KANAKIA VALLEY

by KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIMITED Company
Certificate SignedPR1271012600320
KANAKIA VALLEYProject photos will appear here when available.

Project Information

RERA Certificate No.
PR1271012600320
Registration No.
PR1271012600320
Registration Date
2026-04-30
Developer
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIMITED Company
Proposed Possession
2031-04-30
Revised Possession
2030-12-31
Total Units
500
Units Sold
0 (0%)
Buildings
2
Project Area
34868.16 sq.m
MahaRERA QR
KANAKIA VALLEY
MahaRERA โ€” PR1271012600320
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors34
โœ…Sanctioned34
๐Ÿ Habitable33
๐Ÿ”ขTotal Units250
๐ŸกResidential250
๐Ÿ—๏ธProposed Floors34
โœ…Sanctioned34
๐Ÿ Habitable33
๐Ÿ”ขTotal Units250
๐ŸกResidential250

Construction Progress

TOWER - 01

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

TOWER - 02

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space
โœ…Community Buildings
โœ…Electrical meter room, sub-station, receiving station
โœ…Energy managemcnt
โœ…Fire protection and fire safety requirements
โœ…Internal Roads & Footpaths
โœ…Landscaping & Tree Planting
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains
โœ…Street Lighting
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting