Project Information

RERA Certificate No.
P51800032085
Registration No.
REA51800096027
Registration Date
2025-12-26
Developer
Angel Construction Company
Project Bank
HDFC BANK
Proposed Possession
2024-12-31
Revised Possession
1900-01-01
Extended Possession
2025-12-31
Total Units
168
Units Sold
94 (56%)
Buildings
3
Project Area
3077.00 sq.m
Total FSI
7142.40
MahaRERA QR
Asmi Legend
MahaRERA — P51800032085
Scan to verify on MahaRERA portal

Wing-wise Details

šŸ—ļøProposed Floors4
āœ…Sanctioned4
šŸ“…Completion2024-12-31
šŸ—ļøProposed Floors20
āœ…Sanctioned20
šŸ“…Completion2024-12-31
šŸ—ļøProposed Floors21
āœ…Sanctioned21
šŸ“…Completion2024-12-31

Apartment Configurations

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL24.95101
0%
COMMERCIAL81.27101
0%
COMMERCIAL242.24101
0%
COMMERCIAL324.95101
0%
COMMERCIAL640.34101
0%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.119154
79%
1 BHK43.66110
100%
2 BHK49.891596
60%
2 BHK49.99413
25%
2 BHK58.2315105
67%
2 BHK58.891495
64%

C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.1392613
67%
1 BHK36.64110
100%
1 BHK41.27202
0%
1 BHK50.23361422
39%

Construction Progress

A WING

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

A Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%
Overall Percentage of Completion of the work done For the entire Building /Wing77%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B WING

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises45%
Slabs of Super Structure90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%

B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises65%
Overall Percentage of Completion of the work done For the entire Building /Wing50%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure90%

C WING

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises45%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%

C Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises65%
Overall Percentage of Completion of the work done For the entire Building /Wing50%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure85%

RERA Registered Amenities

āœ…Aggregate area of recreational Open Space
⬜Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station
āœ…Energy management
āœ…Fire Protection And Fire Safety Requirements
āœ…Landscaping & Tree Planting
⬜Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)
āœ…Solid Waste Management And Disposal
āœ…Storm Water Drains
āœ…Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water
āœ…Water Conservation, Rain water Harvesting
āœ…Water Supply
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
šŸ‘‹ Looking for the right project? Let me help you find it!
šŸ—ļø
MPE Project Advisor
ā— Online now