ASHTHA GOREGAON WEST

by TOWN DEVELOPERS Partnership
Certificate Signed P51800001546
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800001546
Registration No.
REA51800006554
Registration Date
2019-01-30
Developer
TOWN DEVELOPERS Partnership
Architect
Indo Build Designs Pvt Ltd
Project Bank
BANK OF BARODA
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2021-11-28
Units Sold
0
Buildings
3
Project Area
2028.40 sq.m
Total FSI
2028.40
Approved FSI
2028.40
MahaRERA QR
ASHTHA GOREGAON WEST
MahaRERA — P51800001546
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors26
Sanctioned26
🚗Open Parking64
📅Completion2023-12-31
🏗️Proposed Floors19
Sanctioned19
🚗Open Parking14
📅Completion2023-12-31
🏗️Proposed Floors10
Sanctioned10
🚗Open Parking1
📅Completion2023-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 21.1200008392334 0 0 0
0%
1 Bhk 21.780000686645508 0 0 0
0%
1 Bhk 25.020000457763672 0 0 0
0%
1 Bhk 26.1299991607666 0 0 0
0%
1 Bhk 26.549999237060547 0 0 0
0%
1 Bhk 39.11000061035156 0 0 0
0%
1 Bhk 39.15999984741211 0 0 0
0%
1 Bhk 44.88999938964844 0 0 0
0%
2 Bhk 49.7599983215332 0 0 0
0%
2 Bhk 49.869998931884766 0 0 0
0%
2 Bhk 50.349998474121094 0 0 0
0%
2 Bhk 50.849998474121094 0 0 0
0%
2 Bhk 52.20000076293945 0 0 0
0%
2 Bhk 56.650001525878906 0 0 0
0%
2 Bhk 60.18000030517578 0 0 0
0%
2 Bhk 60.93000030517578 0 0 0
0%
3 Bhk 67.3499984741211 0 0 0
0%
3 Bhk 70.2699966430664 0 0 0
0%
Multipurpose Room 12.329999923706055 0 0 0
0%
Multipurpose Room 12.5600004196167 0 0 0
0%
Nursing Home 59.0 0 0 0
0%
Poly Clinic 84.0 0 0 0
0%
Shop 6.5 0 0 0
0%
Shop 8.239999771118164 0 0 0
0%
Shop 9.100000381469727 0 0 0
0%
Shop 9.449999809265137 0 0 0
0%
Shop 9.609999656677246 0 0 0
0%
Shop 9.739999771118164 0 0 0
0%
Shop 15.800000190734863 0 0 0
0%
Shop 16.239999771118164 0 0 0
0%
Shop 19.739999771118164 0 0 0
0%
Shop 25.559999465942383 0 0 0
0%
Storage 1.590000033378601 0 0 0
0%

Ashtha Heights

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 44.89 1 0 1
0%
2 BHK 49.76 10 0 10
0%
2 BHK 49.87 3 0 3
0%
2 BHK 50.35 5 5 0
100%
2 BHK 50.85 4 2 2
50%
2 BHK 52.2 1 1 0
100%
2 BHK 56.65 22 7 15
32%
2 BHK 60.18 1 0 1
0%
2 BHK 60.93 11 4 7
36%
3 BHK 67.35 1 1 0
100%
3 BHK 70.27 10 2 8
20%

Ashtha Kalash

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 21.12 3 3 0
100%
1 BHK 21.78 10 7 3
70%
1 BHK 25.02 14 14 0
100%
1 BHK 25.56 1 0 1
0%
1 BHK 26.13 4 4 0
100%
1 BHK 26.55 5 5 0
100%
1 BHK 39.11 1 1 0
100%
1 BHK 39.16 1 1 0
100%
MULTIPURPOSE ROOM 12.56 1 1 0
100%
NURSING HOME 59.0 1 1 0
100%
POLY CLINIC 84.0 1 1 0
100%
SHOP 6.5 1 1 0
100%
SHOP 8.24 1 1 0
100%
SHOP 9.1 1 1 0
100%
SHOP 9.74 1 0 1
0%
SHOP 15.8 1 1 0
100%
SHOP 19.74 1 1 0
100%

Ashtha Sai

Type Carpet (sq.ft) Total Booked Available Status
MULTIPURPOSE ROOM 12.33 1 0 1
0%
SHOP 9.45 1 1 0
100%
SHOP 9.61 1 1 0
100%
SHOP 16.24 1 0 1
0%
STORAGE 1.59 0 0 0
0%

Construction Progress

ASHTHA HEIGHTS

Basement (if any)100%

Ashtha Heights

Excavation100%

ASHTHA HEIGHTS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Ashtha Heights

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

ASHTHA HEIGHTS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Ashtha Heights

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing99%

ASHTHA HEIGHTS

Plinth100%
Podiums (if any) 100%

Ashtha Heights

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ASHTHA HEIGHTS

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Ashtha Heights

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ASHTHA HEIGHTS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Ashtha Heights

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

ASHTHA KALASH

Basement (if any)100%

Ashtha Kalash

Excavation100%

ASHTHA KALASH

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Ashtha Kalash

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ASHTHA KALASH

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Ashtha Kalash

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

ASHTHA KALASH

Plinth100%
Podiums (if any) 0%

Ashtha Kalash

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ASHTHA KALASH

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Ashtha Kalash

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ASHTHA KALASH

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Ashtha Kalash

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ASHTHA SAI

Basement (if any)100%

Ashtha Sai

Excavation100%

ASHTHA SAI

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Ashtha Sai

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ASHTHA SAI

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Ashtha Sai

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

ASHTHA SAI

Plinth100%
Podiums (if any) 0%

Ashtha Sai

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ASHTHA SAI

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Ashtha Sai

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ASHTHA SAI

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Ashtha Sai

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.