RERA: A51800043517

ASMI LEGACY

by ASMI DEVELOPERS Partnership
Certificate Signed P51800031746
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800031746
Registration No.
REA51800096028
Registration Date
2021-11-08
Developer
ASMI DEVELOPERS Partnership
Architect
Shilp Associates
Project Bank
IDBI BANK
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
3833.53 sq.m
Total FSI
12754.37
MahaRERA QR
ASMI LEGACY
MahaRERA — P51800031746
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors42
Sanctioned42
⬇️Basements1
🅿️Closed Parking242
📅Completion2026-12-31
🏗️Proposed Floors43
Sanctioned43
⬇️Basements1
🅿️Closed Parking123
📅Completion2026-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 39.63999938964844 0 0 0
0%
1Bhk 43.77000045776367 0 0 0
0%
1Bhk 44.25 0 0 0
0%
1Bhk 71.98999786376953 0 0 0
0%
2Bhk 68.56999969482422 0 0 0
0%
2Bhk 69.70999908447266 0 0 0
0%
2Bhk 70.47000122070312 0 0 0
0%
2Bhk 70.55000305175781 0 0 0
0%
2Bhk 70.80000305175781 0 0 0
0%
2Bhk 71.16999816894531 0 0 0
0%
2Bhk 73.05999755859375 0 0 0
0%
2Bhk 73.08000183105469 0 0 0
0%
2Bhk 73.51000213623047 0 0 0
0%
2Bhk 75.61000061035156 0 0 0
0%
2Bhk 76.30000305175781 0 0 0
0%
2Bhk 76.44000244140625 0 0 0
0%
2Bhk 76.55000305175781 0 0 0
0%
2Bhk 76.80999755859375 0 0 0
0%
2Bhk 76.83999633789062 0 0 0
0%
2Bhk 76.98999786376953 0 0 0
0%
2Bhk 99.4000015258789 0 0 0
0%
3Bhk 98.7300033569336 0 0 0
0%
3Bhk 101.54000091552734 0 0 0
0%
3Bhk 101.94000244140625 0 0 0
0%

Desire

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 39.64 17 3 14
18%
1 BHK 43.77 17 17 0
100%
1 BHK 44.25 17 15 2
88%
1 BHK 71.99 1 1 0
100%
2 BHK 68.57 14 7 7
50%
2 BHK 73.06 15 15 0
100%
2 BHK 73.08 17 17 0
100%
2 BHK 73.51 16 2 14
12%
2 BHK 99.4 1 1 0
100%
3 BHK 98.73 16 2 14
12%

Destiny

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 69.71 1 0 1
0%
2 BHK 70.47 1 1 0
100%
2 BHK 70.55 4 0 4
0%
2 BHK 70.8 4 0 4
0%
2 BHK 71.17 26 0 26
0%
2 BHK 75.61 1 0 1
0%
2 BHK 76.3 5 0 5
0%
2 BHK 76.44 9 2 7
22%
2 BHK 76.55 5 0 5
0%
2 BHK 76.81 12 2 10
17%
2 BHK 76.84 12 1 11
8%
2 BHK 76.99 25 5 20
20%
3 BHK 101.54 8 3 5
38%
3 BHK 101.94 22 10 12
45%

Construction Progress

DESIRE

Basement (if any)100%

Desire

Excavation100%

DESIRE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Desire

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

DESIRE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Desire

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing28%

DESIRE

Plinth100%
Podiums (if any) 100%

Desire

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

DESIRE

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure6%

Desire

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

DESIRE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Desire

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums80%
X number of Slabs of Super Structure0%

DESTINY

Basement (if any)100%

Destiny

Excavation100%

DESTINY

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Destiny

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

DESTINY

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Destiny

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing28%

DESTINY

Plinth100%
Podiums (if any) 100%

Destiny

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

DESTINY

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure6%

Destiny

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

DESTINY

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Destiny

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums80%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.