📞 +91 98200 30685 ✉️
RERA: A51800043517

FENNEL D

by ROYALE URBANSPACE LLP Others
Certificate Signed P51700005481
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700005481
Registration No.
REA51700018782
Registration Date
2017-08-11
Developer
ROYALE URBANSPACE LLP Others
Architect
Triarch Design Studio
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
4
Project Area
660.74 sq.m
Total FSI
3294.70
Approved FSI
3294.70
MahaRERA QR
FENNEL D
MahaRERA — P51700005481
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
📅Completion1900-01-01
🏗️Proposed Floors5
Sanctioned5
📅Completion1900-01-01
🏗️Proposed Floors5
Sanctioned5
📅Completion1900-01-01
🏗️Proposed Floors5
Sanctioned5
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 33.599998474121094 0 0 0
0%
1 Rk 23.84000015258789 0 0 0
0%
1Bhk 33.599998474121094 0 0 0
0%
1Rk 23.84000015258789 0 0 0
0%

Fennel D1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.6 19 15 4
79%
1RK 23.84 1 0 1
0%

Fennel D2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.6 19 12 7
63%
1 RK 23.84 1 0 1
0%

Fennel D3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.6 19 13 6
68%
1RK 23.84 1 0 1
0%

Fennel D4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.6 19 13 6
68%
1 RK 23.84 1 0 1
0%

Construction Progress

FENNEL D1

Basement (if any)100%

Fennel D1

Excavation100%

FENNEL D1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fennel D1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FENNEL D1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fennel D1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FENNEL D1

Plinth100%
Podiums (if any) 0%

Fennel D1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FENNEL D1

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fennel D1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FENNEL D1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fennel D1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FENNEL D2

Basement (if any)100%

Fennel D2

Excavation100%

FENNEL D2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fennel D2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FENNEL D2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Fennel D2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

FENNEL D2

Plinth100%
Podiums (if any) 0%

Fennel D2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FENNEL D2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fennel D2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FENNEL D2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fennel D2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FENNEL D3

Basement (if any)100%

Fennel D3

Excavation100%

FENNEL D3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Fennel D3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

FENNEL D3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

Fennel D3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing75%

FENNEL D3

Plinth100%
Podiums (if any) 0%

Fennel D3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

FENNEL D3

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Fennel D3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

FENNEL D3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Fennel D3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

FENNEL D4

Basement (if any)100%

Fennel D4

Excavation100%

FENNEL D4

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Fennel D4

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

FENNEL D4

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

Fennel D4

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%

FENNEL D4

Plinth100%
Podiums (if any) 0%

Fennel D4

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%

FENNEL D4

Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%

Fennel D4

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%

FENNEL D4

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Fennel D4

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal
Storm Water Drains 10%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.