📞 +91 98200 30685 ✉️
RERA: A51800043517

Commercial-1

by S M Associates
Kept in Abeyance P51700002132
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700002132
Registration No.
REA51700007986
Developer
S M Associates
Architect
D M Dalvi &Amp; Associates
Project Bank
RBL BANK LIMITED
Proposed Possession
2018-06-30
Revised Possession
2018-12-31
Extended Possession
2024-06-30
Buildings
1
Project Area
1240.23 sq.m
Total FSI
8473.23
MahaRERA QR
Commercial-1
MahaRERA — P51700002132
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements1
🅿️Closed Parking14
📅Completion1900-01-01

Apartment Configurations

Commercial-1

Type Carpet (sq.ft) Total Booked Available Status
SHOP 48.52 15 6 9
40%
SHOP 58.8 15 3 12
20%
SHOP 66.75 15 0 15
0%
SHOP 80.92 9 0 9
0%
SHOP 80.97 6 1 5
17%
SHOP 90.82 1 1 0
100%
SHOP 97.04 1 1 0
100%
SHOP 100.44 1 1 0
100%
SHOP 106.68 1 1 0
100%
SHOP 108.55 1 1 0
100%
SHOP 109.99 1 1 0
100%
SHOP 114.78 1 1 0
100%
SHOP 116.22 1 1 0
100%
SHOP 122.97 5 2 3
40%
SHOP 125.13 2 1 1
50%
SHOP 136.82 1 1 0
100%
SHOP 143.06 1 1 0
100%
SHOP 172.62 5 0 5
0%
SHOP 212.18 1 1 0
100%
SHOP 459.37 1 1 0
100%
SHOP 526.92 1 0 1
0%
SHOP 716.58 1 0 1
0%

Construction Progress

Commercial-1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing69%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains 50%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.