Empire Industrial Centrum Phase - I

by Empire Industries Limited Company
Certificate SignedP51700006096
Empire Industrial Centrum Phase - IProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700006096
Registration No.
REA51700009592
Registration Date
2021-09-09
Developer
Empire Industries Limited Company
Architect
Prajacta Kambli
Project Bank
BANK OF BARODA
Proposed Possession
2024-12-30
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
5
Project Area
37368.05 sq.m
Total FSI
81088.67
Approved FSI
30641.80
MahaRERA QR
Empire Industrial Centrum Phase - I
MahaRERA โ€” P51700006096
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors15
โœ…Sanctioned15
๐Ÿ—๏ธProposed Floors4
โœ…Sanctioned4
๐Ÿ—๏ธProposed Floors4
โœ…Sanctioned4
๐Ÿ—๏ธProposed Floors15
โœ…Sanctioned15
๐Ÿ—๏ธProposed Floors15
โœ…Sanctioned15

Apartment Configurations

Dwarka E1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK42.39101
0%
2 BHK57.3651447
86%

Gupta A2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
MicL48.95862
75%
MicM48.56562333
41%
MicS45.85241212
50%
RegL98.91844
50%
RegM98.511064
60%
RegS95.8241311
54%

Pala A3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
MicL48.95734
43%
MicM48.5667562
7%
MicS45.8528226
7%
RegL98.91981
89%
RegM98.5114140
100%
RegS95.828217
75%

Takshashila F1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK43.6651429
82%
1RK24.54101
0%

Ujjain E2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK42.39101
0%
2 BHK57.36513813
75%

Construction Progress

DWARKA E1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

GUPTA A2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

PALA A3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

TAKSHASHILA F1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

UJJAIN E2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station5%
โฌœEnergy managemcnt
โœ…Fire protection and fire safety requirements5%
โœ…Internal Roads & Footpaths20%
โœ…Landscaping & Tree Planting20%
โœ…Open Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โฌœSolid Waste Management And Disposal
โœ…Storm Water Drains
โœ…Street Lighting15%
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting