📞 +91 98200 30685 ✉️
RERA: A51800043517

Anand Kirti Tower

by S R and Shah Developers Partnership
Certificate Signed P99000003076
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000003076
Registration No.
REA99000010467
Registration Date
2024-05-02
Developer
S R and Shah Developers Partnership
Project Bank
VASAI VIKAS SAHAKARI BANK LIMITED
Proposed Possession
2021-06-30
Revised Possession
2021-06-30
Extended Possession
2025-12-31
Units Sold
0
Buildings
2
Project Area
1297.38 sq.m
Total FSI
6517.65
Approved FSI
6517.65
MahaRERA QR
Anand Kirti Tower
MahaRERA — P99000003076
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
Sanctioned17
🅿️Closed Parking1
📅Completion2017-03-31
🏗️Proposed Floors1
Sanctioned1
🅿️Closed Parking1
📅Completion2021-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 36.349998474121094 0 0 0
0%
1Bhk 36.689998626708984 0 0 0
0%
1Bhk 38.349998474121094 0 0 0
0%
1Bhk 38.5099983215332 0 0 0
0%
1Bhk 38.61000061035156 0 0 0
0%
1Bhk 38.65999984741211 0 0 0
0%
1Bhk 38.689998626708984 0 0 0
0%
1Bhk 38.79999923706055 0 0 0
0%
1Bhk 39.02000045776367 0 0 0
0%
2Bhk 55.029998779296875 0 0 0
0%
3Bhk 77.0199966430664 0 0 0
0%
Shop 13.010000228881836 0 0 0
0%
Shop 13.930000305175781 0 0 0
0%
Shop 14.34000015258789 0 0 0
0%
Shop 14.930000305175781 0 0 0
0%
Shop 15.09000015258789 0 0 0
0%
Shop 16.170000076293945 0 0 0
0%
Shop 16.799999237060547 0 0 0
0%
Shop 17.65999984741211 0 0 0
0%
Shop 17.780000686645508 0 0 0
0%
Shop 30.739999771118164 0 0 0
0%
Shop 40.22999954223633 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 36.35 15 8 7
53%
1 BHK 36.69 15 11 4
73%
1 BHK 38.35 14 10 4
71%
1 BHK 38.51 22 15 7
68%
1 BHK 38.61 1 0 1
0%
1 BHK 38.66 1 1 0
100%
1 BHK 38.69 14 11 3
79%
1 BHK 38.8 1 1 0
100%
1 BHK 39.02 1 1 0
100%
2 BHK 55.03 15 7 8
47%
3 BHK 77.02 1 1 0
100%
Shop 13.01 1 1 0
100%
Shop 13.93 1 1 0
100%
Shop 14.34 1 1 0
100%
Shop 14.93 1 1 0
100%
Shop 15.09 2 2 0
100%
Shop 16.17 1 1 0
100%
Shop 16.8 1 1 0
100%
Shop 17.66 2 1 1
50%
Shop 30.74 1 1 0
100%
Shop 40.23 1 1 0
100%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
Shop 17.78 2 0 2
0%

Construction Progress

A wing

Basement (if any)100%

A Wing

Excavation100%

A wing

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A wing

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing50%

A wing

Plinth100%
Podiums (if any) 100%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A wing

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

A wing

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C wing

Basement (if any)100%

C Wing

Excavation100%

C wing

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C wing

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing50%

C wing

Plinth100%
Podiums (if any) 100%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C wing

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

C wing

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

C Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.