Antaliya

by Platinum Realty And Infrastructure Private Limited
Certificate SignedP51700003659
AntaliyaProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700003659
Registration No.
REA51700018351
Registration Date
2021-09-09
Developer
Platinum Realty And Infrastructure Private Limited
Architect
ALIM AK FOUZI
Project Bank
AXIS BANK
Proposed Possession
2029-04-30
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Total Units
94
Units Sold
48 (51%)
Buildings
1
Project Area
7407.64 sq.m
Total FSI
6266.37
Approved FSI
6266.37
MahaRERA QR
Antaliya
MahaRERA โ€” P51700003659
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors11
โœ…Sanctioned11
๐Ÿ Habitable9
๐Ÿ”ขTotal Units94
๐ŸกResidential94

Apartment Configurations

ANTALIYA

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK49.73954
56%
1BHK51.9954
56%
2BHK75.75101
0%
2BHK76.49972
78%
2BHK81.07936
33%
2BHK81.44101
0%
2BHK81.94101
0%
2BHK87.95909
0%
2BHK87.95936
33%
3BHK102.0718216
11%
3BHK105.2918018
0%
3BHK109.513-2
300%

Construction Progress

ANTALIYA

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station
โœ…Energy managemcnt
โœ…Fire protection and fire safety requirements
โœ…Internal Roads & Footpaths60%
โฌœLandscaping & Tree Planting
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)20%
โฌœSolid Waste Management And Disposal
โœ…Storm Water Drains
โœ…Street Lighting
โฌœTreatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting