📞 +91 98200 30685 ✉️
RERA: A51800043517

YOGI NIWAS

by ELITE INFRASTRUCTURE Partnership
Certificate Signed P51700015565
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700015565
Registration No.
REA51700033371
Registration Date
2021-09-10
Developer
ELITE INFRASTRUCTURE Partnership
Architect
Mr Jitendra S Patel Samarthya Engineers
Project Bank
KALLAPPANNA AWADE ICHALKARANJI JANATA SAHAKARI BANK LIMITED
Proposed Possession
2026-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
5
Project Area
1124.73 sq.m
Total FSI
13766.95
Approved FSI
6358.70
MahaRERA QR
YOGI NIWAS
MahaRERA — P51700015565
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
📅Completion2025-10-30
🏗️Proposed Floors9
Sanctioned9
📅Completion2025-10-30
🏗️Proposed Floors9
Sanctioned9
📅Completion2025-10-30
🏗️Proposed Floors8
Sanctioned8
📅Completion2025-04-30
🏗️Proposed Floors11
Sanctioned11
📅Completion2025-10-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 0 0 0
0%
1Bhk 24.459999084472656 0 0 0
0%
1Bhk 25.25 0 0 0
0%
1Bhk 25.690000534057617 0 0 0
0%
1Bhk 27.190000534057617 0 0 0
0%
1Bhk 27.5 0 0 0
0%
1Bhk 27.889999389648438 0 0 0
0%
1Bhk 28.0 0 0 0
0%
1Bhk 28.670000076293945 0 0 0
0%
1Bhk 29.479999542236328 0 0 0
0%
1Bhk 30.110000610351562 0 0 0
0%
1Bhk 30.25 0 0 0
0%
1Bhk 30.799999237060547 0 0 0
0%
1Bhk 31.149999618530273 0 0 0
0%
1Bhk 33.43000030517578 0 0 0
0%
1Bhk 33.52000045776367 0 0 0
0%

Building No 10

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.19 28 28 0
100%

Building No 11

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 24.46 7 7 0
100%
1 BHK 25.69 7 7 0
100%
1 BHK 28.0 7 7 0
100%
1 BHK 31.15 7 6 1
86%

Building No 12

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.25 7 7 0
100%
1 BHK 27.5 7 7 0
100%
1 BHK 33.43 7 7 0
100%
1 BHK 33.52 7 7 0
100%

Building No 13

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 0 0 0
0%

Building No 7-8

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.89 9 9 0
100%
1 BHK 28.67 9 8 1
89%
1 BHK 29.48 9 9 0
100%
1 BHK 30.11 18 16 2
89%
1 BHK 30.25 18 18 0
100%
1 BHK 30.8 9 9 0
100%

Construction Progress

BUILDING NO 10

Basement (if any)0%

Building No 10

Excavation0%

BUILDING NO 10

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building No 10

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO 10

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building No 10

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

BUILDING NO 10

Plinth0%
Podiums (if any) 0%

Building No 10

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING NO 10

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Building No 10

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING NO 10

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 10

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

BUILDING NO 11

Basement (if any)0%

Building No 11

Excavation50%

BUILDING NO 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building No 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building No 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing5%

BUILDING NO 11

Plinth0%
Podiums (if any) 0%

Building No 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING NO 11

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Building No 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING NO 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 11

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

BUILDING NO 12

Basement (if any)0%

Building No 12

Excavation50%

BUILDING NO 12

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building No 12

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO 12

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building No 12

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing5%

BUILDING NO 12

Plinth0%
Podiums (if any) 0%

Building No 12

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING NO 12

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Building No 12

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING NO 12

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 12

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

BUILDING NO 13

Basement (if any)0%

Building No 13

Excavation0%

BUILDING NO 13

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building No 13

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO 13

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building No 13

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

BUILDING NO 13

Plinth0%
Podiums (if any) 0%

Building No 13

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING NO 13

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Building No 13

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING NO 13

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 13

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

BUILDING NO 7-8

Basement (if any)0%

Building No 7-8

Excavation0%

BUILDING NO 7-8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building No 7-8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO 7-8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building No 7-8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

BUILDING NO 7-8

Plinth0%
Podiums (if any) 0%

Building No 7-8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING NO 7-8

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Building No 7-8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING NO 7-8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 7-8

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space 30%
Community Buildings 50%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.