📞 +91 98200 30685✉️
RERA: A51800043517

Hiranandani Westgate Phase 1

by SHODEN DEVELOPERS PRIVATE LIMITED Company
Certificate SignedP51700077268

Project Information

RERA Certificate No.
P51700077268
Registration No.
REA51700163990
Registration Date
2024-08-02
Developer
SHODEN DEVELOPERS PRIVATE LIMITED Company
Architect
Sharmistha
Project Bank
STATE BANK OF INDIA
Proposed Possession
2031-10-31
Total Units
1844
Units Sold
676 (37%)
Project Area
5242.95 sq.m
Total FSI
210100.21
Approved FSI
210100.21
MahaRERA QR
Hiranandani Westgate Phase 1
MahaRERA — P51700077268
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors51
Sanctioned51
🏠Habitable47
🔢Total Units356
🏡Residential356
⬇️Basements2
🅿️Closed Parking373
📅Completion2031-10-31
🏗️Proposed Floors55
Sanctioned55
🏠Habitable51
🔢Total Units282
🏡Residential282
⬇️Basements2
🅿️Closed Parking589
📅Completion2031-10-31
🏗️Proposed Floors55
Sanctioned55
🏠Habitable51
🔢Total Units282
🏡Residential282
⬇️Basements2
🅿️Closed Parking589
📅Completion2031-10-31
🏗️Proposed Floors51
Sanctioned51
🏠Habitable47
🔢Total Units356
🏡Residential356
⬇️Basements2
🅿️Closed Parking365
📅Completion2031-10-31
🏗️Proposed Floors51
Sanctioned51
🏠Habitable47
🔢Total Units356
🏡Residential356
⬇️Basements2
🅿️Closed Parking365
📅Completion2031-10-31
🏗️Proposed Floors59
Sanctioned59
🏠Habitable55
🔢Total Units212
🏡Residential212
⬇️Basements2
🅿️Closed Parking657
📅Completion2031-10-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 Bhk Classic44.900001525878906000
0%
2 Bhk Grand67.62000274658203000
0%
2 Bhk Grand67.68000030517578000
0%
2 Bhk Luxury60.54999923706055000
0%
2 Bhk Luxury A59.060001373291016000
0%
2 Bhk Luxury B60.54999923706055000
0%
3 Bhk Classic A88.19000244140625000
0%
3 Bhk Classic B88.4000015258789000
0%
3 Bhk Classic C88.66000366210938000
0%
3 Bhk Classic D88.69999694824219000
0%
3 Bhk Classic E91.0999984741211000
0%
3 Bhk Grand A111.16000366210938000
0%
3 Bhk Grand B111.76000213623047000
0%
3 Bhk Luxury A94.5199966430664000
0%
3 Bhk Luxury B94.98999786376953000
0%
3 Bhk Smart66.26000213623047000
0%
4 Bhk Grand154.44000244140625000
0%
4 Bhk Luxury142.6199951171875000
0%
4 Bhk Study A141.0800018310547000
0%
4 Bhk Study B141.67999267578125000
0%
4 Bhk Study C141.75999450683594000
0%

Amalfi

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK Grand67.68486086
0%
2 BHK Luxury A59.0678078
0%
2 BHK Luxury B60.5531840184
0%
3 BHK Classic E91.1808
0%

Belvedere A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK Classic A88.185808
0%
3 BHK Classic B88.422319
14%
3 BHK Classic C88.66118612
33%
3 BHK Classic D88.70432428
12%
3 BHK Grand A111.163331023
30%
3 BHK Grand B111.764642638
41%
3 BHK Luxury A94.515301020
33%
3 BHK Luxury B94.985641351
20%
4 BHK Study A141.081422
50%
4 BHK Study B141.675303
0%
4 BHK Study C141.762404
0%

Belvedere B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK Classic A88.185808
0%
3 BHK Classic B88.422022
0%
3 BHK Classic C88.66118117
6%
3 BHK Classic D88.70432329
9%
3 BHK Grand A111.16333924
27%
3 BHK Grand B111.764642341
36%
3 BHK Luxury A94.515301218
40%
3 BHK Luxury B94.985641153
17%
4 BHK Study A141.081413
25%
4 BHK Study B141.675303
0%
4 BHK Study C141.762404
0%

Florencia A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK Classic44.9802456
30%
2 BHK Grand67.62864046
47%
2 BHK Luxury60.5518444140
24%
3 BHK Smart66.26606
0%

Florencia B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK Classic44.9782058
26%
2 BHK Grand67.62865531
64%
2 BHK Luxury60.5518452132
28%
3 BHK Smart66.26817
12%

Somerset

TypeCarpet (sq.ft)TotalBookedAvailableStatus
4 BHK Grand154.441104169
37%
4 BHK Luxury142.621022280
22%

Construction Progress

Amalfi

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Belvedere A

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Belvedere B

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Florencia A

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing1%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Florencia B

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing1%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Somerset

Basement (if any)0%
Excavation75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Club House
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.