📞 +91 98200 30685 ✉️
RERA: A51800043517

GOLDEN VALLEY

by A PLUS REALTY Partnership
Certificate Signed P51700002661
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700002661
Registration No.
REA51700008042
Registration Date
2021-09-09
Developer
A PLUS REALTY Partnership
Architect
Destination Architecture Interior Designs
Project Bank
AXIS BANK
Proposed Possession
2023-02-03
Revised Possession
2023-02-03
Extended Possession
1900-01-01
Units Sold
0
Buildings
7
Project Area
10248.00 sq.m
Total FSI
13947.18
Approved FSI
13947.18
MahaRERA QR
GOLDEN VALLEY
MahaRERA — P51700002661
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors11
Sanctioned11
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors11
Sanctioned11
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 22.399999618530273 0 0 0
0%
1Bhk 22.440000534057617 0 0 0
0%
1Bhk 22.829999923706055 0 0 0
0%
1Bhk 22.860000610351562 0 0 0
0%
1Bhk 23.25 0 0 0
0%
1Bhk 23.3700008392334 0 0 0
0%
1Bhk 23.579999923706055 0 0 0
0%
1Bhk 24.010000228881836 0 0 0
0%
1Bhk 24.030000686645508 0 0 0
0%
1Bhk 24.31999969482422 0 0 0
0%
1Bhk 24.440000534057617 0 0 0
0%
1Bhk 24.809999465942383 0 0 0
0%
1Bhk 24.81999969482422 0 0 0
0%
1Bhk 24.93000030517578 0 0 0
0%
1Bhk 25.040000915527344 0 0 0
0%
1Bhk 25.229999542236328 0 0 0
0%
1Bhk 25.239999771118164 0 0 0
0%
1Bhk 25.260000228881836 0 0 0
0%
1Bhk 25.3799991607666 0 0 0
0%
1Bhk 25.5 0 0 0
0%
1Bhk 25.579999923706055 0 0 0
0%
1Bhk 25.8700008392334 0 0 0
0%
1Bhk 25.899999618530273 0 0 0
0%
1Bhk 25.969999313354492 0 0 0
0%
1Bhk 26.059999465942383 0 0 0
0%
1Bhk 26.56999969482422 0 0 0
0%
1Bhk 26.75 0 0 0
0%
1Bhk 26.770000457763672 0 0 0
0%
1Bhk 26.81999969482422 0 0 0
0%
1Bhk 26.8700008392334 0 0 0
0%
1Bhk 26.889999389648438 0 0 0
0%
1Bhk 27.0 0 0 0
0%
1Bhk 27.18000030517578 0 0 0
0%
1Bhk 27.209999084472656 0 0 0
0%
1Bhk 27.360000610351562 0 0 0
0%
1Bhk 27.3700008392334 0 0 0
0%
1Bhk 27.43000030517578 0 0 0
0%
1Bhk 27.530000686645508 0 0 0
0%
1Bhk 27.600000381469727 0 0 0
0%
1Bhk 27.829999923706055 0 0 0
0%
1Bhk 28.059999465942383 0 0 0
0%
1Bhk 28.100000381469727 0 0 0
0%
1Bhk 29.1200008392334 0 0 0
0%
1Bhk 30.170000076293945 0 0 0
0%
1Bhk 31.329999923706055 0 0 0
0%
1Bhk 33.2599983215332 0 0 0
0%
1Bhk 34.15999984741211 0 0 0
0%
1Rk 17.18000030517578 0 0 0
0%
1Rk 17.5 0 0 0
0%
1Rk 17.6200008392334 0 0 0
0%
1Rk 17.84000015258789 0 0 0
0%
1Rk 17.969999313354492 0 0 0
0%
1Rk 18.079999923706055 0 0 0
0%
1Rk 18.110000610351562 0 0 0
0%
1Rk 18.1299991607666 0 0 0
0%
1Rk 18.18000030517578 0 0 0
0%
1Rk 18.209999084472656 0 0 0
0%
1Rk 18.360000610351562 0 0 0
0%
1Rk 18.399999618530273 0 0 0
0%
1Rk 18.420000076293945 0 0 0
0%
1Rk 18.59000015258789 0 0 0
0%
1Rk 18.709999084472656 0 0 0
0%
1Rk 18.780000686645508 0 0 0
0%
1Rk 18.84000015258789 0 0 0
0%
1Rk 18.860000610351562 0 0 0
0%
1Rk 18.8799991607666 0 0 0
0%
1Rk 18.899999618530273 0 0 0
0%
1Rk 19.170000076293945 0 0 0
0%
1Rk 19.420000076293945 0 0 0
0%
1Rk 19.43000030517578 0 0 0
0%
1Rk 19.450000762939453 0 0 0
0%
1Rk 19.520000457763672 0 0 0
0%
1Rk 19.540000915527344 0 0 0
0%
1Rk 19.549999237060547 0 0 0
0%
1Rk 19.719999313354492 0 0 0
0%
1Rk 19.889999389648438 0 0 0
0%
1Rk 20.260000228881836 0 0 0
0%
1Rk 20.5 0 0 0
0%
1Rk 20.6200008392334 0 0 0
0%
1Rk 20.780000686645508 0 0 0
0%
1Rk 22.360000610351562 0 0 0
0%
1Rk 26.510000228881836 0 0 0
0%
2Bhk 34.70000076293945 0 0 0
0%
2Bhk 34.77000045776367 0 0 0
0%
2Bhk 35.0099983215332 0 0 0
0%
2Bhk 35.099998474121094 0 0 0
0%
2Bhk 35.72999954223633 0 0 0
0%
Shop 10.869999885559082 0 0 0
0%
Shop 11.399999618530273 0 0 0
0%
Shop 12.300000190734863 0 0 0
0%
Shop 13.989999771118164 0 0 0
0%
Shop 14.260000228881836 0 0 0
0%
Shop 14.760000228881836 0 0 0
0%
Shop 18.93000030517578 0 0 0
0%
Shop 20.760000228881836 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 23.37 2 2 0
100%
1 BHK 24.01 2 1 1
50%
1 BHK 25.38 2 2 0
100%
1 BHK 27.18 2 0 2
0%
1 BHK 28.06 2 1 1
50%
1 BHK 28.1 2 2 0
100%
1 BHK 29.12 2 1 1
50%
1 BHK 33.26 2 2 0
100%
1 BHK 34.16 2 1 1
50%
1RK 17.18 2 2 0
100%
1RK 18.4 2 2 0
100%
1RK 18.84 2 2 0
100%
1RK 20.62 2 2 0
100%
1RK 22.36 2 2 0
100%
SHOP 11.4 2 0 2
0%
SHOP 12.3 1 0 1
0%
SHOP 13.99 1 0 1
0%
SHOP 14.26 1 0 1
0%
SHOP 14.76 2 0 2
0%
SHOP 20.76 1 0 1
0%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.5 4 4 0
100%
1 BHK 26.06 2 1 1
50%
1 BHK 27.0 2 2 0
100%
1RK 17.5 4 4 0
100%
1RK 18.9 4 4 0
100%
1RK 19.45 2 1 1
50%
1RK 19.52 2 2 0
100%
SHOP 10.87 2 0 2
0%
SHOP 13.99 2 2 0
100%
SHOP 18.93 1 0 1
0%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 22.4 4 4 0
100%
1 BHK 22.44 2 1 1
50%
1 BHK 25.9 2 1 1
50%
1 BHK 27.43 2 2 0
100%
1 BHK 27.6 2 2 0
100%
1 BHK 30.17 4 3 1
75%
1 BHK 31.33 2 1 1
50%
1RK 18.18 4 3 1
75%
1RK 18.42 4 4 0
100%
1RK 18.86 2 2 0
100%
1RK 20.78 2 2 0
100%
1RK 26.51 2 2 0
100%

D Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 24.93 6 5 1
83%
1 BHK 25.04 3 3 0
100%
1 BHK 25.26 3 3 0
100%
1 BHK 25.38 4 4 0
100%
1 BHK 25.58 8 7 1
88%
1 BHK 27.37 8 6 2
75%
1 BHK 27.83 3 3 0
100%
2 BHK 34.7 4 3 1
75%
2 BHK 35.01 7 6 1
86%
2 BHK 35.1 7 7 0
100%
2 BHK 35.73 3 3 0
100%

E Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 22.83 3 2 1
67%
1 BHK 23.58 3 3 0
100%
1 BHK 24.03 12 8 4
67%
1 BHK 24.82 3 3 0
100%
1 BHK 25.24 4 3 1
75%
1 BHK 25.97 4 4 0
100%
1 BHK 26.82 16 14 2
88%
1 BHK 27.21 4 4 0
100%
1RK 18.08 4 4 0
100%
1RK 18.21 8 8 0
100%
1RK 18.36 8 7 1
88%
1RK 19.54 3 2 1
67%
1RK 19.72 3 2 1
67%
1RK 19.89 3 3 0
100%
1RK 20.5 6 6 0
100%

F Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 22.86 4 4 0
100%
1 BHK 23.25 4 4 0
100%
1 BHK 24.32 12 12 0
100%
1 BHK 24.44 4 3 1
75%
1 BHK 25.87 5 5 0
100%
1 BHK 26.57 5 5 0
100%
1 BHK 26.75 5 4 1
80%
1 BHK 26.77 10 9 1
90%
1 BHK 26.87 5 5 0
100%
1RK 17.62 5 5 0
100%
1RK 17.84 5 4 1
80%
1RK 17.97 5 5 0
100%
1RK 18.11 5 5 0
100%
1RK 18.13 5 5 0
100%
1RK 18.59 5 5 0
100%
1RK 18.71 4 4 0
100%
1RK 18.78 5 5 0
100%
1RK 18.88 8 8 0
100%
1RK 19.17 4 3 1
75%
1RK 19.42 4 4 0
100%
1RK 19.43 4 4 0
100%
1RK 19.55 4 4 0
100%
1RK 20.26 4 4 0
100%

G Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 24.81 4 4 0
100%
1 BHK 25.23 8 7 1
88%
1 BHK 26.89 10 8 2
80%
1 BHK 27.36 10 6 4
60%
1 BHK 27.53 4 4 0
100%
2 BHK 34.77 36 24 12
67%

Construction Progress

A WING

Basement (if any)100%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing56%

A WING

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B WING

Basement (if any)100%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing51%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure60%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

B Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure60%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Overall Percentage of Completion of the work done For the entire Building /Wing55%

C WING

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D WING

Basement (if any)100%

D Wing

Excavation100%

D WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

D Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

D Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing72%

D WING

Plinth100%
Podiums (if any) 0%

D Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%

D WING

Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%

D Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

D WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

D Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

E WING

Basement (if any)100%

E Wing

Excavation100%

E WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

E Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

E WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

E Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing72%

E WING

Plinth100%
Podiums (if any) 0%

E Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%

E WING

Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%

E Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

E WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

E Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

F WING

Basement (if any)100%

F Wing

Excavation100%

F WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

F Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

F WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%

F Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises70%
Overall Percentage of Completion of the work done For the entire Building /Wing57%

F WING

Plinth100%
Podiums (if any) 0%

F Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

F WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

F Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

F WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

F Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

G WING

Basement (if any)100%

G Wing

Excavation100%

G WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

G Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

G WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%

G Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises70%
Overall Percentage of Completion of the work done For the entire Building /Wing57%

G WING

Plinth100%
Podiums (if any) 0%

G Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

G WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

G Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

G WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

G Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electric Meter Room Sub Station Receiving Room 10%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 10%
Solid Waste Management And Disposal
Storm Water Drains 10%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.