📞 +91 98200 30685 ✉️
RERA: A51800043517

Kinjal Pride

by Hi Rock Construction Pvt Ltd Company
Certificate Signed P51900052854
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900052854
Registration No.
REA51900145964
Registration Date
2024-03-22
Developer
Hi Rock Construction Pvt Ltd Company
Project Bank
BANK OF MAHARASHTRA
Proposed Possession
2026-10-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
74
Units Sold
23 (31%)
Buildings
1
Project Area
576.09 sq.m
Total FSI
3648.65
Approved FSI
3648.65
MahaRERA QR
Kinjal Pride
MahaRERA — P51900052854
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors29
Sanctioned29
🏠Habitable23
🔢Total Units74
🏡Residential69
🏢Non-Residential5
⬇️Basements1
🅿️Closed Parking20
📅Completion2026-10-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 0 0 0
0%
2 Bhk Rehab 41.22999954223633 0 0 0
0%
2 Bhk Rehab 41.349998474121094 0 0 0
0%
2 Bhk Rehab 41.45000076293945 0 0 0
0%
2Bhk 41.54999923706055 0 0 0
0%
2Bhk 63.060001373291016 0 0 0
0%
2Bhk 63.189998626708984 0 0 0
0%
2Bhk Rehab 41.56999969482422 0 0 0
0%
2Bhk Rehab 52.15999984741211 0 0 0
0%
2Bhk Rehab 53.040000915527344 0 0 0
0%
2Bhk Rehab 53.16999816894531 0 0 0
0%
Shop Rehab 24.68000030517578 0 0 0
0%
Shop Rehab 44.97999954223633 0 0 0
0%
Shop Rehab 45.2599983215332 0 0 0
0%
Shop Rehab 46.93000030517578 0 0 0
0%
Shop Rehab 47.0099983215332 0 0 0
0%

Kinjal Pride

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 0 0 0
0%
2 BHK 58.79 8 7 1
88%
2 BHK 58.92 8 6 2
75%
2 BHK REHAB 41.23 13 0 13
0%
2 BHK REHAB 41.35 13 0 13
0%
2 BHK REHAB 41.45 3 0 3
0%
2 BHK REHAB 41.55 1 0 1
0%
2 BHK REHAB 41.57 3 0 3
0%
2 BHK REHAB 49.99 1 0 1
0%
2 BHK REHAB 50.11 1 0 1
0%
2 BHK REHAB 52.16 1 0 1
0%
2 BHK REHAB 53.04 3 0 3
0%
2 BHK REHAB 53.17 3 0 3
0%
Shop 16.25 1 0 1
0%
SHOP REHAB 24.21 1 0 1
0%
SHOP REHAB 46.33 1 0 1
0%
SHOP REHAB 46.48 1 0 1
0%
SHOP REHAB 47.0 1 0 1
0%
SHOP REHAB 49.65 1 0 1
0%

Construction Progress

KINJAL PRIDE

Basement (if any)100%

Kinjal Pride

Excavation100%

KINJAL PRIDE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Kinjal Pride

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

KINJAL PRIDE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Kinjal Pride

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing30%

KINJAL PRIDE

Plinth100%
Podiums (if any) 0%

Kinjal Pride

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

KINJAL PRIDE

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure18%

Kinjal Pride

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

KINJAL PRIDE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Kinjal Pride

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

KINJAL PRIDE 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.