Project Information

RERA Certificate No.
P51800077600
Registration No.
REA51800164616
Registration Date
2024-10-15
Developer
SUSHANKU REALTY PRIVATE LIMITED
Architect
Mitie Designers And Planners Pvt Ltd
Project Bank
AU SMALL FINANCE BANK LIMITED
Proposed Possession
2027-12-31
Total Units
234
Units Sold
13 (6%)
Project Area
2385.98 sq.m
Total FSI
14422.76
Approved FSI
14422.76
MahaRERA QR
SUSHANKU AVENUE 37
MahaRERA — P51800077600
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking1
📅Completion2027-03-31
🅿️Closed Parking1
📅Completion2027-03-31

Apartment Configurations

Sushanku Avenue 37 A Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK MHADA 49.56 4 0 4
0%
2 BHK MHADA 49.7 3 0 3
0%
2 BHK MHADA 49.81 2 0 2
0%
2 BHK MHADA 49.9 2 0 2
0%
2 BHK REHAB 49.56 32 0 32
0%
2 BHK REHAB 49.7 16 0 16
0%
2 BHK REHAB 49.81 16 0 16
0%
2 BHK REHAB 49.9 16 0 16
0%
2 BHK SALES 49.56 5 0 5
0%
2 BHK SALES 49.7 3 0 3
0%
2 BHK SALES 49.81 2 0 2
0%
2 BHK SALES 49.9 2 0 2
0%
4 BHK SALES 80.01 1 0 1
0%
SALES MP ROOM 17.41 1 0 1
0%
SHOP SALES 91.69 1 0 1
0%
SHOP SALES 213.24 1 0 1
0%

Sushanku Avenue 37 B Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK SALES 56.16 22 0 22
0%
2 BHK SALES 56.92 19 0 19
0%
2 BHK SALES 59.16 21 0 21
0%
2 BHK SALES 60.25 41 0 41
0%
2 BHK SALES 65.85 22 0 22
0%
3 BHK SALES 75.34 1 0 1
0%
3 BHK SALES 76.86 1 0 1
0%

Construction Progress

Sushanku Avenue 37 A Wing

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

SUSHANKU AVENUE 37 B WING

Basement (if any)0%

Sushanku Avenue 37 B Wing

Excavation0%

SUSHANKU AVENUE 37 B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Sushanku Avenue 37 B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

SUSHANKU AVENUE 37 B WING

Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Sushanku Avenue 37 B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

SUSHANKU AVENUE 37 B WING

Plinth0%
Podiums (if any) 0%

Sushanku Avenue 37 B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

SUSHANKU AVENUE 37 B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Sushanku Avenue 37 B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

SUSHANKU AVENUE 37 B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Sushanku Avenue 37 B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.