📞 +91 98200 30685 ✉️
RERA: A51800043517

Ganesh Pratima

by Home Makers Partnership
Certificate Signed P51700007373
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700007373
Registration No.
REA51700012533
Registration Date
2017-08-17
Developer
Home Makers Partnership
Architect
Shirish Nachne
Project Bank
KARNATAKA BANK LIMITED
Proposed Possession
2019-03-31
Revised Possession
2019-03-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
1470.00 sq.m
Total FSI
2821.47
Approved FSI
2821.47
MahaRERA QR
Ganesh Pratima
MahaRERA — P51700007373
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🚗Open Parking4
📅Completion2019-03-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking3
📅Completion2019-03-31
🏗️Proposed Floors7
Sanctioned7
📅Completion2019-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 21.850000381469727 0 0 0
0%
1Bhk 24.360000610351562 0 0 0
0%
1Bhk 24.600000381469727 0 0 0
0%
1Bhk 27.219999313354492 0 0 0
0%
1Bhk 28.940000534057617 0 0 0
0%
1Bhk 29.549999237060547 0 0 0
0%
1Bhk 29.600000381469727 0 0 0
0%
1Bhk 30.34000015258789 0 0 0
0%
1Bhk 30.350000381469727 0 0 0
0%
1Bhk 30.43000030517578 0 0 0
0%
1Bhk 30.850000381469727 0 0 0
0%
1Bhk 31.06999969482422 0 0 0
0%
1Bhk 32.779998779296875 0 0 0
0%
1Bhk 34.0 0 0 0
0%
1Bhk 34.27000045776367 0 0 0
0%
1Bhk 34.310001373291016 0 0 0
0%
1Bhk 39.06999969482422 0 0 0
0%
2Bhk 41.61000061035156 0 0 0
0%
2Bhk 45.9900016784668 0 0 0
0%
2Bhk 49.4900016784668 0 0 0
0%
Shop 1 28.399999618530273 0 0 0
0%
Shop 4 10.460000038146973 0 0 0
0%
Shop 5 15.6899995803833 0 0 0
0%
Shop 6 13.880000114440918 0 0 0
0%
Shop 7 10.0 0 0 0
0%
Shop 8 17.670000076293945 0 0 0
0%
Shop 9 20.0 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.22 7 7 0
100%
1 BHK 28.94 4 3 1
75%
2 BHK 49.49 4 2 2
50%
Shop 1 28.4 1 0 1
0%
Shop 4 10.46 1 0 1
0%
Shop 5 15.69 1 0 1
0%
Shop 6 13.88 1 1 0
100%
Shop 7 10.0 1 1 0
100%
Shop 8 17.67 1 0 1
0%
Shop 9 20.0 1 0 1
0%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.34 2 2 0
100%
1 BHK 30.35 6 6 0
100%
1 BHK 30.43 5 5 0
100%
1 BHK 30.85 6 6 0
100%
1 BHK 31.07 5 5 0
100%
1 BHK 32.78 1 1 0
100%
2 BHK 41.61 1 1 0
100%
2 BHK 45.99 1 0 1
0%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 21.85 1 1 0
100%
1 BHK 24.36 1 1 0
100%
1 BHK 24.6 1 1 0
100%
1 BHK 29.55 2 2 0
100%
1 BHK 29.6 2 2 0
100%
1 BHK 34.0 1 1 0
100%
1 BHK 34.27 5 5 0
100%
1 BHK 34.31 5 5 0
100%
1 BHK 39.07 1 1 0
100%

Construction Progress

Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.