HARBANS PARK PHASE 3Project photos will appear here when available.
Project Information
RERA Certificate No.
PR1190002501795
Registration No.
PR1190002501795
Registration Date
2025-12-15
Developer
HARBANS CREATION (AOP) AOP/BOI
Proposed Possession
2028-04-30
Revised Possession
2027-12-31
Total Units
27
Units Sold
9 (33%)
Buildings
27
Project Area
4536.60 sq.m
HARBANS PARK PHASE 3 MahaRERA โ PR1190002501795
Scan to verify on MahaRERA portal
Wing-wise Details
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
๐๏ธProposed Floors3
โ Sanctioned3
๐ Habitable3
๐ขTotal
Units1
๐กResidential1
Construction Progress
HARBANS PARK PHASE 3 A-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
HARBANS PARK PHASE 3 A-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 A-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 A-4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 A-5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 A-6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 A-7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 A-8
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 A-9
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-8
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 B-9
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-8
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
HARBANS PARK PHASE 3 C-9
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor0%
RERA Registered Amenities
โฌAggregate area of recreational Open Space
โฌCommunity Buildings
โ Electrical meter room, sub-station, receiving station
โฌEnergy managemcnt
โฌFire protection and fire safety requirements
โฌInternal Roads & Footpaths
โฌLandscaping & Tree Planting
โ Open Parking
โ Sewerage (Chamber, Lines, Septic Tank , STP)100%
โฌSolid Waste Management And Disposal
โฌStorm Water Drains
โฌStreet Lighting
โ Treatment And Disposal Of Sewage And Sullage Water100%