Commercial-1

by S M Associates
Kept in AbeyanceP51700002132
Commercial-1Project photos will appear here when available.

Project Information

RERA Certificate No.
P51700002132
Registration No.
REA51700007986
Developer
S M Associates
Architect
D M Dalvi &Amp; Associates
Project Bank
RBL BANK LIMITED
Proposed Possession
2018-06-30
Revised Possession
2018-12-31
Extended Possession
2024-06-30
Buildings
1
Project Area
1240.23 sq.m
Total FSI
8473.23
MahaRERA QR
Commercial-1
MahaRERA โ€” P51700002132
Scan to verify on MahaRERA portal

Wing-wise Details

โฌ‡๏ธBasements1
๐Ÿ…ฟ๏ธClosed Parking14
๐Ÿ“…Completion1900-01-01

Apartment Configurations

Commercial-1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
SHOP48.521569
40%
SHOP58.815312
20%
SHOP66.7515015
0%
SHOP80.92909
0%
SHOP80.97615
17%
SHOP90.82110
100%
SHOP97.04110
100%
SHOP100.44110
100%
SHOP106.68110
100%
SHOP108.55110
100%
SHOP109.99110
100%
SHOP114.78110
100%
SHOP116.22110
100%
SHOP122.97523
40%
SHOP125.13211
50%
SHOP136.82110
100%
SHOP143.06110
100%
SHOP172.62505
0%
SHOP212.18110
100%
SHOP459.37110
100%
SHOP526.92101
0%
SHOP716.58101
0%

Construction Progress

Commercial-1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing69%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical Meter Room, Sub-Station, Receiving Station100%
โฌœEnergy management
โœ…Fire Protection And Fire Safety Requirements
โฌœLandscaping & Tree Planting
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โฌœSolid Waste Management And Disposal
โœ…Storm Water Drains50%
โœ…Street Lighting
โฌœTreatment And Disposal Of Sewage And Sullage Water
โœ…Water Conservation, Rain water Harvesting
โœ…Water Supply

Latest Mumbai Property News