MAKWANA RESIDENCYProject photos will appear here when available.
Project Information
RERA Certificate No.
PR1240002601023
Registration No.
PR1240002601023
Registration Date
2026-07-03
Developer
JITENDRA PRABHUDAS MAKWANA Individual
Proposed Possession
2031-04-30
Revised Possession
2030-12-31
Total Units
170
Units Sold
0 (0%)
Buildings
1
Project Area
20055.46 sq.m
MAKWANA RESIDENCY MahaRERA โ PR1240002601023
Scan to verify on MahaRERA portal
Wing-wise Details
๐๏ธProposed Floors8
โ Sanctioned8
๐ Habitable8
๐ขTotal
Units69
๐กResidential56
๐ขNon-Residential13
๐๏ธProposed Floors8
โ Sanctioned8
๐ Habitable8
๐ขTotal
Units68
๐กResidential56
๐ขNon-Residential12
๐๏ธProposed Floors8
โ Sanctioned8
๐ Habitable8
๐ขTotal
Units33
๐กResidential28
๐ขNon-Residential5
Construction Progress
MAKWANA RESIDENCY - A WING, B WING & C WING - A Wi
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MAKWANA RESIDENCY - A WING, B WING & C WING - B Wi
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
MAKWANA RESIDENCY - A WING, B WING & C WING - C Wi
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
โฌAggregate area of recreational Open Space
โฌCommunity Buildings
โ Electrical meter room, sub-station, receiving station
โ Energy managemcnt
โ Fire protection and fire safety requirements
โ Internal Roads & Footpaths
โ Landscaping & Tree Planting
โฌOpen Parking
โ Sewerage (Chamber, Lines, Septic Tank , STP)
โ Solid Waste Management And Disposal
โ Storm Water Drains
โ Street Lighting
โ Treatment And Disposal Of Sewage And Sullage Water