📞 +91 98200 30685 ✉️
RERA: A51800043517

MAYFAIR VIRAR GARDENS BUILDING NO 23, 24 and 25

by MAYFAIR HOUSING Partnership
Certificate Signed P99000028348
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000028348
Registration No.
REA99000084951
Registration Date
2023-07-28
Developer
MAYFAIR HOUSING Partnership
Project Bank
ICICI BANK LIMITED
Proposed Possession
2026-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
2206.85 sq.m
Total FSI
29274.00
Approved FSI
20654.00
MahaRERA QR
MAYFAIR VIRAR GARDENS BUILDING NO 23, 24 and 25
MahaRERA — P99000028348
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors23
Sanctioned23
🅿️Closed Parking36
📅Completion2026-03-31
🏗️Proposed Floors23
Sanctioned23
🅿️Closed Parking38
📅Completion2026-03-31
🏗️Proposed Floors23
Sanctioned23
🅿️Closed Parking22
📅Completion2026-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 33.25 0 0 0
0%
2Bhk 44.15999984741211 0 0 0
0%
Shop 10.569999694824219 0 0 0
0%
Shop 10.670000076293945 0 0 0
0%
Shop 11.5 0 0 0
0%
Shop 11.550000190734863 0 0 0
0%
Shop 13.069999694824219 0 0 0
0%
Shop 13.329999923706055 0 0 0
0%
Shop 13.470000267028809 0 0 0
0%
Shop 13.569999694824219 0 0 0
0%
Shop 14.1899995803833 0 0 0
0%
Shop 15.65999984741211 0 0 0
0%
Shop 17.579999923706055 0 0 0
0%
Shop 20.59000015258789 0 0 0
0%
Shop 27.520000457763672 0 0 0
0%
Shop 36.34000015258789 0 0 0
0%
Shop 73.4800033569336 0 0 0
0%

Building Number 23

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.25 123 122 1
99%
2 BHK 44.16 42 41 1
98%
Shop 10.57 2 0 2
0%
Shop 11.55 2 0 2
0%
Shop 13.33 2 0 2
0%
Shop 13.47 2 0 2
0%
Shop 14.19 2 0 2
0%
Shop 15.66 2 0 2
0%

Building Number 24

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.25 123 109 14
89%
2 BHK 44.16 42 41 1
98%
Shop 10.57 2 0 2
0%
Shop 11.55 2 0 2
0%
Shop 13.33 2 0 2
0%
Shop 13.47 2 0 2
0%
Shop 14.19 2 0 2
0%
Shop 15.66 2 0 2
0%

Building Number 25

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.25 84 75 9
89%
2 BHK 44.16 39 38 1
97%
Shop 10.67 1 0 1
0%
Shop 11.5 1 0 1
0%
Shop 13.07 1 0 1
0%
Shop 13.57 1 0 1
0%
Shop 14.19 1 0 1
0%
Shop 17.58 1 0 1
0%
Shop 20.59 1 0 1
0%
Shop 27.52 1 0 1
0%
Shop 36.34 1 0 1
0%
Shop 73.48 1 0 1
0%

Construction Progress

Building Number 23

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building Number 24

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building Number 25

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing96%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises60%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 23%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains 10%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.