RERA: A51800043517

Irasa Greens

by SUBURBAN SPACES LLP Partnership
Certificate Signed P51700005934
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700005934
Registration No.
REA51700011443
Registration Date
2021-09-10
Developer
SUBURBAN SPACES LLP Partnership
Project Bank
IDBI BANK
Proposed Possession
2023-12-30
Revised Possession
2023-12-30
Extended Possession
2025-12-30
Units Sold
0
Buildings
4
Project Area
9300.00 sq.m
Total FSI
6979.14
Approved FSI
6979.14
MahaRERA QR
Irasa Greens
MahaRERA — P51700005934
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
🚗Open Parking20
📅Completion2023-12-30
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking17
📅Completion2023-12-30
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking17
📅Completion2022-12-31
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking21
📅Completion2023-12-30

Apartment Configurations

1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 18 4 14
22%
1 BHK 33.13 19 0 19
0%
1RK 26.24 2 0 2
0%

2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 18 0 18
0%
1 BHK 33.13 20 0 20
0%
1RK 26.24 2 0 2
0%

3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.61 18 10 8
56%
1 BHK 33.13 20 5 15
25%
1RK 16.73 1 0 1
0%
1RK 19.83 1 0 1
0%
1RK 20.34 9 0 9
0%
1RK 23.3 9 1 8
11%
1RK 26.24 2 0 2
0%

4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.28 9 0 9
0%
1 BHK 29.47 5 0 5
0%
1 BHK 33.13 8 0 8
0%
1RK 16.93 1 0 1
0%
1RK 20.34 4 0 4
0%
1RK 24.22 8 0 8
0%
1RK 25.85 1 0 1
0%
SHOP 5.97 4 0 4
0%
SHOP 8.81 1 0 1
0%
SHOP 10.4 1 0 1
0%
SHOP 16.32 1 0 1
0%
SHOP 17.19 2 0 2
0%
SHOP 17.2 2 0 2
0%

Construction Progress

1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

2

Basement (if any)0%
Excavation50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises6%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

4

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 80%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.