RERA: A51800043517

MANGESHI DAZZLE - III

by KALYAN DEVELOPMENT CORPORATION Partnership
Certificate Signed P51700005137
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700005137
Registration No.
REA51700009844
Registration Date
2017-08-09
Developer
KALYAN DEVELOPMENT CORPORATION Partnership
Architect
Rachna Shilp
Project Bank
THE THANE BHARAT SAHAKARI BANK LIMITED
Proposed Possession
2019-03-31
Revised Possession
2019-03-31
Extended Possession
2020-09-30
Units Sold
0
Buildings
7
Project Area
12800.00 sq.m
Total FSI
32000.00
Approved FSI
21117.44
MahaRERA QR
MANGESHI DAZZLE - III
MahaRERA — P51700005137
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
Sanctioned14
🚗Open Parking18
🅿️Closed Parking21
📅Completion2019-03-31
🏗️Proposed Floors15
Sanctioned15
🚗Open Parking13
🅿️Closed Parking13
📅Completion2019-03-31
🏗️Proposed Floors2
Sanctioned2
📅Completion2019-03-31
🏗️Proposed Floors14
Sanctioned14
🚗Open Parking13
🅿️Closed Parking21
📅Completion2019-03-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2020-09-30
🏗️Proposed Floors14
Sanctioned14
🚗Open Parking13
🅿️Closed Parking21
📅Completion2019-03-31
🏗️Proposed Floors14
Sanctioned14
🚗Open Parking19
🅿️Closed Parking21
📅Completion2019-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk Type I 39.29999923706055 0 0 0
0%
1 Bhk Type I 46.11000061035156 0 0 0
0%
1 Bhk Type Ii 46.380001068115234 0 0 0
0%
1 Bhk Type Iii 46.810001373291016 0 0 0
0%
1 Bhk Type Iv 50.75 0 0 0
0%
1 Bhk Type V 51.560001373291016 0 0 0
0%
2 Bhk Type I 58.56999969482422 0 0 0
0%
2 Bhk Type I 58.81999969482422 0 0 0
0%
2 Bhk Type I 65.80999755859375 0 0 0
0%
2 Bhk Type Ii 59.380001068115234 0 0 0
0%
2 Bhk Type Ii 66.58000183105469 0 0 0
0%
2 Bhk Type Iii 60.400001525878906 0 0 0
0%
2 Bhk Type Iii 66.6500015258789 0 0 0
0%
2 Bhk Type Iv 66.87999725341797 0 0 0
0%
2 Bhk Type V 64.6500015258789 0 0 0
0%
2 Bhk Type V 67.6500015258789 0 0 0
0%
3 Bhk Type I 69.20999908447266 0 0 0
0%
3 Bhk Type I 70.8499984741211 0 0 0
0%
3 Bhk Type I 79.94999694824219 0 0 0
0%
3 Bhk Type Ii 71.63999938964844 0 0 0
0%
3 Bhk Type Ii 80.72000122070312 0 0 0
0%
Bunglow 193.47999572753906 0 0 0
0%
Gym 63.060001373291016 0 0 0
0%
Shop I 21.09000015258789 0 0 0
0%
Shop Ii 11.539999961853027 0 0 0
0%
Shop Iii 16.030000686645508 0 0 0
0%
Shop Iv 12.59000015258789 0 0 0
0%

Mangeshi Dazze - Iii Wing E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE I 46.11 12 12 0
100%
1 BHK TYPE II 46.38 12 12 0
100%
2 BHK TYPE I 65.81 12 12 0
100%
2 BHK TYPE II 66.58 7 7 0
100%
2 BHK TYPE III 66.65 5 5 0
100%
2 BHK TYPE IV 66.88 2 2 0
100%
2 BHK TYPE V 64.65 2 2 0
100%
3 BHK TYPE I 79.95 10 10 0
100%
3 BHK TYPE II 80.72 10 10 0
100%

Mangeshi Dazzle - Iii - Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE I 39.3 26 23 3
88%
1 BHK TYPE II 46.38 1 1 0
100%
1 BHK TYPE III 46.81 1 1 0
100%
1 BHK TYPE IV 50.75 1 1 0
100%
1 BHK TYPE V 51.56 1 1 0
100%
2 BHK TYPE I 58.82 24 23 1
96%
2 BHK TYPE II 59.38 3 3 0
100%
2 BHK TYPE III 60.4 3 3 0
100%
3 BHK TYPE I 70.85 9 6 3
67%
3 BHK TYPE II 71.64 9 6 3
67%
GYM 63.06 1 0 1
0%
SHOP I 21.09 1 0 1
0%
SHOP II 11.54 1 1 0
100%
SHOP III 16.03 1 1 0
100%
SHOP IV 12.59 1 1 0
100%

Mangeshi Dazzle - Iii - Wing B

Type Carpet (sq.ft) Total Booked Available Status
BUNGLOW 193.48 1 0 1
0%

Mangeshi Dazzle - Iii Wing F

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE I 46.11 12 12 0
100%
1 BHK TYPE II 46.38 12 12 0
100%
2 BHK TYPE I 65.81 12 12 0
100%
2 BHK TYPE II 66.58 7 7 0
100%
2 BHK TYPE III 66.65 5 5 0
100%
2 BHK TYPE IV 66.88 2 2 0
100%
2 BHK TYPE V 67.65 2 2 0
100%
3 BHK TYPE I 79.95 10 10 0
100%
3 BHK TYPE II 80.72 10 10 0
100%

Mangeshi Dazzle - Iii Wing G

Type Carpet (sq.ft) Total Booked Available Status
2 BHK TYPE I 58.57 22 21 1
95%
3 BHK TYPE I 69.21 6 3 3
50%

Mangeshi Dazzle Iii Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE I 46.11 12 12 0
100%
1 BHK TYPE II 46.38 12 12 0
100%
2 BHK TYPE I 65.81 12 12 0
100%
2 BHK TYPE II 66.58 7 7 0
100%
2 BHK TYPE III 66.65 5 5 0
100%
2 BHK TYPE IV 66.88 2 2 0
100%
2 BHK TYPE V 67.65 2 2 0
100%
3 BHK TYPE I 79.95 10 10 0
100%
3 BHK TYPE II 80.72 10 10 0
100%

Mangeshi Dazzle Iii Wing D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK TYPE I 46.11 12 12 0
100%
1 BHK TYPE II 46.38 12 12 0
100%
2 BHK TYPE I 65.81 12 12 0
100%
2 BHK TYPE II 66.58 7 7 0
100%
2 BHK TYPE III 66.65 5 5 0
100%
2 BHK TYPE IV 66.88 2 2 0
100%
2 BHK TYPE V 67.65 2 2 0
100%
3 BHK TYPE I 79.95 10 10 0
100%
3 BHK TYPE II 80.72 10 10 0
100%

Construction Progress

MANGESHI DAZZE - III WING E

Basement (if any)100%

Mangeshi Dazze - Iii Wing E

Excavation100%

MANGESHI DAZZE - III WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Mangeshi Dazze - Iii Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MANGESHI DAZZE - III WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mangeshi Dazze - Iii Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

MANGESHI DAZZE - III WING E

Plinth100%
Podiums (if any) 0%

Mangeshi Dazze - Iii Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MANGESHI DAZZE - III WING E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mangeshi Dazze - Iii Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MANGESHI DAZZE - III WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mangeshi Dazze - Iii Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MANGESHI DAZZLE - III - WING A

Basement (if any)100%

Mangeshi Dazzle - Iii - Wing A

Excavation100%

MANGESHI DAZZLE - III - WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Mangeshi Dazzle - Iii - Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MANGESHI DAZZLE - III - WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mangeshi Dazzle - Iii - Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing79%

MANGESHI DAZZLE - III - WING A

Plinth100%
Podiums (if any) 0%

Mangeshi Dazzle - Iii - Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

MANGESHI DAZZLE - III - WING A

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Mangeshi Dazzle - Iii - Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MANGESHI DAZZLE - III - WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mangeshi Dazzle - Iii - Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MANGESHI DAZZLE - III - WING B

Basement (if any)100%

Mangeshi Dazzle - Iii - Wing B

Excavation100%

MANGESHI DAZZLE - III - WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Mangeshi Dazzle - Iii - Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MANGESHI DAZZLE - III - WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mangeshi Dazzle - Iii - Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing69%

MANGESHI DAZZLE - III - WING B

Plinth100%
Podiums (if any) 0%

Mangeshi Dazzle - Iii - Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

MANGESHI DAZZLE - III - WING B

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Mangeshi Dazzle - Iii - Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MANGESHI DAZZLE - III - WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mangeshi Dazzle - Iii - Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MANGESHI DAZZLE - III WING F

Basement (if any)100%

Mangeshi Dazzle - Iii Wing F

Excavation100%

MANGESHI DAZZLE - III WING F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Mangeshi Dazzle - Iii Wing F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MANGESHI DAZZLE - III WING F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mangeshi Dazzle - Iii Wing F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

MANGESHI DAZZLE - III WING F

Plinth100%
Podiums (if any) 0%

Mangeshi Dazzle - Iii Wing F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MANGESHI DAZZLE - III WING F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mangeshi Dazzle - Iii Wing F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MANGESHI DAZZLE - III WING F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mangeshi Dazzle - Iii Wing F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MANGESHI DAZZLE - III WING G

Basement (if any)0%

Mangeshi Dazzle - Iii Wing G

Excavation0%

MANGESHI DAZZLE - III WING G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Mangeshi Dazzle - Iii Wing G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MANGESHI DAZZLE - III WING G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Mangeshi Dazzle - Iii Wing G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

MANGESHI DAZZLE - III WING G

Plinth0%
Podiums (if any) 0%

Mangeshi Dazzle - Iii Wing G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

MANGESHI DAZZLE - III WING G

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Mangeshi Dazzle - Iii Wing G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

MANGESHI DAZZLE - III WING G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Mangeshi Dazzle - Iii Wing G

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

MANGESHI DAZZLE III WING C

Basement (if any)100%

Mangeshi Dazzle Iii Wing C

Excavation100%

MANGESHI DAZZLE III WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Mangeshi Dazzle Iii Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MANGESHI DAZZLE III WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mangeshi Dazzle Iii Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

MANGESHI DAZZLE III WING C

Plinth100%
Podiums (if any) 0%

Mangeshi Dazzle Iii Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MANGESHI DAZZLE III WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mangeshi Dazzle Iii Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MANGESHI DAZZLE III WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mangeshi Dazzle Iii Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MANGESHI DAZZLE III WING D

Basement (if any)100%

Mangeshi Dazzle Iii Wing D

Excavation100%

MANGESHI DAZZLE III WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Mangeshi Dazzle Iii Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MANGESHI DAZZLE III WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Mangeshi Dazzle Iii Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

MANGESHI DAZZLE III WING D

Plinth100%
Podiums (if any) 0%

Mangeshi Dazzle Iii Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MANGESHI DAZZLE III WING D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Mangeshi Dazzle Iii Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MANGESHI DAZZLE III WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mangeshi Dazzle Iii Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 70%
Energy management 70%
Fire Protection And Fire Safety Requirements 70%
Landscaping & Tree Planting 100%
Open Parking 70%
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 90%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.