source record reports no litigations.
Who is the developer?
Wadhwa Construction And Infrastructure — 61 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.