01
Possession Timeline
Proposed
Jun 2019
Revised
Jun 2019
Status
Ongoing
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
2 BHK708–711 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P52000005562
Registered
2022-08-12
Litigation
No reported in source
Escrow Bank
STATE BANK OF INDIA
Architect
Agharkar Consulting Engineers Pvt Ltd
Total FSI
4676
04
Buildings · 2 Wing(s)
Indraprashth Building 18 floors · 58 units
Indraprashth Building 28 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Dasturi Naka
18.085079700000000,73.418562700000000
18.085079700000000,73.418562700000000
▸ Explore map & Street View — for verified buyers
09
Construction Progress
54% avgBasement (if any)100%
Excavation100%
Plinth100%
Slabs of Super Structure100%
Stilt Floor 100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Sanitary Fittings within the flats / premises50%
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Treatment And Disposal Of Sewage And Sullage WaterWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory15
MahaRERA projects nearby in Dasturi Naka
?
Frequently Asked Questions
When is possession of Indraprashth?
As per MahaRERA, proposed possession is Jun 2019, revised to Jun 2019.
Is Indraprashth RERA-registered?
Yes — MahaRERA registration P52000005562, registered 2022-08-12. The current MahaRERA source record reports no litigations.
Who is the developer?
Suresh LILADHAR Toprani
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.