📞 +91 98200 30685 ✉️
RERA: A51800043517

DB Ozone

by NEELKAMAL REALTORS SUBURBAN PRIVATE LIMITED Company
Certificate Signed P51700003433
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700003433
Registration No.
REA51700012011
Registration Date
2019-07-16
Developer
NEELKAMAL REALTORS SUBURBAN PRIVATE LIMITED Company
Architect
Avinash Mhatre & Associates
Project Bank
HDFC BANK
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2024-12-30
Units Sold
0
Buildings
25
Project Area
38400.60 sq.m
Total FSI
165138.00
Approved FSI
161994.00
MahaRERA QR
DB Ozone
MahaRERA — P51700003433
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking62
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking50
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking56
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking39
📅Completion2019-12-31
🏗️Proposed Floors25
Sanctioned25
⬇️Basements2
🅿️Closed Parking48
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking56
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking74
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors25
Sanctioned25
⬇️Basements2
🅿️Closed Parking48
📅Completion2019-12-31
🏗️Proposed Floors25
Sanctioned25
⬇️Basements2
🅿️Closed Parking48
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking62
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking62
📅Completion2019-12-31
🏗️Proposed Floors25
Sanctioned25
⬇️Basements2
🅿️Closed Parking80
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking85
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors26
Sanctioned26
⬇️Basements2
🅿️Closed Parking85
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31
🏗️Proposed Floors25
Sanctioned25
⬇️Basements2
🅿️Closed Parking48
📅Completion2019-12-31
🏗️Proposed Floors24
Sanctioned24
⬇️Basements2
🅿️Closed Parking66
📅Completion2019-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
23 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
23 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
23 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
23 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
23 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
23 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
24 X01 Even 2Bhk 50.849998474121094 0 0 0
0%
24 X01 Odd 2Bhk 51.33000183105469 0 0 0
0%
24 X02 Even 1Bhk 33.66999816894531 0 0 0
0%
24 X02 Odd 1Bhk 33.2599983215332 0 0 0
0%
27 X01 Even 2Bhk 48.06999969482422 0 0 0
0%
27 X01 Odd 2Bhk 51.630001068115234 0 0 0
0%
27 X02 Even 2Bhk 51.619998931884766 0 0 0
0%
27 X02 Odd 2Bhk 51.02000045776367 0 0 0
0%
27 X03 Even 2Bhk 49.560001373291016 0 0 0
0%
27 X03 Odd 2Bhk 49.41999816894531 0 0 0
0%
29 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
29 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
29 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
29 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
29 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
29 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
30 X01 Even 2Bhk 51.5099983215332 0 0 0
0%
30 X01 Odd 2Bhk 51.619998931884766 0 0 0
0%
30 X02 Even 1.5Bhk 45.130001068115234 0 0 0
0%
30 X02 Odd 1.5Bhk 44.630001068115234 0 0 0
0%
30 X03 Even 2Bhk 48.900001525878906 0 0 0
0%
30 X03 Odd 2Bhk 49.29999923706055 0 0 0
0%
30 X04 Even 2Bhk 45.959999084472656 0 0 0
0%
30 X04 Odd 2Bhk 46.349998474121094 0 0 0
0%
B 22 X01 Even 1 Bhk 33.40999984741211 0 0 0
0%
B 22 X01 Odd 1 Bhk 33.400001525878906 0 0 0
0%
B 22 X02 Even 2 Bhk 51.959999084472656 0 0 0
0%
B 22 X02 Odd 2 Bhk 51.720001220703125 0 0 0
0%
B X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B1 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B1 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B1 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B1 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
B1 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B1 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B10 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B10 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B10 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B10 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
B10 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B10 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B11 X01 Even 2Bhk 50.849998474121094 0 0 0
0%
B11 X01 Odd 2Bhk 51.33000183105469 0 0 0
0%
B11 X02 Even 1Bhk 33.66999816894531 0 0 0
0%
B11 X02 Odd 1Bhk 33.2599983215332 0 0 0
0%
B12 X01 Even 1Bhk 34.29999923706055 0 0 0
0%
B12 X01 Odd 1Bhk 34.11000061035156 0 0 0
0%
B12 X02 Even 1Bhk 33.40999984741211 0 0 0
0%
B12 X02 Odd 1Bhk 33.40999984741211 0 0 0
0%
B12 X03 Even 2Bhk 51.81999969482422 0 0 0
0%
B12 X03 Odd 2Bhk 52.150001525878906 0 0 0
0%
B14 X01 Even 1Bhk 33.66999816894531 0 0 0
0%
B14 X01 Odd 1Bhk 33.939998626708984 0 0 0
0%
B14 X02 Even 2Bhk 51.4900016784668 0 0 0
0%
B14 X02 Odd 1Bhk 33.40999984741211 0 0 0
0%
B14 X03 Odd 2Bhk 51.9900016784668 0 0 0
0%
B15 X01 Even 1Bhk 33.2400016784668 0 0 0
0%
B15 X01 Odd 1Bhk 33.08000183105469 0 0 0
0%
B15 X02 Even 1Bhk 33.810001373291016 0 0 0
0%
B15 X02 Odd 1Bhk 33.40999984741211 0 0 0
0%
B16 X01 Even 1Bhk 33.40999984741211 0 0 0
0%
B16 X01 Odd 1Bhk 33.400001525878906 0 0 0
0%
B16 X02 Even 2Bhk 51.959999084472656 0 0 0
0%
B16 X02 Odd 2Bhk 51.720001220703125 0 0 0
0%
B17 X01 Even 1Bhk 33.66999816894531 0 0 0
0%
B17 X01 Odd 1Bhk 33.939998626708984 0 0 0
0%
B17 X02 Even 2Bhk 51.4900016784668 0 0 0
0%
B17 X02 Odd 1Bhk 33.40999984741211 0 0 0
0%
B17 X03 Odd 2Bhk 51.9900016784668 0 0 0
0%
B18 X01 Even 1Bhk 32.77000045776367 0 0 0
0%
B18 X01 Odd 1Bhk 32.970001220703125 0 0 0
0%
B18 X02 Even 2Bhk 48.91999816894531 0 0 0
0%
B18 X02 Odd 2Bhk 49.58000183105469 0 0 0
0%
B18 X03 Even 2Bhk 51.29999923706055 0 0 0
0%
B18 X03 Odd 2Bhk 51.470001220703125 0 0 0
0%
B18 X04 Even 2Bhk 48.880001068115234 0 0 0
0%
B18 X04 Odd 2Bhk 48.45000076293945 0 0 0
0%
B2 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B2 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B2 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
B2 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B2 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B20 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B20 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B20 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B20 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
B20 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B20 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B21 X01 Even 1.5Bhk 45.45000076293945 0 0 0
0%
B21 X01 Odd 1.5Bhk 45.45000076293945 0 0 0
0%
B21 X02 Even 2Bhk 51.849998474121094 0 0 0
0%
B21 X02 Odd 2Bhk 51.849998474121094 0 0 0
0%
B21 X03 Even 1Bhk 33.68000030517578 0 0 0
0%
B21 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B28 X01 Even 1.5Bhk 45.27000045776367 0 0 0
0%
B28 X01 Odd 1.5Bhk 44.529998779296875 0 0 0
0%
B28 X02 Even 2Bhk 51.470001220703125 0 0 0
0%
B28 X02 Odd 2Bhk 51.25 0 0 0
0%
B28 X03 Even 1Bhk 33.40999984741211 0 0 0
0%
B28 X03 Odd 1Bhk 33.66999816894531 0 0 0
0%
B28 X04 Even 2Bhk 49.61000061035156 0 0 0
0%
B28 X04 Odd 2Bhk 50.130001068115234 0 0 0
0%
B3 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B3 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B3 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B3 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
B3 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B3 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B4 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B4 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B4 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B4 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
B4 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B4 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B6 X01 Even 2Bhk 51.5099983215332 0 0 0
0%
B6 X01 Odd 2Bhk 51.619998931884766 0 0 0
0%
B6 X02 Even 1.5Bhk 45.130001068115234 0 0 0
0%
B6 X02 Odd 1.5Bhk 44.630001068115234 0 0 0
0%
B6 X03 Even 2Bhk 48.900001525878906 0 0 0
0%
B6 X03 Odd 2Bhk 49.29999923706055 0 0 0
0%
B6 X04 Even 2Bhk 45.959999084472656 0 0 0
0%
B6 X04 Odd 2Bhk 46.349998474121094 0 0 0
0%
B7 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B7 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B7 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B7 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B7 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B7 Xo2 Odd 2Bhk 52.060001373291016 0 0 0
0%
B8 X01 Even 1.5Bhk 45.45000076293945 0 0 0
0%
B8 X01 Odd 1.5Bhk 45.45000076293945 0 0 0
0%
B8 X02 Even 2Bhk 51.849998474121094 0 0 0
0%
B8 X02 Odd 2Bhk 51.849998474121094 0 0 0
0%
B8 X03 Even 1Bhk 33.68000030517578 0 0 0
0%
B8 X03 Odd 1Bhk 33.40999984741211 0 0 0
0%
B9 X01 Even 1.5Bhk 45.380001068115234 0 0 0
0%
B9 X01 Odd 1.5Bhk 45.22999954223633 0 0 0
0%
B9 X02 Even 2Bhk 51.7400016784668 0 0 0
0%
B9 X02 Odd 2Bhk 52.060001373291016 0 0 0
0%
B9 X03 Even 1Bhk 33.59000015258789 0 0 0
0%
B9 Xo3 Odd 1Bhk 33.40999984741211 0 0 0
0%

Building No 1

Type Carpet (sq.ft) Total Booked Available Status
B1 X01 EVEN 1.5BHK 45.38 9 9 0
100%
B1 X01 ODD 1.5BHK 45.23 10 10 0
100%
B1 X02 EVEN 2BHK 51.74 27 27 0
100%
B1 X02 ODD 2BHK 52.06 30 30 0
100%
B1 X03 EVEN 1BHK 33.59 30 30 0
100%
B1 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 10

Type Carpet (sq.ft) Total Booked Available Status
B10 X01 EVEN 1.5BHK 45.38 9 9 0
100%
B10 X01 ODD 1.5BHK 45.23 10 9 1
90%
B10 X02 EVEN 2BHK 51.74 27 27 0
100%
B10 X02 ODD 2BHK 52.06 30 30 0
100%
B10 X03 EVEN 1BHK 33.59 30 30 0
100%
B10 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 11

Type Carpet (sq.ft) Total Booked Available Status
B11 X01 EVEN 2BHK 50.85 40 36 4
90%
B11 X01 ODD 2BHK 51.33 44 40 4
91%
B11 X02 EVEN 1BHK 33.67 16 14 2
88%
B11 X02 ODD 1BHK 33.26 22 20 2
91%

Building No 12

Type Carpet (sq.ft) Total Booked Available Status
B12 X01 EVEN 1BHK 34.3 20 20 0
100%
B12 X01 ODD 1BHK 34.11 22 20 2
91%
B12 X02 EVEN 1BHK 33.41 16 15 1
94%
B12 X02 ODD 1BHK 33.41 22 20 2
91%
B12 X03 EVEN 2BHK 51.82 20 19 1
95%
B12 X03 ODD 2BHK 52.15 22 20 2
91%

Building No 14

Type Carpet (sq.ft) Total Booked Available Status
B14 X01 EVEN 1BHK 33.67 48 45 3
94%
B14 X01 ODD 1BHK 33.94 20 20 0
100%
B14 X02 EVEN 2BHK 51.49 18 18 0
100%
B14 X02 ODD 1BHK 33.41 40 40 0
100%
B14 X03 ODD 2BHK 51.99 20 18 2
90%

Building No 15

Type Carpet (sq.ft) Total Booked Available Status
B15 X01 EVEN 1BHK 33.24 20 20 0
100%
B15 X01 ODD 1BHK 33.08 22 20 2
91%
B15 X02 EVEN 1BHK 33.81 36 36 0
100%
B15 X02 ODD 1BHK 33.41 44 39 5
89%

Building No 16

Type Carpet (sq.ft) Total Booked Available Status
B16 X01 EVEN 1BHK 33.41 36 35 1
97%
B16 X01 ODD 1BHK 33.4 40 40 0
100%
B16 X02 EVEN 2BHK 51.96 20 18 2
90%
B16 X02 ODD 2BHK 51.72 20 20 0
100%

Building No 17

Type Carpet (sq.ft) Total Booked Available Status
B17 X01 EVEN 1BHK 33.67 48 48 0
100%
B17 X01 ODD 1BHK 33.94 20 20 0
100%
B17 X02 EVEN 2BHK 51.49 18 18 0
100%
B17 X02 ODD 1BHK 33.41 40 37 3
92%
B17 X03 ODD 2BHK 51.99 20 20 0
100%

Building No 18

Type Carpet (sq.ft) Total Booked Available Status
B18 X01 EVEN 1BHK 32.77 20 20 0
100%
B18 X01 ODD 1BHK 32.97 22 20 2
91%
B18 X02 EVEN 2BHK 48.92 20 20 0
100%
B18 X02 ODD 2BHK 49.58 22 20 2
91%
B18 X03 EVEN 2BHK 51.3 20 20 0
100%
B18 X03 ODD 2BHK 51.47 22 20 2
91%
B18 X04 EVEN 2BHK 48.88 8 7 1
88%
B18 X04 ODD 2BHK 48.45 11 10 1
91%

Building No 2

Type Carpet (sq.ft) Total Booked Available Status
B X01 EVEN 1.5BHK 45.38 9 9 0
100%
B2 X01 ODD 1.5BHK 45.23 10 9 1
90%
B2 X02 EVEN 2BHK 51.74 27 27 0
100%
B2 X02 ODD 2BHK 52.06 30 30 0
100%
B2 X03 EVEN 1BHK 33.59 30 30 0
100%
B2 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 20

Type Carpet (sq.ft) Total Booked Available Status
B20 X01 EVEN 1.5BHK 45.38 9 9 0
100%
B20 X01 ODD 1.5BHK 45.23 10 9 1
90%
B20 X02 EVEN 2BHK 51.74 27 27 0
100%
B20 X02 ODD 2BHK 52.06 30 30 0
100%
B20 X03 EVEN 1BHK 33.59 30 29 1
97%
B20 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 21

Type Carpet (sq.ft) Total Booked Available Status
B21 X01 EVEN 1.5BHK 45.45 10 9 1
90%
B21 X01 ODD 1.5BHK 45.45 10 10 0
100%
B21 X02 EVEN 2BHK 51.85 10 9 1
90%
B21 X02 ODD 2BHK 51.85 10 10 0
100%
B21 X03 EVEN 1BHK 33.68 36 32 4
89%
B21 X03 ODD 1BHK 33.41 40 38 2
95%

Building No 22

Type Carpet (sq.ft) Total Booked Available Status
B 22 X01 EVEN 1 BHK 33.41 36 35 1
97%
B 22 X01 ODD 1 BHK 33.4 40 40 0
100%
B 22 X02 EVEN 2 BHK 51.96 20 18 2
90%
B 22 X02 ODD 2 BHK 51.72 20 20 0
100%

Building No 23

Type Carpet (sq.ft) Total Booked Available Status
23 X01 EVEN 1.5BHK 45.38 9 9 0
100%
23 X01 ODD 1.5BHK 45.23 10 10 0
100%
23 X02 EVEN 2BHK 51.74 27 26 1
96%
23 X02 ODD 2BHK 52.06 30 28 2
93%
23 X03 EVEN 1BHK 33.59 30 30 0
100%
23 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 24

Type Carpet (sq.ft) Total Booked Available Status
24 X01 EVEN 2BHK 50.85 40 36 4
90%
24 X01 ODD 2BHK 51.33 44 39 5
89%
24 X02 EVEN 1BHK 33.67 16 14 2
88%
24 X02 ODD 1BHK 33.26 22 20 2
91%

Building No 27

Type Carpet (sq.ft) Total Booked Available Status
27 X01 EVEN 2BHK 48.07 8 7 1
88%
27 X01 ODD 2BHK 51.63 11 10 1
91%
27 X02 EVEN 2BHK 51.62 20 19 1
95%
27 X02 ODD 2BHK 51.02 22 20 2
91%
27 X03 EVEN 2BHK 49.56 20 20 0
100%
27 X03 ODD 2BHK 49.42 22 20 2
91%

Building No 28

Type Carpet (sq.ft) Total Booked Available Status
B28 X01 EVEN 1.5BHK 45.27 10 9 1
90%
B28 X01 ODD 1.5BHK 44.53 10 9 1
90%
B28 X02 EVEN 2BHK 51.47 30 28 2
93%
B28 X02 ODD 2BHK 51.25 30 28 2
93%
B28 X03 EVEN 1BHK 33.41 16 14 2
88%
B28 X03 ODD 1BHK 33.67 20 17 3
85%
B28 X04 EVEN 2BHK 49.61 18 17 1
94%
B28 X04 ODD 2BHK 50.13 20 20 0
100%

Building No 29

Type Carpet (sq.ft) Total Booked Available Status
29 X01 EVEN 1.5BHK 45.38 9 9 0
100%
29 X01 ODD 1.5BHK 45.23 10 9 1
90%
29 X02 EVEN 2BHK 51.74 27 27 0
100%
29 X02 ODD 2BHK 52.06 30 29 1
97%
29 X03 EVEN 1BHK 33.59 30 30 0
100%
29 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 3

Type Carpet (sq.ft) Total Booked Available Status
B3 X01 EVEN 1.5BHK 45.38 9 9 0
100%
B3 X01 ODD 1.5BHK 45.23 10 9 1
90%
B3 X02 EVEN 2BHK 51.74 27 27 0
100%
B3 X02 ODD 2BHK 52.06 30 30 0
100%
B3 X03 EVEN 1BHK 33.59 30 30 0
100%
B3 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 30

Type Carpet (sq.ft) Total Booked Available Status
30 X01 EVEN 2BHK 51.51 30 30 0
100%
30 X01 ODD 2BHK 51.62 33 30 3
91%
30 X02 EVEN 1.5BHK 45.13 10 9 1
90%
30 X02 ODD 1.5BHK 44.63 11 10 1
91%
30 X03 EVEN 2BHK 48.9 20 20 0
100%
30 X03 ODD 2BHK 49.3 22 20 2
91%
30 X04 EVEN 2BHK 45.96 8 8 0
100%
30 X04 ODD 2BHK 46.35 11 10 1
91%

Building No 4

Type Carpet (sq.ft) Total Booked Available Status
B4 X01 EVEN 1.5BHK 45.38 9 9 0
100%
B4 X01 ODD 1.5BHK 45.23 10 10 0
100%
B4 X02 EVEN 2BHK 51.74 27 27 0
100%
B4 X02 ODD 2BHK 52.06 30 30 0
100%
B4 X03 EVEN 1BHK 33.59 30 30 0
100%
B4 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 6

Type Carpet (sq.ft) Total Booked Available Status
B6 X01 EVEN 2BHK 51.51 30 30 0
100%
B6 X01 ODD 2BHK 51.62 33 31 2
94%
B6 X02 EVEN 1.5BHK 45.13 10 10 0
100%
B6 X02 ODD 1.5BHK 44.63 11 11 0
100%
B6 X03 EVEN 2BHK 48.9 20 20 0
100%
B6 X03 ODD 2BHK 49.3 22 20 2
91%
B6 X04 EVEN 2BHK 45.96 8 8 0
100%
B6 X04 ODD 2BHK 46.35 11 10 1
91%

Building No 7

Type Carpet (sq.ft) Total Booked Available Status
B7 X01 EVEN 1.5BHK 45.38 9 9 0
100%
B7 X01 ODD 1.5BHK 45.23 10 9 1
90%
B7 X02 EVEN 2BHK 51.74 27 27 0
100%
B7 X03 EVEN 1BHK 33.59 30 30 0
100%
B7 X03 ODD 1BHK 33.41 40 40 0
100%
B7 XO2 ODD 2BHK 52.06 30 30 0
100%

Building No 8

Type Carpet (sq.ft) Total Booked Available Status
B8 X01 EVEN 1.5BHK 45.45 10 9 1
90%
B8 X01 ODD 1.5BHK 45.45 10 10 0
100%
B8 X02 EVEN 2BHK 51.85 10 10 0
100%
B8 X02 ODD 2BHK 51.85 10 10 0
100%
B8 X03 EVEN 1BHK 33.68 36 36 0
100%
B8 X03 ODD 1BHK 33.41 40 40 0
100%

Building No 9

Type Carpet (sq.ft) Total Booked Available Status
B9 X01 EVEN 1.5BHK 45.38 9 9 0
100%
B9 X01 ODD 1.5BHK 45.23 10 10 0
100%
B9 X02 EVEN 2BHK 51.74 27 27 0
100%
B9 X02 ODD 2BHK 52.06 30 30 0
100%
B9 X03 EVEN 1BHK 33.59 30 30 0
100%
B9 XO3 ODD 1BHK 33.41 40 40 0
100%

Construction Progress

Building No 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises88%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 11

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises72%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
Stilt Floor 100%

Building No 12

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises70%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Building No 14

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises81%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Building No 15

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises73%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Stilt Floor 100%

Building No 16

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises81%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Building No 17

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises81%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Building No 18

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises78%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Building No 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 20

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises77%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
Stilt Floor 100%

Building No 21

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises75%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
Stilt Floor 100%

Building No 22

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises77%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
Stilt Floor 100%

Building No 23

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.74%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises72%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
Stilt Floor 100%

Building No 24

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises70%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
Stilt Floor 100%

Building No 27

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.76%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises78%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
Stilt Floor 100%

Building No 28

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.76%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises78%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
Stilt Floor 100%

Building No 29

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.76%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises82%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor 100%

Building No 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 30

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.76%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises66%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor 100%

Building No 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises79%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises89%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises93%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 9

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises87%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 60%
Energy management 40%
Fire Protection And Fire Safety Requirements 60%
Landscaping & Tree Planting
Open Parking
Other facilities
Sewerage (Chamber, Lines, Septic Tank , STP) 75%
Solid Waste Management And Disposal 30%
Storm Water Drains 100%
Street Lighting 70%
Treatment And Disposal Of Sewage And Sullage Water 75%
Water Conservation, Rain water Harvesting
Water Supply 55%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.