Units Sold
0
Buildings
3
Project Area
3428.01 sq.m
Total FSI
4561.96
Approved FSI
4561.96
MahaRERA QR
ZP HILL WING D G H
MahaRERA — P51700011140
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
Sanctioned7
📅Completion2021-06-30
🏗️Proposed Floors7
Sanctioned7
🚗Open Parking83
📅Completion2019-12-31
🏗️Proposed Floors7
Sanctioned7
📅Completion2021-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Residencial 1908.72998046875 0 0 0
0%
Residencial 1930.510009765625 0 0 0
0%

Zp Hill H

Type Carpet (sq.ft) Total Booked Available Status
RESIDENCIAL 1908.73 28 27 1
96%

Zp Hill Wing D

Type Carpet (sq.ft) Total Booked Available Status
RESIDENCIAL 1930.51 53 53 0
100%

Zp Hill Wing G

Type Carpet (sq.ft) Total Booked Available Status
RESIDENCIAL 1908.73 28 27 1
96%

Construction Progress

ZP HILL H

Basement (if any)100%

Zp Hill H

Excavation100%

ZP HILL H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Zp Hill H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ZP HILL H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Zp Hill H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

ZP HILL H

Plinth100%
Podiums (if any) 0%

Zp Hill H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ZP HILL H

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Zp Hill H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ZP HILL H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Zp Hill H

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ZP HILL WING D

Basement (if any)100%

Zp Hill Wing D

Excavation100%

ZP HILL WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Zp Hill Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ZP HILL WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Zp Hill Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

ZP HILL WING D

Plinth100%
Podiums (if any) 0%

Zp Hill Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ZP HILL WING D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Zp Hill Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ZP HILL WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Zp Hill Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ZP HILL WING G

Basement (if any)100%

Zp Hill Wing G

Excavation100%

ZP HILL WING G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Zp Hill Wing G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ZP HILL WING G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Zp Hill Wing G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

ZP HILL WING G

Plinth100%
Podiums (if any) 0%

Zp Hill Wing G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ZP HILL WING G

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Zp Hill Wing G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ZP HILL WING G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Zp Hill Wing G

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.